Loading...
APPROVED RESUB1 BLD2021-0955+G, MEP ETC PLANS+9.8.2021_1.33.59_PM+239773231 51 61 7I C VIRGINIA MASON EDMONDS FAMILY MEDICINE EXAM ROOMS THE HOWL OF EDMONDS Marina Beach Park Edmonds Woodway Esperance C_0 Fax 99 I I ECHO LAKE Shoreline 7315 212th Street S.W. Lynnwood 524� Ed ands Professional Center I (fr Mountlake Terrace VICINITY MA 2( a _ � Q Prestige Post -Acute and Remo.,. Virg Auda s Barber Shap Rarrea 5 Famois Fzza. 3urgerK'n9 Virg 212th St SW Woodway thigh Schooi 211 3t''. t s Q 2151h St 5W ids-Woodway Nigh School Swedish H th a 56St 5W 5,ved sh Edmrnds Carr ous, 216th St SW w swell io spec -arty �s C'nic - Edm... I—S Seattle 5k r, & Laser ztBth St SW V I LOCATION Lake Forest Park P NORTH PROJECT LOCATION _ -_ea 3Tntes Pos>aI Serv:ce'S Wa greers 208th St SW r- 1101'+51 SW , .� Va"e Neo Edmonds z 212th St SW Q � r r� ,ate - — Im��. Kali Creek Platt Electric Sugl Br er PLAN NORTH A Kp IX COOLING LOAD BASIS OF DESIGN: NO LOAD CALCULATIONS REQUIRED AS THE SPACE OCCUPANCY, TYPE, AND MECHANICAL EQUIPMENT IS NOT CHANGING. EDMONDS. WASHINGTON PROJECT DESCRIPTION: PROJECT SCOPE IS LIMITED TO REVISION OF SUPPLY/RETURN DIFFUSER LOCATION, NEW LIGHTING AND CONTROLS, AND INSTALLATION OF AN EXAM SINK. PROJECT LOCATION: 7315 212th STREET S.W. SUITE 207 EDMONDS, WASHINGTON 98026 OWNER VIRGINIA MASON xxx SEATTLE, WASHINGTON 98101 CONSULTANTS: ARCHITECT SABA 2 NICKERSON STREET SUITE 200 SEATTLE, WA 98109 PHONE: (206) 957-6400 CONTACT: xxx sabarch.com MECHANICAL & ELECTRICAL ENGINEERING ENGINEERING ECONOMICS INC. 1201 WESTERN AVENUE, SUITE 325 SEATTLE, WASHINGTON 98101 PHONE: (206) 622-1001 FAX: (206) 622-5747 CONTACT: DWIGHT GRAY www.eeiengineers.com DRAWING INDEX: GENERAL GO.01 COVER SHEET, LOCATION PLANS AND NOTES GO.02 SYMBOLS AND ABBREVIATIONS GO.03 SPECIFICATIONS MECHANICAL & ELECTRICAL MEP1.01 SCHEDULES AND DETAILS PHASE 1 MP1.10 SECOND FLOOR MECHANICAL AND PLUMBING PLANS — PHASE 1 E1.10 SECOND FLOOR ELECTRICAL PLANS — PHASE 1 ^-------� ^---------- r � 5 O I PHASE 1 I I El I I oo �0 2W. 0 I I I I I PHASE 2 I I I I I I I I I 0 PHASING PLAN NORTH PERMIT SET CODE INFORMATION: • 2018 INTERNATIONAL BUILDING CODE • 2018 INTERNATIONAL MECHANICAL CODE • 2018 WASHINGTON STATE ENERGY CODE • 2018 UNIFORM PLUMBING CODE (UPC) • 2020 NATIONAL ELECTRIC CODE (NEC) • WASHINGTON STATE AMENDMENTS • STATE OF WASHINGTON AMENDMENTS TO THE ABOVE CODES • WAC 296-46B L&I SAFETY STANDARDS, ADMIN AND INSTALLATION EXISTING DOAS ROOFTOP UNIT PROVIDES OSA VENTILATION TO THE SPACE FOR DISTRIBUTION BY WSHP UNITS LEGAL DESCRIPTION: PARCEL A: LOTS 6, 7 AND 8 AND THE SOUTH HALF OF LOT 9, BLOCK 5, SEATTLE HEIGHTS DIVISION 4, ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 9 OF PLATS, PAGE 11, IN SNOHOMISH COUNTY, WASHINGTON. TOGETHER WITH THE EAST 60 FEET OF THE WEST 180 FEET OF LOT 10 AND THE EAST 60 FEET OF THE WEST 180 FEET OF THE NORTH HALF OF LOT 9, BLOCK 5, SEATTLE HEIGHTS DIVISION 4, ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 9 OF PLATS, PAGE 11, IN SNOHOMISH COUNTY, WASHINGTON. TOGETHER WITH THE EAST 60 FEET OF THE WEST 120 FEET OF LOT 10, BLOCK 5, SEATTLE HEIGHTS DIVISION 4, ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 9 OF PLATS, PAGE 11, IN SNOHOMISH COUNTY, WASHINGTON. PARCEL B: (ADJOINING PARCEL WITH DETENTION SYSTEM EXTENSION) THE EAST 60 FEET OF LOT 10 AND THE EAST 60 FEET OF THE NORTH HALF OF LOT 9, BLOCK 5, SEATTLE HEIGHTS DIVISION 4, ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 9 OF PLATS, PAGE 11, IN SNOHOMISH COUNTY, WASHINGTON. PARCEL C: TOGETHER WITH LOT 10 AND THE NORTH HALF OF LOT 9, BLOCK 5, SEATTLE HEIGHTS DIVISION 4, ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 9 OF PLATS, PAGE 11, IN SNOHOMISH COUNTY, WASHINGTON. EXCEPT THE EAST 60 FEET OF SAID LOTS. ALSO EXCEPT THE WEST 180 FEET OF SAID LOTS. SITE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON. PARCEL NUMBERS: 005669-005-006-00 005669-005-006-02 005669-005-006-04 USE AND OCCUPANCY: BUSINESS MERCANTILE (ACCESSORY USE) INCIDENTAL USE MEDICAL OFFICES PHARMACY OPEN PARKING GARAGE (AMBULATORY/OUTPATIENT) AREA OF WORK _Lp 0 KEY PLAN 0 NORTH C� o = MCI N N O CO O CD C)O � O L X LL • O •� O G% o Co O • �.y O � O 5 W C - >c co VERI+ � O ;gy N 5 N 9-1co Cn Z Q O 0_ OU) w U o w U) 41 w D W'^ W N w Q 0 N I O z W U_ U Q U � � o N J .0 °' (C)C � N G 0 N OC) Q LL U) p O O41 O vi �� rn o Z O N 41 N N u7 E W W W rw U p0 ��'G^I*STEg1F'9J( '�' V ���� /y1 Dlgltallysig gM1t Gray D - -u _gh�9ray@ea gineers.00m, ng Econom cs, C-ight Gray Dwight Gray wA Reason: a"est to the accuracy and Integrity of this tloaument Contact Info: dwlghtgray@eeienglneersoom DESIGNED BY: DRAWN BY: RH RH DATE: APPROVED BY: 8/27/21 DG SCALE: FILE NAME: None .16 GO.01 PROJECT No: 21146.02 SHEET TITLE: Cover Sheet and Location Plans SHEET NUMBER: GO.01 n 4. C F G I MEP SYMBOLS LEGEND (NOT ALL SYMBOLS ARE USED ON THESE DRAWINGS) SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SINGLE DOUBLE HVAC PIPING AND PLUMBING MEDICAL GASES TELEPHONE AND COMPUTER SYSTEMS ABBREVIATIONS LINE LINE - DOMESTIC COLD WATER MA MEDICAL AIR < TELEPHONE OUTLET MOUNTED AT +18" AFF A AMPERES ®® DUCT CONNECTION TO SUPPLY DIFFUSER, REFER TO DETAILS DOMESTIC HOT WATER MAI MEDICAL AIR INTAKE (UPSTEAM OF THE MEDICAL AIR COMPRESSOR) TELEPHONE OUTLET MOUNTED AT +54" AFF AFF ABOVE FINISH FLOOR HOT WATER CIRCULATING MV MEDICAL VACUUM W AP ACCESS PANEL � DUCT CONNECTION TO RETURN GRILLES, REFER TO DETAILS - - W - - SOIL OR WASTE (BURIED) MVE MEDICAL VACUUM EXHAUST (DOWNSTEAM FROM < COMPUTER