Loading...
HOLD DOWN INSPECTIONBC'YKA O�NREN QUINN l; 00 MEMORANDUM Date: January 30", 2020 To: Ethan Maiefski 213 Elm Street Edmonds, WA 98020 Alm. Re: Holdowns STRUCTURAL ENGINEERING From: Nicholas Carter Project: Maiefski Residence Project# AS copy to: Jim Muser - Aspects Based on the attached email and photos the following items required structural approval: 1. The HDU4 anchor is acceptable where located. The corner studs should be nailed together with 16d@6" oc vertical. 2. The attachment of the holdowns to the existing concrete is acceptable based on the photographs provided. If there are any additional questions do not hesitate to contact us. Nicholas Carter SE nvc@bcc-se.com -, nna9 @i. §k A.m— WOOr 0-0 1i MA n0-0OS nna_OaA 770A ......... Orn_CC ..n..,