REVIEWED BLD2021-1456 Lighting Calc SSL 2018REVIEWED
BY
CITY OF EDMONDS
SUMMARY
2018 WSEC Compliance Forms for Commercial Buildings including Group R2, R3 & R4 over 3 stories and all RI R P r P I \, P In, istcred by: 02021 NEEA, All rights reserved
Project & Applicant
Information
Project Title
Seattle Skin and Laswer - 2018 WSEC
For Building Department Use: I Date: Nov 23, 2021
Nov 23 2021
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Project Address
21727 76th Ave West
F
Edmonds, WA 98026
Applicant Name
PP
Gina Dais
Applicant Phone
425-778-1530
Applicant Email
gdais@tgbarchitects.com
For questions about this report, contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com
General Occupancy
All Commercial
General Building Use Type
Office, Medical
Building and. Floor Area
1,876
General Project Types
Alteration
New Building or
Addition
Lighting Scope
g g P
Alteration
Lighting Scope
Interior Lighting
Project Cond. Floor Area
1,876
Floors Above Grade
2
Compliance Method
Compliance Method 1 -General
Lighting Project Description
Lighting Compliance Scope
Project Type
Interior / Exterior (interior includes both interior & parking)
Luminaire Replacement Scope
Compliance Method
Adjustment LPA Calculation
Compliance Verification
and Method
Alteration
Interior Lighting
50 % or more replaced
Space by space
No Calculation Adjustments allowed
COMPLIES
Additional Efficiency
Options Included
Project a Seattle Skin and Laswer - 2018 WSEC Date I Nov 23, 2021
Lighting Power Calculation I ALTERATION - INTERIOR LIGHTING (50% or more replaced) Compliance Verification I COMPLIES
Compliance Method I Space by space I LPA Calculation Adjustment I none
Interior Lighting Power Allowance - Space by Space
General Space Type
Specific Space Type
Ceding
Height (Ft)
Gross Interior Area (SF)
LPA (Watts/SF)
Total Watts Allowed
(SF x LPA x 1)
Total Proposed Watts
(LPD + Display LPD)
Compliance Status
Copy/print room
39
0.31
12
Lobby
General
287
0.84
241
Office
Enclosed less than 250 sf
116
0.74
86
Restroom
General
46
0.63
29
Healthcare facility
Corridor
280
0.71
199
Healthcare facility
Exam/treatment room
99
1.40
139
Healthcare facility
Exam/treatment room
114
1.40
160
Healthcare facility
Exam/treatment room
112
1.40
157
Healthcare facility
Exam/treatment room
130
1.40
182
Healthcare facility
Exam/treatment room
100
1.40
140
Healthcare facility
Exam/treatment room
137
1.40
192
Healthcare facility
Lounge/breakroom
126
0.42
53
Healthcare facility
Medical supply room
66
0.62
41
Proposed Total LPD
726
Totalsl
1,629
726
COMPLIES
Proposed
Lighting Power Density EL
Fixture Type
Fixture ID
Quantity of
Fixtures (#F)
Watts or
Wattage Limit
per Fixture
(WpF)
Total Linear
Feet (LF)
Watts per Linear
Foot (WpLF)
Total Watts
Proposed
(#F x WpF) or
(LF x WpLF)
Individual Fixtures
Troffer
2x2 LED Panel
9
29
261
Troffer
2x4 LED Panel
1
55
55
Troffer
2x2 LED Panel
8
29
232
Troffer
2x4 LED Panel
2
55
110
Recessed cove lighting
Cove Light
2
18
36
Recessed downlight
LED Can
1
16
16
Recessed downhght
LED Can
2
8
16
Proposed Total LPD
726
Project Title Seattle Skin and Laswer - 2018 WSEC Date Nov 23, 2021
Proposed Fixtures Details
ALTERATION - INTERIOR LIGHTING (50% or more replaced)
Fixture Type/Application
Fixture ID
Location in Documents Lamp Type
New or
Existing -to -Remain
Individual Fixtures
Troffer
2x2 LED Panel
211, 212, 213, 214, 216, 221, 222, and 223 LED
New
Fixture Description:
Are these fixtures located within a daylight zone?:
Do these fixtures require specific application lighting controls?:
Troffer
2x4 LED Panel 202 LED
New
Fixture Description:
Are these fixtures located within a daylight zone?:
Do these fixtures require specific application lighting controls?:
Troffer
2x2 LED Panel 200 LED
New
Fixture Description: LED Panel
Are these fixtures located within a daylight zone?: Yes, controls provided
Do these fixtures require specific application lighting controls?: Exit access & egress lighting per IBC Section 1006.1
Troffer
2x4 LED Panel 205 LED
New
Fixture Description:
Are these fixtures located within a daylight zone?:
Do these fixtures require specific application lighting controls?:
Recessed cove fighting
Cove Light 201 LED
New
Fixture Description: LED Cove
Are these fixtures located within a daylight zone?: Yes, controls provided
Do these fixtures require specific application lighting controls?: None required
Recessed downlight
LED Can 206 LED
New
Fixture Description:
Are these fixtures located within a daylight zone?:
Do these fixtures require specific application lighting controls?:
Recessed downlight
LED Can 201 LED
New
Fixture Description: LED Can
Are these fixtures located within a daylight zone?: No
Do these fixtures require specific application lighting controls?: None required