DATA OUTLET AHU AIR HANDLING UNIT W SOIL OR WASTE (SUSPENDED) THE MEDICAL VACUUM PUMP) COMBINATION TELEPHONE/DATA OUTLET AD AREA DRAIN ®® DUCT CONNECTION TO EXHAUST GRILLES, REFER TO DETAILS - - -V- - - PLUMBING VENT N NITROGEN C CONDUIT 2 NITROUS OXIDE EQUIPMENT CB CIRCUIT BREAKER SUPPLY AIR (SA) ELEVATION CHANGE (SOLID LINE UP, G NATURAL GAS 0 OXYGEN CC CONTROL CONTRACTOR BROKEN LINE DOWN) D EQUIPMENT DRAIN � ELECTRICAL PANELBOARD DIFF DIFFUSER DI DEIONIZED WATER 2-� � � � RETURN AIR (RA), RELIEF AIR OR EXHAUST (SOLID LINE UP, PC �G PUMPED CONDENSATE EVAC WASTE ANESTHETIC GAS EVACUATION ® E EQUIPMENT CONNECTION, E=EMERGENCY POWER DG DOOR GRILLE BROKEN LINE DOWN) GATE VALVE (ISOLATION VALVE) DIST DISTRIBUTION lEAZONE VALVE BOX DUCT RISE/DROP WITH 90° ELBOWS (RECTANGULAR DUCTS) Dew BALL VALVE AREA ALARM PANEL MOTOR CONNECTION -SINGLE PHASE (E) EXISTING EC ELECTRICAL CONTRACTOR 45 D y 45 D BUTTERFLY VALVE MASTER ALARM PANEL ? DUCT RISE/DROP W/ 45° ELBOWS (RECTANGULAR DUCTS) WALL CEILING /a MOTOR CONNECTION -THREE PHASE ELEV ELEVATION PRESSURE REDUCING VALVE ❑A MEDICAL AIR OUTLET EM EMERGENCY —�2 E-17717-3 DUCT RISE/DROP W/ 90° ELBOWS (OVAL DUCTS) PRESSURE REGULATING VALVE 0 MEDICAL VACUUM OUTLET IT] TRANSFORMER EPO EMERGENCY POWER OFF ❑N NITROGEN OUTLET EAT ENTERING AIR TEMPERATURE D ZE DUCT RISE/DROP W/ 45° ELBOWS (ROUND OR OVAL DUCTS) 2-WAY AUTOMATIC CONTROL VALVE CIRCUITS EQ EQUAL DISTANCE 2 �2 NITROUS OXIDE OUTLET 3-WAY AUTOMATIC CONTROL VALVE a ❑0 OXYGEN OUTLET BRANCH CIRCUIT WIRING SHOWING HOMERUN TO PANELBOARD/ EWT ENTERING WATER TEMPERATURE DUCT RISE/DROP W/ 90° ELBOWS (ROUND DUCTS) 2-WAY AUTOMATIC CONTROL VALVE (TWO POSITION) O ❑E EVACUATION 3A1/1,3,5 CIRCUITS INDICATED. HASH MARKS INDICATE NUMBER EXH EXHAUST W j OF WIRES. #12 AWG WIRE U.O.N. TWO WIRES PLUS ESP EXTERNAL STATIC PRESSURE R=1.5 W RADIUS ELBOW 3-WAY AUTOMATIC CONTROL VALVE (TWO POSITION MODULATING) PULSE SENSOR GROUND IF NO HASH MARKS SHOWN. LONG HASH MARK DENOTES NEUTRAL. t INDICATES GROUND WIRE. FCO FLOOR CLEAN OUT SQUARE ELBOW WITH TURNING VANES SAFETY RELIEF VALVE HIGH/LOW PRESSURE SWITCH CONDUIT CONCEALED (INCLUDING ABOVE SUSPENDED CEILING FD GC FLOOR DRAIN GENERAL CONTRACTOR SQUARE/RECTANGULAR BRANCH TAKE -OFF Y4 W s 4 VACUUM SWITCH & UNDER RAISED FLOOR) GFI GROUND FAULT CIRCUIT INTERRUPTER 45 yy OR 6" MIN. SOLENOID VALVE GR GRILLE - - - - - CONDUIT BURIED (UNDERGROUND OR IN FLOOR SLAB) Q VACUUM GAUGE HOA HAND/OFF/AUTOMATIC SELECTOR SWITCH RECTANGULAR/ROUND, ROUND/ROUND BRANCH TAKE -OFF C GATE VALVE WITH HOSE END AA AREA ALARM PANEL RACEWAY UP IE INVERT ELEVATION w C BALL VALVE W/ HOSE END DVB DOUBLE VALVE BOX RACEWAY DOWN JB JUNCTION BOX RADIUS TEE � CHECK VALVE E01 EMERGENCY OXYGEN INLET LAV LAVATORY R=��5WV �� RACEWAY STUB -OUT WITH BUSHING LAT LEAVING AIR TEMPERATURE SQUARE TEE W/ TURNING VANES STRAINER WITH BLOW OFF MA MASTER ALARM PANEL HOMERUN TO PANEL OR LOCATION NOTED LWT LEAVING WATER TEMPERATURE � MVP MEDICAL VACUUM PLANT MA MIXED AIR w BULLHEAD TEE STRAINER OM OXYGEN MANIFOLD CIRCUIT CONTINUATION MD MOTORIZED DAMPER 45° TRANSITION -ECCENTRIC (15° MAX. SUPPLY) (30° THERMOMETER S VACUUM BOTTLE SLIDE J J � a JUNCTION BOX CEILING OR WALL MOUNTED MCB MAIN CIRCUIT BREAKER MAX. RETURN/EXHAUST) 4 WG WALL GAUGE MC MECHANICAL CONTRACTOR 'T THERMOMETER IN WELL PB PULL BOX MCC MOTOR CONTROL CENTER -2 TRANSITION - CONCENTRIC (15° MAX. SUPPLY) (30° ML MOTORIZED LOUVER �--�-2 MAX. RETURN/EXHAUST) SENSOR WELL _ EXISTING RACEWAY (IF HASH MARKS ARE SHOWN, PULL NEW CONDUCTORS) MVD MANUAL VOLUME DAMPER BOOT TEE TAKE OFF FROM THE BOTTOM OF THE DUCT BOTTOM TT LIGHTING (N) NEW OF THE DUCT TEMPERATURE SENSOR IN WELL FLUORESCENT FIXTURE, WALL MOUNTED " CONDUIT SEAL N NEUTRAL 45 DEG. RADIUS ELBOW T TEMPERATURE SENSOR WM__qLI SURFACE METAL RACEWAY (WIREMOLD G-4000 SERIES) NC NORMALLY CLOSED Y WITH RECEPTACLES AND/OR DEVICES INDICATED NO NORMALLY OPEN BELLMOUTH TAKE OFF WITH VOLUME DAMPER PRESSURE GAUGE IN FIXTURE INDICATES SWITCHLEG CONTROL N.I.C. NOT IN CONTRACT - � Q SURFACE MOUNTED OR RECESSED LIGHTING FIXTURE NTS NOT TO SCALE 2 BOOT -TEE TAKE OFF WITH VOLUME DAMPER PRESSURE GAUGE WITH COCK SEE SCHEDULE WORK DEFINITION OA OUTSIDE AIR PUMP Q WALL MOUNTED LIGHTING FIXTURE CONNECTION TO EXISTING OFCI OWNER FURNISHED, CONTRACTOR INSTALLED FLEXIBLE DUCT CONNECTOR PRV PRESSURE REDUCING VALVE ,_, PRESSURE/TEMPERATURE TEST TAP 0 RECESSED WALL WASHER ® DISCONNECTION FROM EXISTING RA RETURN AIR Z---�-2 VOLUME DAMPER REDUCED PRESSURE BACKFLOW PREVENTOR I--� � STRIP LIGHT CEILING MOUNTED TYPE CFM RG RETURN GRILLE GRILLE, REGISTER AND DIFFUSER CALLOUT SWBD SWITCHBOARD L] MOTORIZED DAMPER FLOOR DRAIN FLOOR SINK 2 Sa STRIP LIGHT WALL MOUNTED SWITCH -SINGLE POLE, SUBSCRIPTS a,b, etc., DENOTES SIZE 1 M1.1 INDICATES DETAIL AND SHEET NUMBER WHERE ADDITIONAL INFORMATION ABOUT DETAIL CAN BE FOUND S SA SINK SUPPLY AIR ® FLOOR CLEANOUT CIRCUIT CONTROLLED SG SUPPLY GRILLE ;; � BACKDRAFT DAMPER EF MECHANICAL EQUIPMENT CALLOUT; REFER TO TSP TOTAL STATIC PRESSURE BDD`Y - BDD �CO CLEANOUT S3 3-WAY SWITCH 1 MECHANICAL EQUIPMENT SCHEDULE TYP TYPICAL OPPOSED BLADE DAMPER UR URINAL I WCo WALL CLEANOUT S4 4-WAY SWITCH WC-1 PLUMBING FIXTURE CALLOUT V VOLTS PARALLEL BLADE DAMPER WALL HYDRANT OR HOSE BIBB ]D DIMMER Fx LIGHTING FIXTURE TYPE - SEE FIXTURE SCHEDULE VAV VARIABLE AIR VOLUME VTR VENT THROUGH ROOF ACCESS PANEL io PIPE ELBOW UP OP PHOTOCELL WC WATER CLOSET PIPE ELBOW DOWN Fx LIGHTING FIXTURE TYPE -SEE LIGHT FIXTURE SCHEDULE 1 INDICATES SECTION AND SHEET NUMBER WHERE WCO WALL