Approved Bond WorksheetSite Improvement Bond Quantity Worksheet S15 Webdate: 04/03/201F
LA King County
Department of Permitting & Environmental Review
35030 SE Douglas Street, Suite 210
Snoqualmie, Washington 98065-9266 For alternate formats, call 206-296-6600.
206-296-6600 M Relay 711
Project Name: NYLAND APARTMENTS Date: 3/30/2018
Location: 8509 244TH STREET SW, EDMONDS
Clearing greater than or equal to 5,000 board feet of timber?
yes X no
If yes,
Forest Practice Permit Number:
(RCW 76.09)
Yer.�6w,t�c�,
oq I (Job (0
Page 1 of 9
Nyland-BondQuant-BLD 170899.xlsx
Project No.:
Activity No.:
BLD20170899/0900
Note: All prices include labor, equipment, materials, overhead and
profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
WAS,, ./
35646
FS 'PFGI STFOP G�
ONAL
RES U B
APR 0 4 2018
BUILDING DEPARTMEN i
CITY OF EDMONDS
� APPROVED AS NOTE
r • Unit prices updated: 3/2/2015
Date: 4 I f; t6 Version: 3/2/2015
4 Report Date: 3/30/2018
Site Improvement Bond Quantity Worksheet S15 Web date: 04/03/201f
Reference #
Unit
Price
Unit
Quantity
# of
Applications
Cost
EROSION/SEDIMENT CONTROL
Number
Backfill & compaction -embankment
ESC-1
$ 6.00
CY
Check dams, 4" minus rock
ESC-2
SWDM 5.4.6.3
$ 80.00
Each
Crushed surfacing 1 1/4" minus
ESC-3
WSDOT 9-03.9(3)
$ 95.00
CY
4
1
380
Ditching
ESC-4
$ 9.00
CY
40
1
360
Excavation -bulk
ESC-5
$ 2.00
CY
60
1
120
Fence, silt
ESC-6
SWDM 5.4.3.1
$ 1.50
LF
470
1
705
Fence, Temporary (NGPE)
ESC-7
$ 1.50
LF
Hydroseeding
ESC-8
SWDM 5.4.2.4
$ 0.80
SY
Jute Mesh
ESC-9
SWDM 5.4.2.2
$ 3.50
SY
Mulch, by hand, straw, 3" deep
ESC-10
SWDM 5.4.2.1
$ 2.50
SY
Mulch, by machine, straw, 2" deep
ESC-11
SWDM 5.4.2.1
$ 2.00
SY
200
1
400
Piping, temporary, CPP, 6"
ESC-12
$ 12.00
LF
Piping, temporary, CPP, 8"
ESC-13
$ 14.00
LF
Piping, temporary, CPP, 12"
ESC-14
$ 18.00
LF
50
1
900
Plastic covering, 6mm thick, sandbagged
ESC-15
SWDM 5.4.2.3
$ 4.00
SY
200
1
800
Rip Rap, machine placed; slopes
ESC-16
WSDOT 9-13.1(2)
$ 45.00
CY
Rock Construction Entrance, 50'x15'x1'
ESC-17
SWDM 5.4.4.1
$ 1,800.00
Each
Rock Construction Entrance, 100'x15'x1'
ESC-18
SWDM 5.4.4.1
$ 3,200.00
Each
1
1
3200
Sediment pond riser assembly
ESC-19
SWDM 5.4.5.2
$ 2,200.00
Each
1
1
2200
Sediment trap, 5' high berm
ESC-20
SWDM 5.4.5.1
$ 19.00
LF
Sed. trap, 5' high, riprapped spillway berm section
ESC-21
SWDM 5.4.5.1
$ 70.00
LF
Seeding, by hand
Sodding, 1" deep, level ground
ESC-22
SWDM 5.4.2.4
$ 1.00
SY
ESC-23
SWDM 5.4.2.5
$ 8.00
SY
Sodding, 1" deep, sloped ground
ESC-24
SWDM 5.4.2.5
$ 10.00
SY
TESC Supervisor
ESC-25
$ 110.00
HR
20
1
2200
Water truck, dust control
ESC-26
SWDM 5.4.7
$ 140.00
HR
8
1
1120
WRITE -IN -ITEMS **** (see page 9)
Catch Basin Protection
$ 70.00
Each
9
1
630
Wattles
$ 4.00
LF
75
1
300
ESC SUBTOTAL:
30% CONTINGENCY & MOBILIZATION:
ESC TOTAL:
COLUMN:
Page 2 of 9
Nyland-BondQuant-BLD170899.xlsx
$ 13,315.00
$ 3,994.50
$ 17,309.50
A
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 3/30/2018
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right -of -Way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
GENERAL ITEMS
No.
