LANDSCAPE ESTIMATEE S U B
JAN 0 3 2018
BUIWING I ffARTM T
CITY OF EDMONCI
Project name and number Edmonds Apartments
landscape preliminary estimate 12/27/2017
QUANTITY COST EACH TOTAL
SOIL
PLANTING BEDS 200 25 CY 5000
RAIN GARDEN AREAS 10 35 CY 350
BARK 50 30 CY 1500
PLANTS and Labor
TREES: CONIFERS
45
100 EACH
4500
TREES: DECIDUOUS
27
175 EACH
4725
SHRUBS: 5 GALLON
111
35 EACH
3885
SHRUBS 2/3 GALLON
79
25 EACH
1975
SHRUBS/G.C: 1 GALLON
770
6 EACH
4620
LABOR AND WARRANTY/MISC.
0.25 percentage
4926.25
IRRIGATION:
CONTROLLER and LABOR
1
500 EACH
500
EQUIPMENT
4800
1 SF
4800
TOTAL 36781.25