CLEAN OUT xx SECTION CAN BE FOUND WP WEATHERPROOF DUCT LINER PIPE TEE UP RECEPTACLES XFMR TRANSFORMER .. PIPE TEE DOWN FLEXIBLE DUCT ] PIPE CAP OR PLUG DUPLEX RECEPTACLE 1 O DETAIL / FLAG NOTE NOTE: NOT ALL REQUIRED PIPE FLEXIBLE CONNECTION DUPLEX RECEPTACLE ON EMERGENCY SYSTEM CHANGES IN DIRECTION AREAil� REVISION SYMBOL SHOWN ON THE DRAWINGS. FOURPLEX RECEPTACLE ---------- REMOVE EXISTING MECHANICAL EQUIPMENT/WORK PIPE UNION FOURPLEX RECEPTACLE ON EMERGENCY SYSTEM FIRE DAMPER CONCENTRIC REDUCER G DUPLEX RECEPTACLE -GROUND FAULT CIRCUIT ECCENTRIC REDUCER INTERRUPTER TYPE SMOKE DAMPER EXPANSION JOINT 0113 DUPLEX RECEPTACLE -ISOLATED GROUND (�— COMBINATION FIRE/SMOKE DAMPER DIRECTION OF FLOW ,rye S DUPLEX RECEPTACLE -SAFETY TYPE OT THERMOSTAT PITCH DOWN DUPLEX RECEPTACLE -MOUNTED +3" ABOVE COUNTER BACKSPLASH, ❑T TEMPERATURE SENSOR HT� RECEPTACLE 208V OR 240V, SINGLE PHASE TEMPERATURE SENSOR WITH TAMPER RESISTANT GUARD MCI CD N N CNI CO CD O L X � ii • G% o N o r 2 W C � to co oEl�+ 1 o ;gy N N 9_1 �(nW z 0 0 o_ o' O w U o W v, W Q) U) N w 1 Q 0 N 1 00 0 z W U_ U Q � � U � � o N ° (n N 0 N OC) LL (n p ( ) O O � O a_ �, (N +, � 0' o rn z O o X O -0 N N N �E 3 W W W DESIGNED BY: DRAWN BY: RH RH DATE: APPROVED BY: 8/27/21 DG SCALE: FILE NAME: None .16 G0.02 PROJECT No: 21146.02 SHEET TITLE: Legends and Abbreviations SHEET NUMBER: GO.02 C MECHANICAL SPECIFICATIONS ABRIDGED VERSION (APRIL 2005) TABLE OF CONTENTS SECTION 15010 - GENERAL REQUIREMENTS SECTION 15060 - MECHANICAL SUPPORTS SECTION 15080 - MECHANICAL INSULATION SECTION 15100, 15400 PIPING / PLUMBING SECTION 15210 - MEDICAL GAS SECTION 15300 - FIRE PROTECTION SECTION 15650 - REFRIGERATION SECTION 15700, 15800 HVAC SECTION 15780 - ENERGY COMPLIANCE SECTION 15910 - CONTROLS SECTION 15950 AIR / HYDRONIC BALANCING SECTION 15010 - GENERAL REQUIREMENTS PART 1 - GENERAL 1.01 FURNISH ALL MATERIALS, EQUIPMENT, TOOLS, AND LABOR RELATED TO THE INSTALLATION OF THE MECHANICAL WORK AS INDICATED ON THE DRAWING AND SPECIFICATION HEREIN. CONNECT ALL FACILITIES TO BE INSTALLED FOR A COMPLETELY COORDINATED AND INTEGRATED MECHANICAL SYSTEM. IT IS THE INTENT AND PURPOSE OF THESE DRAWINGS AND SPECIFICATIONS THAT, UPON COMPLETION OF PROJECT, THE MECHANICAL INSTALLATION, INCLUDING ALL SYSTEMS, SHALL BE COMPLETE AND OPERABLE IN ALL RESPECTS. 1.02 NEW WORK SHALL BE OF THE HIGHEST INDUSTRY STANDARD. THE GOOD APPEARANCE OF THE FINISHED WORK SHALL BE OF EQUAL IMPORTANCE WITH ITS MECHANICAL EFFICIENCY. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH ACCEPTABLE INDUSTRY PRACTICES. 1.03 THE DRAWINGS ARE DIAGRAMMATIC IN CHARACTER AND INDICATE THE GENERAL ARRANGEMENT OF MECHANICAL WORK, BUT DO NOT INDICATE EVERY REQUIRED OFFSET, FITTINGS, OR ACCESSORY. LOCATIONS ARE APPROXIMATE AND SHALL BE SUBJECT TO MINOR MODIFICATIONS. FIELD VERIFY ALL CRITICAL COMPONENTS AND DIMENSIONS. RECORD MODIFICATIONS ON "AS-BUILT"DRAWINGS. 1.04 CERTAIN VERTICAL AND HORIZONTAL OFFSETS ARE SHOWN IN DUCTS AND PIPING TO INDICATE THE GENERAL POSITION RELATIONSHIP OF THE SYSTEMS WITHIN THE SPACE AVAILABLE FOR SYSTEM INSTALLATION. PROVIDE ADDITIONAL OFFSETS AS REQUIRED TO COORDINATE WITH INSTALLATION REQUIREMENTS OF OTHER SYSTEMS. 1.05 ARRANGE AND PAY FOR ALL NECESSARY PERMITS, FEES, INSPECTION SERVICES, TAXES, AND ROYALTIES IN CONNECTION WITH THE MECHANICAL WORK ON THIS PROJECT. 1.06 ALL WORK, MATERIALS, AND EQUIPMENT SHALL COMPLY WITH THE RULES AND REGULATIONS OF ALL CODES AND ORDINANCES OF THE LOCAL, STATE, AND FEDERAL AUTHORITIES. SUCH CODES, WHERE APPLICABLE, SHALL TAKE PRECEDENCE OF THESE PLANS AND SPECIFICATIONS. 1.07 MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2018 EDITIONS OF THE INTERNATIONAL BUILDING CODE, INTERNATIONAL PLUMBING CODE, INTERNATIONAL FIRE CODE, 2015 EDITION OF THE INTERNATIONAL MECHANICAL CODE, THE 2020 NFPA NATIONAL ELECTRICAL CODE, DEPARTMENT OF HEALTH, OFFICE OF STATEWIDE HEALTH PLANNING AND DEVELOPMENT (OSHPD), AND LOCAL CODES AND ORDINANCES. 1.08 IN THE EVENT OF A CONFLICT OR INCONSISTENCY BETWEEN ITEMS INDICATED ON THE PLANS AND/OR SPECIFICATIONS OR WITH CODE REQUIREMENTS, THE NOTE, SPECIFICATION, OR CODE THAT PRESCRIBES AND ESTABLISHES THE MORE COMPLETE JOB OR THE HIGHER STANDARD SHALL PREVAIL. 1.09 THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING CURRENT REQUIREMENTS WITH THE MANUFACTURER OF THE PRODUCTS USED ON THE PROJECT AND NOTIFY THE ARCHITECT/ENGINEER OF RECORD IF ANY DISCREPANCIES ARE FOUND BEFORE ANY WORK TO INSTALL THE PRODUCT IS PERFORMED. 1.10 WHEREVER MORE THAN ONE (1) MANUFACTURER'S PRODUCT IS SPECIFIED, THE FIRST -NAMED PRODUCT IS THE BASIS FOR THE PROJECT DESIGN AND THE USE OF ALTERNATIVE NAMED MANUFACTURER'S PRODUCTS OR SUBSTITUTES MAY REQUIRE MODIFICATIONS IN THE PROJECT DESIGN AND CONSTRUCTION. IF SUCH ALTERNATIVES ARE PROPOSED BY THE CONTRACTOR AND ARE FAVORABLY REVIEWED BY THE RESPONSIBLE DESIGN PROFESSIONAL, THE CONTRACTOR SHALL ASSUME ALL COSTS REQUIRED TO MAKE NECESSARY REVISIONS AND MODIFICATIONS TO THE ORIGINAL PROJECT DESIGN INCLUDING ADDITIONAL COSTS FOR EVALUATIONS OF THE MODIFICATIONS BY THE RESPONSIBLE DESIGN PROFESSIONAL. 