MEMORANDUM
Date: January 30", 2020
To: Ethan Maiefski
213 Elm Street
Edmonds, WA 98020
Alm.
Re: Holdowns
STRUCTURAL
ENGINEERING
From: Nicholas Carter
Project: Maiefski Residence
Project# AS
copy to: Jim Muser - Aspects
Based on the attached email and photos the following items required structural approval:
1. The HDU4 anchor is acceptable where located. The corner studs should be nailed
together with 16d@6" oc vertical.
2. The attachment of the holdowns to the existing concrete is acceptable based on the
photographs provided.
If there are any additional questions do not hesitate to contact us.
Nicholas Carter SE