Backfill & Compaction- embankment
GI - 1
$ 6.00
CY
Backfill & Compaction- trench
GI - 2
$ 9.00
CY
178
1,602.00
455
4,095.00
Clear/Remove Brush, by hand
GI - 3
$ 1.00
SY
Clearing/Grubbing/Tree Removal
GI - 4
$ 10,000.00
Acre
0.3
3,000.00
Excavation - bulk
GI - 5
$ 2.00
CY
4803
9,606.00
Excavation - Trench
GI - 6
$ 5.00
CY
178
890.00
455
2,275.00
Fencing, cedar, 6' high
GI - 7
$ 20.00
LF
145
2,900.00
Fencing, chain link, vinyl coated, 6' hi h
GI - 8
$ 20.00
LF
Fencing, chain link, gate, vinyl coated, 21
GI - 9
$ 1,400.00
Each
Fencing, split rail, 3' high
GI - 10
$ 15.00
LF
Fill & compact - common barrow
GI - 11
$ 25.00
CY
726
18,150.00
Fill & compact - gravel base
GI - 12
$ 27.00
CY
Fill & compact - screened topsoil
GI - 13
$ 39.00
CY
Gabion, 12" deep, stone filled mesh
GI - 14
$ 65.00
SY
Gabion, 18" deep, stone filled mesh
GI - 15
$ 90.00
SY
Gabion, 36" deep, stone filled mesh
GI - 16
$ 150.00
SY
Grading, fine, by hand
GI - 17
$ 2.50
SY
Grading, fine, with grader
GI - 18
$ 2.00
SY
0.67
1.34
Monuments, 3' long
GI - 19
$ 250.00
Each
Sensitive Areas Sin
GI - 20
$ 7.00
Each
Sodding, 1" deep, sloped ground
GI - 21
$ 8.00
SY
Surveying, line & grade
GI - 22
$ 850.00
Day
6
5,100.00
Surveying, lot location/lines
GI - 23
$ 1,800.00
Acre
2
3,600.00
Traffic control crew ( 2 flaggers)
GI - 24
$ 120.00
HR
80
9,600.00
Trail, 4" chipped wood
GI - 25
$ 8.00
SY
Trail, 4" crushed cinder
GI - 26
$ 9.00
SY
Trail. 4" top course
GI - 27
$ 12.00
SY
Wall, retaining, concrete
GI - 28
$ 55.00
SF
1208
66,440.00
Wall, rockery
GI - 29
$ 15.00
SF
2101
3,150.00
Page 3 of 9
SUBTOTAL
12, 092.00
118,317.34
Unit prices updated: 03/02/2015
"KCC 27A authorizes only one bond reduction. Version: 03/02/2015
Nyland-BondQuant-BLD170899.xlsx Report Date: 3/30/2018
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant. Cost
ROADIMPROVEMENT
No.