1.11 A. SUBMIT THREE (3) COPIES OF SUBMITTAL DATA FOR MECHANICAL MATERIAL AND EQUIPMENT TO ENGINEERING ECONOMICS, INC. FOR REVIEW PRIOR TO ORDERING OR FABRICATION OF THE MATERIAL OR EQUIPMENT. B. SUBMITTALS WILL BE REVIEWED BY ENGINEERING ECONOMICS, INC. ONLY FOR THE PURPOSE OF DETERMINING THAT THE MATERIALS, EQUIPMENT, AND INSTALLATION METHODS ARE IN ACCORDANCE WITH THE PROJECT DESIGN CONCEPTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SPACE REQUIREMENTS, CONFIGURATIONS, PERFORMANCE, BASES, SUPPORTS, STRUCTURAL MEMBERS AND OPENINGS IN STRUCTURE, AND OTHER APPARATUS THAT MAY BE AFFECTED BY THE MATERIAL, EQUIPMENT, OR INSTALLATION. C. NOTE ANY DEVIATIONS FROM SPECIFIED REQUIREMENTS. D. ORGANIZE SUBMITTALS TO INCLUDE AS A MINIMUM THE FOLLOWING: COVER SHEET INDICATING GENERAL CONTENTS BY APPLICABLE SPECIFICATION SECTION NUMBER AND ITEM NAME. E. THE DATA FOR EACH ITEM SUBMITTED SHALL BE THOROUGHLY EDITED FOR THE SPECIFIC EQUIPMENT AND INTENDED APPLICATION AND OPERATION. F. INCLUDE CURRENT PUBLISHED CATALOG AND SPECIFICATION SHEETS PERTAINING TO PROPOSED MATERIAL AND EQUIPMENT. INCLUDE ELECTRICAL CHARACTERISTICS, WIRING AND CONTROL DIAGRAMS. G. IDENTIFY EACH ITEM WITH IDENTIFICATION CODE IDENTICAL TO THOSE USED ON THE DRAWINGS AND IN THE SPECIFICATIONS. 1.12 A. LOCATIONS AND SIZES OF EXISTING UTILITIES ARE SHOWN IN ACCORDANCE WITH THE EXISTING BUILDING RECORD DRAWINGS AND ON -SITE OBSERVATIONS. CHECK AND VERIFY ALL DATA GIVEN, AND VERIFY EXACT LOCATIONS OF ALL UTILITIES PERTAINING TO THE WORK. B. THE CONTRACTOR SHALL VISIT THE EXISTING BUILDINGS) AND GROUNDS AND FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS. EXISTING RECORD DRAWINGS ARE AVAILABLE IN THE FACILITIES ENGINEERING DEPARTMENT FOR CONTRACTOR REVIEW. NO SUBSEQUENT ALLOWANCE ON BEHALF OF THE CONTRACTOR WILL BE MADE FOR OMISSIONS, ERRORS, OR NEGLIGENCE ON THE CONTRACTOR'S PART FOR NOT FAMILIARIZING THEMSELVES WITH EXISTING CONDITIONS. C. VERIFY AT PROJECT SITE EXACT SIZE, LOCATION, AND CLEARANCES OF EXISTING SERVICES AND MECHANICAL AND ELECTRICAL EQUIPMENT. D. THE CONTRACTOR SHALL REMOVE, RELOCATE, REPLACE WITH NEW AND/OR RECONNECT ALL EXISTING SERVICES AS REQUIRED BY NEW CONSTRUCTION. 1.13 IF ANY PART OF THE CONTRACTOR'S WORK DEPENDS UPON THE WORK OF A SEPARATE CONTRACTOR, THE CONTRACTOR SHALL INSPECT SUCH OTHER WORK AND PROMPTLY REPORT IN WRITING TO THE OWNER ANY DEFECTS IN SUCH OTHER WORK THAT RENDERS IT UNSUITABLE TO PERFORM THE WORK OF THIS CONTRACTOR. FAILURE OF THIS CONTRACTOR TO SO INSPECT AND REPORT SHALL CONSTITUTE AN ACCEPTANCE OF THE OTHER CONTRACTOR'S WORK, EXCEPT AS TO DEFECTS, WHICH MAY DEVELOP IN OTHER CONTRACTOR'S WORK AFTER EXECUTION OF THIS CONTRACTOR'S WORK. 1.14 INSTALL ALL PIPING AND DUCTWORK TO AVOID ARCHITECTURAL FRAMING, STRUCTURAL MEMBERS, AND OTHER OBSTRUCTIONS. COORDINATE PIPING AND DUCTWORK LOCATION WITH ALL APPLICABLE CONTRACT DRAWINGS AND INSTALLATION WORK OF OTHER TRADES. 1.15 CLEARANCES AND ACCESS SHALL BE MAINTAINED ON ALL NEW AND EXISTING EQUIPMENT TO ENSURE PROPER EQUIPMENT MAINTENANCE. 1.16 THE CONTRACTOR SHALL MAKE THEIR OWN PROVISIONS FOR DELIVERY AND SAFE STORAGE OF ALL MATERIALS AND SHALL ASSUME FULL RESPONSIBILITY FOR CONDITIONS AND/OR SAFEKEEPING OF MATERIALS, FURNISHED BY OTHERS UPON ACCEPTANCE OF SAME. 1.17 THE CONTRACTOR SHALL ASSUME SOLE RESPONSIBILITY FOR SAFETY OF ALL PERSONS ON OR ABOUT THE CONSTRUCTION SITE, IN ACCORDANCE WITH APPLICABLE LAWS AND CODES. GUARD ALL HAZARDS IN ACCORDANCE WITH THE SAFETY PROVISIONS OF THE LATEST MANUAL OF ACCIDENT PREVENTION PUBLISHED BY THE ASSOCIATED PRIME CONTRACTORS OF AMERICA AND OSHA. 1.18 A. PHASING OF THE WORK FOR THIS PROJECT SHALL BE COORDINATED BY THE PRIME CONTRACTOR, AND PERFORMED WITH A MINIMUM OF DISRUPTION TO THE FACILITIES OPERATION. REFER TO THE ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL PHASING INFORMATION. B. COORDINATE AND SCHEDULE ALL WORK WITH THE FACILITY INCLUDING CONSTRUCTION ACCESS AND STORAGE. THE CONSTRUCTION SCHEDULE AND HOURS OF WORK SHALL BE APPROVED BY THE FACILITY PRIOR TO THE START OF CONSTRUCTION. C. ALL UTILITIES REQUIRED FOR THE CONTINUOUS OPERATION OF ALL EXISTING FACILITIES MUST BE MAINTAINED IN SERVICE AT ALL TIMES EXCEPT AS REQUIRED FOR NEW SYSTEMS CONNECTION. COORDINATE SHUTDOWN WITH RESPONSIBLE FACILITY PERSONNEL. D. ALL SERVICE SHUTDOWNS AND START-UPS SHALL BE SCHEDULED A MINIMUM OF 72 HOURS IN ADVANCE AND SUPERVISED BY THE FACILITY ENGINEERING STAFF. E. ALL FACILITY OPERATIONS SHALL REMAIN UNINTERRUPTED AND UNDISTURBED. ALL WORK IN OCCUPIED AREAS SHALL BE SCHEDULED DURING OFF -HOURS AND COORDINATED WITH THE FACILITY SO THAT SUCH WORK IS COMPLETED, AREA CLEANED, AND ALL SERVICES RESTORED AND CODE COMPLIANT PRIOR TO RETURNING TO NORMAL OPERATING HOURS. F. ALL CONNECTIONS TO EXISTING SERVICES SHALL BE MADE DURING APPROVED OFF -HOURS. SERVICE SHALL BE RESTORED AND CODE -COMPLIANT PRIOR TO NORMAL HOURS. NO SERVICE INTERRUPTIONS DURING NORMAL HOURS ARE ALLOWED UNLESS OTHERWISE APPROVED BY THE FACILITY ENGINEERING DEPARTMENT. 1.19 ALL REMOVED ITEMS DEEMED TO HAVE VALUE BY THE OWNER SHALL BE DELIVERED TO A PLACE OF STORAGE AT THE SITE AS DIRECTED. ALL OTHER ITEMS MUST BE DISPOSED OF OFF -SITE IN A LEGAL MANNER. 1.20 WHERE EXISTING CONSTRUCTION IS CUT, DAMAGED, OR REMODELED, PATCH WITH MATERIALS TO MATCH IN KIND, QUALITY, AND PERFORMANCE. 1.21 ALL PIPE AND DUCT SIZES ARE IN INCHES. 1.22 THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING AND PROVIDING ALL CEILING ACCESS, PATCHING, AND REPAIR REQUIRED IN THE IMMEDIATE AREA OF THE WORK AND ANY ACCESS OUTSIDE THE IMMEDIATE AREA OF THE WORK REQUIRED TO PROVIDE COMPLETE AND PROPERLY FUNCTIONING SYSTEMS. 1.23 THE GENERAL CONTRACTOR SHALL PROVIDE ALL ACCESS PANELS. THE MECHANICAL CONTRACTOR SHALL COORDINATE THE LOCATION AND QUANTITY OF ALL ACCESS PANELS. PANELS ARE REQUIRED IN HARD CEILINGS FOR ALL TERMINAL UNITS, DAMPERS, VALVES, CONTROLS, AND OTHER ITEMS REQUIRING ROUTINE MAINTENANCE OR ADJUSTMENT, AND SHALL BE FURNISHED AND INSTALLED IN ACCORDANCE WITH ARCHITECTURAL SPECIFICATIONS. 1.24 CLEAN ALL NEW SURFACES AND NEW EQUIPMENT AFTER THE COMPLETION OF THE INSTALLATION. 1.25 WARRANTY: THE CONTRACTOR SHALL GUARANTEE ALL WORKMANSHIP, MATERIALS, AND EQUIPMENT FURNISHED AND INSTALLED HEREUNDER FOR A PERIOD OF 365 CALENDAR DAYS FROM THE DATE OF FINAL ACCEPTANCE OF WORK BY OWNER, AGAINST ALL DEFECTS AND FAULTY WORKMANSHIP. PARTIAL OCCUPANCY OF PROJECT SITE BY OWNER SHALL NOT BE CONSTRUED AS FINAL ACCEPTANCE OF WORK. CONTRACTOR SHALL REPAIR AND/OR REPLACE ALL DEFECTIVE AND/OR FAULTY WORKMANSHIP, MATERIALS, AND/OR EQUIPMENT, AND SHALL REPAIR AND/OR REPLACE ALL OTHER WORK DAMAGED AS A RESULT OF SUCH DEFECTIVE AND/OR FAULTY WORKMANSHIP, MATERIALS, AND/OR EQUIPMENT WITHOUT CHARGE TO OWNER DURING WARRANTY PERIOD. 1.26 CONTRACTORS SHALL MAINTAIN RECORDED "AS -BUILT" INFORMATION ON ALL EXISTING SERVICES/EQUIPMENT RELATED TO THE PROJECT UNCOVERED DURING CONSTRUCTION AND ALL NEW WORK INSTALLED DURING CONSTRUCTION AND IT SHALL BE CLEARLY MARKED IN COLORED PENCIL ON A PRINT OF PRODUCT DRAWINGS. RECORDED INFORMATION SHALL INCLUDE ROUTING, ACTUAL LOCATIONS, POINTS OF CONNECTIONS, ELEVATIONS, OR OTHER INFORMATION THAT DEVIATES FROM THE ORIGINAL DESIGN DRAWINGS. THE CONTRACTOR SHALL TURN RECORDED "AS -BUILT" INFORMATION OVER TO ENGINEERING ECONOMICS, INC. AT THE COMPLETION OF THE PROJECT. 1.27 PROVIDE PERMANENT, COMMERCIAL QUALITY PRE-PRINTED IDENTIFICATION ON ALL NEW EQUIPMENT, TERMINAL UNITS, VALVES, DUCTWORK, AND PIPING. 1.28 THE MECHANICAL SYSTEM FOR THIS PROJECT IS BASED ON THE FOLLOWING CRITERIA: ROOF "U" VALUE (BTUH/S.F., F) _ .051 WALL "U" VALUE (BTUH/S.F., F) _ .050 FLOOR "U" VALUE (BTUH/S.F., F) _ .0 GLASS "U" VALUE (BTUH/S.F., F) _ .65 W/MULLION LOSS GLASS SHADE COEFF = .80 LIGHTING (WATTS/S.F.) = 1.3 MISC. EQUIP. (WATTS/S.F.) = 2.0 PEOPLE DENSITY (PEOPLE/140 S.F.) = 1.0 COOLING INDOOR DESIGN TEMP ( F) =74 F COOLING OUTDOOR DESIGN TEMP ( F) =82.0 F HEATING INDOOR DESIGN TEMP ( F) =70.0 F HEATING OUTDOOR DESIGN TEMP ( F) =24.0 F VENTILATION RATE =15.0 CFM/PERSON (OUTSIDE AIR CFM/PERSON) SECTION 15060 - MECHANICAL SUPPORTS PART 1 - GENERAL 1.01 DO NOT SUPPORT PIPING OR VALVES FROM PIECES OF EQUIPMENT. 1.02 SECURELY FASTEN ALL PIPING AND DUCTWORK WITHIN STRUCTURES TO THE BUILDING CONSTRUCTION BY MEANS OF HANGERS, SUPPORTS, GUIDE ANCHORS, AND SWAY BRACE SEISMIC RESTRAINTS TO MAINTAIN ALIGNMENT, TO PREVENT SAGGING, AND TO PREVENT NOISE AND EXCESSIVE STRAIN DUE TO MOVEMENT UNDER OPERATING CONDITIONS. 1.03 PIPE SUPPORTS SHALL BE DESIGN TO INCLUDE THE WEIGHT OF THE PIPE AND THE WEIGHT OF THE CONTENTS OF THE PIPE. 1.04 ALL MECHANICAL EQUIPMENT SUPPORTS SHALL BE DESIGNED BY A LICENSED STRUCTURAL ENGINEER AND SHALL COMPLY WITH THE INTERNATIONAL BUILDING CODE SEISMIC REQUIREMENTS. 1.05 PROVIDE CALCULATIONS AND DETAILS FOR THE SUPPORT AND BRACING OF ALL PIPES, DUCTS, AND CONDUITS, OR PROVIDE SUPPORT AND BRACING PER OSHPD ANCHORAGE PRE -APPROVAL NO. R-0010, THE SMACNA "GUIDELINES FOR SEISMIC RESTRAINTS OF MECHANICAL SYSTEMS AND PLUMBING PIPING SYSTEMS" OR OSHPD ANCHORAGE PRE -APPROVAL NO. 0003 "THE SUPERSTRUT SEISMIC RESTRAINT SYSTEM FOR PIPES AND CONDUIT". 1.06 PROVIDE SEISMIC RESTRAINTS ON ALL EQUIPMENT AS REQUIRED BY CCR, TITLE 24, TABLE 23-P WHERE EQUIPMENT WEIGHT IS OVER 400 LBS, AND THE EQUIPMENT IS DIRECTLY MOUNTED ON THE FLOOR OR ROOF OR WHERE THE EQUIPMENT WEIGHT IS OVER 20 LBS. AND THE EQUIPMENT IS SUSPENDED FROM THE ROOF, FLOOR, WALL, OR IS MOUNTED ON VIBRATION ISOLATORS. 1.07 REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR ADDITIONAL REQUIREMENTS. SECTION 15080 - MECHANICAL INSULATION PART 1 - GENERAL 1.01 INSULATE ALL MECHANICAL SYSTEMS PER THE LATEST EDITION OF THE WASHINGTON STATE ENERGY CODE, AND THE MECHANICAL MATERIALS SCHEDULE. PART 2 - PRODUCTS 2.01 ALL PIPING AND DUCTWORK INSULATION AND COVERINGS SHALL HAVE AN ASTM FLAME SPREAD RATING OF 25 OR LESS AND AN ASTM SMOKE DEVELOPED RATING OF 50 OR LESS. PART 3 - EXECUTION 3.01 PROVIDE CONTINUOUS INSULATION AROUND ALL PIPE FITTINGS AND ACCESSORIES. PROVIDE UNBROKEN VAPOR SEAL ON ALL COLD SURFACES. PROVIDE ONE-PIECE PVC PLASTIC JACKETING ON FITTINGS. ALL HANDLES, PLUGS AND OTHER MAINTENANCE ITEMS SHALL BE ACCESSIBLE WITHOUT DAMAGING INSULATION. 3.02 PROVIDE A VAPOR BARRIER COVERING ON ALL ROOF DRAIN, RAIN LEADER, AND COLD WATER PIPING INSULATION. SECTION 15100, 15400 PIPING / PLUMBING PART 1 - GENERAL 1.01 PIPE INSTALLATION SHALL COMPLY WITH THE MECHANICAL CONTRACTING FOUNDATION INC'S "GUIDELINES FOR QUALITY PIPING INSTALLATION", LATEST EDITION, EXCEPT A SPECIFICALLY NOTED, AND THE 2003 INTERNATIONAL PLUMBING CODE. 1.02 INSTALL ALL PIPING TO BEST SUIT FIELD CONDITIONS AND COORDINATE WITH THE INSTALLATION WORK OF OTHER TRADES. THE DRAWINGS ARE DIAGRAMMATIC AND SHALL NOT BE SCALED TO DETERMINE EXACT LOCATION OF PIPING. 1.03 FOR EXACT ROUGH -IN LOCATIONS AND ELEVATIONS OF PLUMBING FIXTURES REFER TO ARCHITECTURAL DRAWINGS, UPC AND MANUFACTURER'S RECOMMENDATIONS. 1.04 CLEAN OUTS SHALL BE INSTALLED SO THEY ARE EASILY ACCESSIBLE. 1.05 HEAT TRACING OF PIPING, WHERE INDICATED, SHALL BE PROVIDED AND INSTALLED BY THE PLUMBING CONTRACTOR. THE PLUMBING CONTRACTOR IS TO COORDINATE THE HEAT TRACE WIRING SUPPLY WITH THE ELECTRICAL CONTRACTOR. PART 2 - PRODUCTS 2.01 PROVIDE LOOSE KEY STOPS OR ANGLE VALVES AT ALL FIXTURES. 2.02 PROVIDE TRAP PRIMERS FOR ALL FLOOR DRAINS. 2.03 PROVIDE DIELECTRIC CONNECTIONS BETWEEN DISSIMILAR METALS. PART 3 - EXECUTION 3.01 PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOORS SHALL BE SLEEVED, AND FIRE STOPPED WITH LISTED MATERIALS SO AS TO MAINTAIN THE INTEGRITY AND RATING OF THE FLOOR OR WALL. 3.02 PLUMBING EQUIPMENT, VALVES, AND TRAP PRIMERS SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS. UNLESS SHOWN ON ARCHITECTURAL DRAWINGS, REQUIRED ACCESS PANELS SHALL BE PROVIDED BY THE PLUMBING CONTRACTOR AND INSTALLED BY THE GENERAL CONTRACTOR. 3.03 THE PLUMBING CONTRACTOR SHALL PROVIDE AND LOCATE ALL REQUIRED FLOOR, WALL, AND FOOTING SLEEVES. 3.04 TRENCHING, BACKFILLING, AND COMPACTING FOR UNDERGROUND PIPING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 3.05 SLOPE ALL RAIN LEADER, STORM, AND WASTE PIPING AT 2% UNLESS OTHERWISE NOTED ON DRAWINGS. OBTAIN APPROVAL FROM CODE AUTHORITY BEFORE INSTALLING PIPING AT LESS THAN 2% (EVEN IF LESSER SLOPE IS INDICATED ON DRAWINGS). 3.06 DO NOT INSTALL VALVES, WITH STEMS POINTING DOWNWARD OR BELOW A HORIZONTAL PLANE. PROVIDE REMOTE ACTUATION IF THE VALVE IS INACCESSIBLE. 3.07 PROVIDE VALVES AND OTHER PIPING SPECIALTIES SAME SIZE AS LINE SIZE SHOWN UNLESS OTHERWISE NOTED. 3.08 INSTALL SWING CHECK VALVES IN THE HORIZONTAL POSITION. 3.09 A. PROVIDE SHOCK ABSORBERS AT ALL SOLENOID VALVES, QUICK -CLOSING VALVES, AND AT EACH PLUMBING FIXTURES OR BATTERY OF PLUMBING FIXTURES WITH FLUSH VALVES ON COLDWATER SUPPLY BRANCHES OR ANY EQUIPMENT WHICH MIGHT PRODUCE WATER HAMMER. SIZE AND LOCATIONS SHALL BE IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. B. MOUNT SHOCK ABSORBER AS CLOSE TO THE LINE OR QUICK -CLOSING VALVE AS POSSIBLE. REMOTE MOUNTING OR NIPPLE MOUNTING IN EXCESS OF 6 INCHES IS NOT ACCEPTABLE. C. INSTALL SHOCK ABSORBERS WITH FULL SIZE BALL VALVE AND UNION FROM PIPE TO SHOCK ARRESTOR. D. INSTALL 12-INCH BY 12-INCH MINIMUM ACCESS PANEL CENTERED ON EACH SHOCK ARRESTER THAT IS OTHERWISE INACCESSIBLE. 3.10 WATER PIPE CONNECTIONS TO COILS SHALL BE MADE TO ACHIEVE COUNTER FLOW BETWEEN WATER AND AIR. 3.11 PRIOR TO UTILIZATION OF NEWLY CONSTRUCTED OR ALTERED DOMESTIC WATER PIPING SYSTEMS; ALL AFFECTED DOMESTIC WATER PIPING SHALL BE STERILIZED USING PROCEDURES PRESCRIBED IN AWWA C651-92. SECTION 15700, 15800 - HVAC PART 1 - GENERAL 1.01 DUCT CONSTRUCTION SHALL COMPLY WITH THE MOST CURRENT EDITION OF THE SMACNA DUCT CONSTRUCTION STANDARDS. 1.02 ALL DUCT DIMENSIONS ARE CLEAR INSIDE SIZES. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED. 1.03 ALL JOINTS OF THE DUCT SYSTEMS SHALL BE SEALED WITH GASKETS OR LISTED MASTIC TYPE DUCT SEALANT. DUCT TAPE SHALL NOT BE USED AS THE PRIMARY DUCT SEALANT. 1.04 PROVIDE FIRE/SMOKE DAMPERS WHERE INDICATED ON PLANS AND AS REQUIRED BY SECTION 4306 (J) OF THE 1997 UBC [1998 CBC]. PROVIDE CEILING FIRE DAMPERS WHERE INDICATED ON PLANS AND AS REQUIRED BY SECTION 713.10 OF THE 1997 UBC [1998 CBC]. INSTALL FIRE/SMOKE DAMPERS AND CEILING FIRE DAMPERS IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS, THE TERMS OF THEIR LISTING, AND THE REQUIREMENTS OF THE CODE. COORDINATE ELECTRICAL REQUIREMENTS WITH THE ELECTRICAL CONTRACTOR. 1.05 ALL MOTOR STARTERS, UNLESS NOTED OTHERWISE, ARE TO BE PROVIDED BY AND INSTALLED BY THE ELECTRICAL CONTRACTOR. PART 2 - PRODUCTS 2.01 DUCT MATERIALS/CONSTRUCTION: GALVANIZED STEEL, LOCK FORMING QUALITY WITH A ZINC COATING OF 1.25 OUNCES PER SQUARE FOOT ON EACH SIDE. GAUGE PER APPLICABLE SMACNA DUCT MANUALS. 2.02 FLEXIBLE DUCTS SHALL CONSIST OF A REINFORCED VAPOR BARRIER, 1-1/2-INCH FIBERGLASS INSULATION, AND NON -PERFORATED INTERIOR LINER WITH WIRE HELIX. DUCT SHALL BE UL 181 LISTED CLASS 1 AIR DUCT. FLEXIBLE DUCTS SHALL ONLY BE USED WHERE SHOWN AND SHALL NOT EXCEED 3 FEET IN LENGTH UNLESS NOTED OTHERWISE. PART 3 - EXECUTION 3.01 HVAC EQUIPMENT, VALVES, AND DAMPERS SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS. 3.02 WERE SPACE CONSTRAINTS DO NOT ALLOW THE INSTALLATION OF SPECIFIED RECTANGULAR OR ROUND DUCT, THE CONTRACTOR MAY SUBSTITUTE A RECTANGULAR OR ROUND DUCT OF A DIFFERENT CONFIGURATION AS LONG AS THE REVISED PRESSURE LOSS DOES NOT EXCEED THE ORIGINAL PRESSURE LOSS AND THE DUCT ASPECT RATIO DOES NOT EXCEED 3 TO 1. 3.03 LOW WALL EXHAUST REGISTERS SHALL BE INSTALLED WITH BOTTOM OF REGISTER 6 INCHES ABOVE FINISHED FLOOR UNLESS OTHERWISE NOTED. 3.04 HIGH SIDEWALL REGISTERS SHALL BE INSTALLED AT ELEVATIONS DELINEATED IN ARCHITECTURAL ELEVATION. WHERE ELEVATIONS ARE NOT SPECIFIED, OUTLETS SHALL BE INSTALLED WITH TOP OF REGISTER WITHIN 6 INCHES OF CEILING. 3.05 MULTIPLE REGISTERS ON A COMMON WALL SHALL BE INSTALLED AT SAME ELEVATION. 3.06 COORDINATE REGISTER, DIFFUSER, AND GRILLE LOCATIONS WITH CEILING SUPPORT MEMBERS AND LIGHTING FIXTURES. FINISHED CEILING CONFIGURATION SHALL FORM A FULLY INTEGRATED INSTALLATION IN EACH FINISHED SPACE. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS AND ELECTRICAL PLANS TO COORDINATE LAYOUT. 3.07 PRIOR TO THE START-UP OF THE NEW AND EXISTING AIR HANDLING UNITS AND TERMINAL UNITS, CLEAN ALL INTERIOR SURFACES AND COILS. 3.08 INTERIOR DUCTWORK AND HAVE ALL "START-UP" FILTERS IN PLACE. SYSTEMS SHALL NOT BE STARTED WITHOUT OWNER INSPECTION AND APPROVAL. SECTION 15780 - ENERGY COMPLIANCE PART 1 - GENERAL 1.01 THE EXISTING CENTRAL HVAC SYSTEMS WILL BE REUSED; THEREFORE, NO ENERGY COMPLIANCE CALCULATIONS ARE REQUIRED. MECHANICAL WORK INVOLVES ONLY MODIFICATIONS OF LOCATION OF SUPPLY DIFFUSERS, RETURN DIFFUSERS, AND TEMPERATURE CONTROLS. SECTION 15910 -CONTROLS PART 1 - GENERAL 1.01 THE DDC SYSTEM SHALL BE FULLY INTEGRATED AND INSTALLED AS A COMPLETE PACKAGE BY A SINGLE CONTRACTOR. THE CONTRACTOR SHALL FURNISH ALL MATERIALS, INCLUDING ALL HARDWARE AND SOFTWARE, OPERATOR INPUT/OUTPUT PERIPHERAL, FIELD HARDWARE PANELS, SENSORS AND FIELD CONTROL DEVICES, INSTALLED WIRING AND PIPING. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENGINEERING, SUPERVISION OF INSTALLATION, LABOR SERVICES, SYSTEM CALIBRATION, INITIAL SOFTWARE PROGRAMMING, AND SYSTEM CHECKOUT AS NECESSARY TO PROVIDE A COMPLETE AND FULLY OPERATIONAL DDC SYSTEM AS OUTLINED IN THIS CONTROL POINT LIST AND THE SEQUENCE OF OPERATION. 1.02 THE CONTROL SYSTEM FOR THIS PROJECT SHALL BE PROVIDED AND INSTALLED BY ATS ALERTON CONTROLS. ALL CONTROLS SHALL BE FURNISHED TO THE CONTRACTOR AND THE EQUIPMENT MANUFACTURERS BY THE OWNER THROUGH THE ATS/VMMC PREFERRED CUSTOMER AGREEMENT." THE CONTROLS CONTRACTOR SHALL COORDINATE DISTRIBUTION AND INSTALLATION. SECTION 15950 - AIR / HYDRONIC BALANCING PART 1 - GENERAL 1.01 BALANCING OF THE HVAC SYSTEMS SHALL BE PREFORMED BY A NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) CERTIFIED BALANCING CONTRACTOR IN ACCORDANCE WITH ASHRAE SYSTEMS HANDBOOK, CHAPTER ON TESTING ADJUSTING, AND BALANCING, AND NEBB GUIDELINES. 1.02 UPON COMPLETION OF BALANCING THE SYSTEM, PROVIDE ENGINEERING ECONOMICS, INC. WITH A FINAL REPORT CERTIFYING THE RESULTS OF THE BALANCING WORK. MCI L �LO N N (0 ro (DC O x ii ' bA C o •� 0.0 o G% o m rn a o > C W a, Q L (n CD Cu bpi' a)N m VERI+ a)O IRA 9_1 �(nW Al z Q o E O w U o w cn 41 Lu L_ D W N Lu Q � N I 00 6 z LLJ U_ U Q � (3)� U � � o N J O °' (C) N G 0 N OC) LL (n U)� O O a_ (N � 0' o rn Z O X O EN -0 N N � v C: E Lu Lu W r w L . r WAS.hr I54Cid� `4 0 EGI STEg�'9 SS1 IN. Dlgitelly si� ight Gray C=U ght gray@eeiengineers.com, g Economics, CN=Dwight Gray Dwight Gr R IonI tt,,t Ground, WA Reason: attest to the accuracy antl integrity of this tlocument Contact Info: tlwighl.gray@eeiengineers.com DESIGNED BY: DRAWN BY: RH RH DATE: APPROVED BY: 8/27/21 DG SCALE: FILE NAME: None .16 G0.03 PROJECT No: 21146.02 SHEET TITLE: Specifications SHEET NUMBER: GO-03 0 Fm 0 c F 5 6 PLUMBING FIXTURE SCHEDULE TAG DESCRIPTION MANUFACTURER and MODEL FITTINGS FIXTURE CONNECTIONS ACCESSORIES NOTES CW FU I HW FU I W FU I V FU I L-1 WALL HUNG VITREOUS CHINA KOHLER K-2054—N-0 CHICAGO 895-317GN8AE73ABCD 3/8 I 1 3/8 1 1 1 /4 1 1 /4 1, 2, 3, 4, 5 GENERAL SCHEDULE NOTES: 1. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF FIXTURES AND MOUNTING HEIGHTS. 2. PROVIDE INSULATION COVERS FOR EXPOSED PLUMBING UNDER ADA SINKS. 3. REMOVE AERATORS FROM ALL FAUCETS. 4. PROVIDE CLEANOUTS ON ALL SINK AND LAV TRAPS. 5. DECK MOUNTED CHICAGO FAUCET WITH 4" WRITBLADE HANDLES MOUNTED ON 4" CENTERS, DRILLED FOR CARRIER SUPPORT MATERIALS SCHEDULE ITEM MATERIAL JOINING REFERENCE INSULATION NOTES DESCRIPTION METHOD STANDARDS THICKNESS DOMESTIC COLD WATER DUCTILE IRON PUSH ON TYPE WITH ASTM—C151 PIPE (BELOW GRADE) CLASS 51 < 4" SINGLE RUBBER SEAL AWWA—C110 — > 2 1 /2" CLASS 50 > 4" OR MECHANICAL TYPE DOMESTIC HOT AND COLD < 3" NON —LEAD, WATER PIPE COPPER/L NON —ANTIMONY SOLDER ASTM-1388 1" FOR =&< 2" PIPE (ABOVE GRADE) =&> 3" GROOVED FITTING ASTM-13813 FLUX 1 1 /2" FOR > 2" PIPE MECHANICAL PIPE COUPLING SOIL AND WASTE PIPE SERVICE WEIGHT CAST IRON, NO —HUB ASTM—A888 — (ABOVE GRADE) COPPER DWV CISPI 301 SOIL AND WASTE PIPE SERVICE WEIGHT CAST IRON, NO —HUB FITTINGS WITH ASTM—A888 — (BELOW GRADE) XH CLASS HEAVY DUTY COUPLINGS CISPI 301 VENT PIPE CAST IRON WITH CAST NO —HUB 1" WITHIN 5 FEET FROM (ABOVE GRADE) IRON DRAINAGE FITTINGS BUILDING EXTERIOR VENT PIPE CAST IRON NO —HUB FITTINGS WITH ASTM—A74-94 — (BELOW GRADE) HEAVY DUTY COUPLINGS GALVANIZED STEEL, LOCK PER APPLICABLE SMACNA SUPPLY AIR DUCTWORK, FORMING QUALITY WITH A DUCT MANUAL, ALL JOINTS 1" (R-3.3) GAUGE PER APPLICABLE RECTANGULAR ZINC COATING OF 1.25 OUNCES TO BE SEALED WITH GASKETS SMACNA EXTERNAL WRAP SMACNA DUCT MANUAL, PER SQUARE FOOT ON OR LISTED MASTIC TYPE DUCT USE +4" PRESSURE CLASS EACH SIDE SEALANT (NO DUCT TAPE) GALVANIZED STEEL, SINGLE HEAVY DUTY FLANGE. WALL LINED —OR— WITH COORDINATE FLANGE EXTERNAL INSULATION, REQUIREMENTS WITH SUPPLY AIR DUCTWORK, SPIRAL LOCKSEAM, LOCK STRUCTURAL ENGINEER, 1" (R-3.3) GAUGE PER APPLICABLE ROUND AND FLAT OVAL FORMING QUALITY WITH A PER APPLICABLE SMACNA SMACNA EXTERNAL WRAP SMACNA DUCT MANUAL, ZINC COATING OF 1.25 OUNCES DUCT MANUAL, ALL JOINTS USE +4" PRESSURE CLASS PER SQUARE FOOT ON TO BE SEALED WITH GASKETS EACH SIDE OR LISTED MASTIC TYPE DUCT SEALANT (NO DUCT TAPE) GALVANIZED STEEL, LOCK PER APPLICABLE SMACNA RETURN AIR DUCTWORK, FORMING QUALITY WITH A DUCT MANUAL, ALL JOINTS 4" EXTERIOR DUCT GAUGE PER APPLICABLE ROUND AND FLAT OVAL ZINC COATING OF 1.25 OUNCES TO BE SEALED WITH GASKETS SMACNA (WITH ALUMINUM SMACNA DUCT MANUAL PER SQUARE FOOT ON OR LISTED MASTIC TYPE DUCT WEATHER PROOF BARRIER) EACH SIDE SEALANT (NO DUCT TAPE) FIBERGLASS RIGID, MOLDED, 3" WIDE VAPOR BARRIER PIPE INSULATION NON COMBUSTIBLE, TAPE ASTM—0547 — FOIL SCRIM KRAFT JACKET FLEXIBLE FIBERGLASS BLANKET, ASTM—0553 K VALUE= 0.27 © 75' DUCT INSULATION FACTORY APPLIED FOIL SCRIM VAPOR JOINT SEAL TYPE 1 — DENSITY= 3.0 LBS/CU FT KRAFT VAPOR BARRIER JACKET CLASS B-2 MINIMUM THERMAL RESISTANCE= 3.3 DUCT SOUNDLINING FIBERGLASS DUCT LINING (WHERE INDICATED ON COATED TO PREVENT FIBER ASTM—C1071 1" K VALUE= 0.27 @ 75' THE DRAWINGS) EROSION AT VELOCITIES UP TO DENSITY= 3.0 LBS/CU FT 4000 FPM GENERAL SCHEDULE NOTES: 1. ALL MATERIALS REQUIRED FOR THIS PROJECT MAY NOT BE LISTED IN SCHEDULE. 2. REFER TO MECHANICAL SPECIFICATIONS AND APPLICABLE STANDARDS FOR FURTHER INFORMATION. 3. ALL INSULATION LOCATIONS SHALL COMPLY WITH THE CURRENT WASHINGTON STATE ENERGY CODE. ROOF 77 REFER TO DRAWINGS FOR SIZES AND CONTINUATION — 1 WATER PROOF MASTIC CLAMPING RING MOLDED PIPE FLASHING BY G.C. REINFORCING RINGS MEMBRANE ROOF & LAP SEALANT BY G.C. STEEL FLANGE WELDED TO PIPE AND ANCHORED TO ROOF DECK OR RISER CLAMP WELDED TO DECK PIPE THROUGH ROOF DETAIL NOT TO SCALE GRILLE/REGISTER/DIFFUSER SCHEDULE TAG MANUFACTURER AND MODEL SERVICE FACE TYPE MOUNTING DAMPER MATERIAL NOTES TYPE S1 PRICE SMCD SUPPLY 4 WAY LAY —IN NA NA STEEL 1, 2, 3 R1 PRICE 1OFF RETURN PERF LAY —IN STEEL 1, 2, 3 l[0008 1. MAX NOISE CRITERIA NC SHALL BE NC = 35 UNLESS NOTED OTHERWISE. 2. SEE DRAWINGS FOR CFM AND NECK SIZE. (DIFFUSER INLET TO BE SAME SIZE AS FLEX DUCT) 3. PROVIDE BORDER TYPE TO MATCH CEILING. LIGHTING FIXTURE SCHEDULE TAG MANUFACTURER MODEL VOLTAGE BALLAST LAMP TYPE MOUNTING NOTES F1 LITHONIA GTL SERIES 2GTL 4 3OLGZ10 LP830 120 N/A LED RECESSED 1 F2 HEALTHCARE HALF CYLINDER WALL SCONCE HPSC 120 N/A LED WALL MOUNT 2 F3 LITHONIA GTL SERIES 2GTL 4 3OLGZ10 LP830 120 N/A LED RECESSED 1,3 SPECIFIC SCHEDULE NOTES: 1. NO DIMMING CONTROLS, INTEGRAL PIR SENSOR IN SWITCH 2. VERIFY FIXTURE MOUNTING HEIGHT WITH OWNER 3. EMERGENCY 700 LUMEN BATTERY OPTION TO BE INCLUDED MCI CD N N � CD O Z. o X �co bA •� o G% o CD r � a? c (5L, to p co VERB � o ;gy N N 9_1 _CnC/) Al z o E O w U o W cn W L_ D N w I Q � N I 00 6 z W U U Q � U o N J 0 °' N G N CO LL (n 0 �^ VCCJ G O4-1 O 0 w Ui (N N N 0 � � z O X O -0 N N N � 3 E W W W � Uj L WAS.hr � q � � 54350 4 O� "1 STEg�'9/�j-S Di9ita1111y O Gray ray@eeiengineers.com, 0- onomics, CN=Dwight Gray Dwight yRo�i etoth, WA Rea:on. ,tt,", to me aeen�aer ana mte9my or Cis ao 1 - contact Into: 27 11 20 58-0aiengineers cam Date: 2021 082J 11:20'.88-0]'c0' DESIGNED BY: DRAWN BY: RH RH DATE: APPROVED BY: 8/27/21 DG SCALE: FILE NAME: None .16 MEP1.01 PROJECT No: 21146.02 SHEET TITLE: Schedules and Details Phase 1 SHEET NUMBER: MEP1.01 1 2 3 0 5 n. 7 111 A I B 0 PARTIAL FLOOR PLAN - HVAC DEMOLITION 0 Scale: 1 /4"=1'—O" NORTH 3 PARTIAL FLOOR PLAN - PLUMBING NEW WORK Scale: 1 /4"=1'—O" rZ� 0 NORTH E I F I G I H 0 PARTIAL FLOOR PLAN - HVAC NEW WORK 0 Scale: 1 /4"=1'—O" NORTH SPECIFIC NOTES THIS SHEET: OCONNECT DOMESTIC HOT & COLD WATER SUPPLY TO NEW LAVATORY SINK FIXTURE BELOW FLOOR. FIELD VERIFY EXACT LOCATION. 20 CONNECT NEW LAVATORY SINK WASTE LINE TO EXISTING 3" NO —HUB WASTE LINE IN FLOOR. FIELD VERIFY EXACT LOCATION. 30 EXTEND NEW 1Y2" VENT THROUGH ROOF. SEE DETAIL 1, SHEET MEP1.01. 04 EXISTING DOAS UNIT ON ROOF PROVIDES OSA VENTILATION TO INTERSTITIAL SPACE FOR DISTRIBUTION TO OCCUPIED SPACES. I MCI CD N N (DC O L x � ii ' � o •� o G% o N � .^, a o > n L (nco � a) to p � M VERB N O ;gy N N 9_1 U) C/) Al Z Q O a_ O w U o w w Q) Cn Ln�/� N w I Q � N I 00 6 LLJ z w U U Q � (D U � � o N J O °' (C) N G N � L (n 0 �^ VCJ C O4-1 O 0 (n " � (N N N 0 � � Z O X O -0 N N N � � E w w W r- w DESIGNED BY: DRAWN BY: DG RH DATE: APPROVED BY: 8/27/21 DG SCALE: FILE NAME: As Noted MP1.01 PROJECT No: 21146.02 SHEET TITLE: Second Floor Mechanical and Plumbing Plans Phase 1 SHEET NUMBER: M P 1 . 10 U1 1 2 3 0 5 n 7 111 III C F I G I H PARTIAL FLOOR PLAN - LIGHTING DEMOLITION3 Scale: 1 /4"=1'—O" NORTH PC3-20 1 .iJ 1 i IP71 / 1 I I REMOVE EXI 1 1 1 `1 WSHP-5 11 78 MCA-480V-3PH ,E P 2 PARTIAL FLOOR PLAN - POWER DEMOLITION Scale: 1 /4"=1'—O" 0 PARTIAL FLOOR PLAN - LIGHTING NEW WORK 0 Scale: 1 /4"=1'—O" NORTH 2 #12 THHN+G; N4" EMT 2 #10 THHN+G; 3Y4" EMT SPECIFIC NOTES THIS SHEET: OCONDUIT AND CONDUCTORS FOR BRANCH CIRCUITS, IN GENERAL, HAVE NOT BEEN SHOWN. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INSTALL NECESSARY WIRE AND CONDUIT FOR A COMPLETE SYSTEM, HOMERUN FROM FIRST DEVICE TO PANE SHALL BE INDICATED ON AS —BUILT DRAWINGS. 20 REPLACE WITH NEW LED RECESSED LIGHTING FIXTURE PER LIGHTING SCHEDULE. COORDINATE WITH ARCHITECTURAL RCP. 30 DEMO EXISTING 208 OUTLET AND RETURN USE OF BRANCH CIRCUIT TO PANEL LOCATED IN IDF ROOM ACROSS THE HALL. 04 PROVIDE WALL MOUNTED SWITCH WITH INTEGRAL OCCUPANCY SENSOR SET FOR 30 MINUTE AUTO OFF AFTER MANUAL SWITCH ON. 50 PROVIDE FIXTURES WITH DIMMER CONTROLS AND OCCUPANCY SENSOR FOR 30 MINUTE AUTO OFF AFTER MANUAL SWITCH ON. O DATA DROPS TO BE LOCATED IN WALL AT HEIGHT TO BE SPECIFIED BY OWNER. COORDINATE DATA NETWORK CONNECTIONS WITH OWNER IT TECHNICIANS. 70 MOUNT OUTLET AT 40" AFF. 80 COORDINATE WALL LOCATION FOR QUADPLEX OUTLET WITH EQUIPMENT VENDOR. OROUTE NEW 208V BRANCH CIRCUIT FROM EXISTING ELECTRICAL ROOM. ELECTRICIAN TO VERIFY PANEL/CIRCUIT AVAILABILITY. El I El ELECTRICAL ROOM (SOURCE OF POWER FOR 208V CIRCUIT AREA OF WORK 0 0 � 0 4 PARTIAL FLOOR PLAN - POWER NEW WORK 0 PARTIAL PLAN NORTH Scale: 1 /4"=1'-0" NORTH Scale: None NORTH I CD N N U C/� V ( O C O L iu � v � bA C o •� o G% o N N y a o C > a, W ti Cu N gyp'' a) N co lug�y a) '� N 'Cu � N O a �Cn� z 0 0 o_ O w U o w In w Q) Cn Ln�/� N w I Q � N I 00 6 LLJ z w U U Q � U � � o N J O °' (C) N 0 In lb LL U) //� V) O � O w (N N a� o � E O X O -0 N N � 3 E w w w w �T L. WA$hr � I ' EGISTEgF' Digitallyn' 1 ht Gray )NA& WS, E- o gray@eeiengineers.com, En a omits, CN=Dwlght Gray Dwight ally at,th,,WA Re : attest to the accuracy and integrity of this document Contact Info: 27 11. 20 31-0eiengineers.com Date: 2021.08 2] 11:20:31-0]'00' DESIGNED BY: DRAWN BY: DG RH DATE: APPROVED BY: 8/27/21 DG SCALE: FILE NAME: As Noted E1.01 PROJECT No: 21146.02 SHEET TITLE: Second Floor Electrical Plans Phase 1 SHEET NUMBER: E1.10