AC Grinding, 4' wide machine < 1000s
RI - 1
$ 30.00
SY
375
11,250.00
AC Grinding, 4' wide machine 1000-2000
RI - 2
$ 16.00
SY
AC Grinding, 4' wide machine > 2000s
RI - 3
$ 10.00
SY
AC Removal/Disposal
RI - 4
$ 35.00
SY
359
12,565.00
468
16,380.00
Barricade, Noe III ( Permanent)
RI - 6
$ 56.00
LF
Curb & Gutter, rolled
RI - 7
$ 17.00
LF
Curb & Gutter, vertical
RI - 8
$ 12.50
LF
70
875.00
Curb and Gutter, demolition and disposal
RI - 9
$ 18.00
LF
70
1,260.00
Curb, extruded asphalt
RI - 10
$ 5.50
LF
Curb, extruded concrete
RI - 11
$ 7.00
LF
740
5.180.00
Sawcut, asphalt, 3" depth
RI - 12
$ 1.85
LF
355
656.75
Sawcut, concrete, per 1" depth
RI - 13
$ 3.00
LF
160
480.00
Sealant, asphalt
RI - 14
$ 2.00
LF
355
710.00
Shoulder. AC. see AC road unit price)
RI - 15
$ -
SY
Shoulder, gravel, 4" thick
RI - 16
$ 15.00
SY
Sidewalk, 4" thick
RI - 17
$ 38.00
SY
452
17,176.00
Sidewalk, 4" thick, demolition and dis os
RI - 18
$ 32.00
SY
Sidewalk. 5" thick
RI - 19
$ 41.00
SY
70
2.870.00
59
2.419.00
Sidewalk, 5" thick, demolition and dispos
RI - 20
$ 40.00
SY
70
2,800.00
Sign, handicap
RI - 21
$ 85.00
Each
Striping, per stall
RI - 22
$ 7.00
Each
30
210.00
Striping. thermoplastic. ( for crosswalk)
RI - 23
$ 3.00
SF
Striping, 4" reflectorized line
RI - 24
$ 0.50
LF
356
178.00
Page 4 of 9
SUBTOTAL
33,644.75
41, 365.00
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
Nyland-BondQuant-BLD170899.xlsx Report Date: 3/30/2018
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
8, Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant. Cost
ROAD SURFACING
No.
4" Rock = 2.5 base & 1.5" top course 9 1/2" Rock= 8" base & 1.5" top course)
Additional 2.5" Crushed Surfacing
RS - 1
$ 3.60
SY
HMA 1/2" Overlay, 1.5"
RS - 2
$ 14.00
SY
HMA 1/2" Overlay 2"
RS - 3
$ 18.00
SY
750
13,500.00
HMA Road, 2", 4" rock, First 2500 SY
RS - 4
$ 28.00
SY
HMA Road. 2". 4" rock. Qtv. over 2500 S
RS - 5
$ 21.00
SY
HMA Road. 3". 9 1/2" Rock. First 2500 S
RS-6
$ 42.00
SY
375
15,750.00
HMA Road, 3", 9 112" Rock, Qty Over 25
RS - 7
$ 35.00
SY
Not Used
RS - 8
Not Used
RS - 9
HMA Road, 6" Depth, First 2500 SY
RS - 10
$ 33.10
SY
HMA Road, 6" Depth, City. Over 2500 S
RS - 11
$ 30.00
SY
HMA 3/4" or 1", 4" Depth
RS - 12
$ 20.00
SY
Gravel Road. 4" rock. First 2500 SY
RS - 13
$ 15.00
SY
Gravel Road. 4" rock, Qty. over 2500 SY
RS - 14
$ 10.00
SY
PCC Road (Add Under Write -Ins w/Desk
RS - 15
Thickened Edge IRS
- 17
$ 8.60
LF
Page 5 of 9
SUBTOTAL
29.250.00
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction Version: 03/02/2015
Nyland-BondQuant-BLD170899.xlsx Report Date: 3/30/2018
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. I Cost
Quant. Cost
DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent) For Culvert rices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.
Access Road. R/D
D - 1
1 $ 21.001
SY
Bollards -fixed
D - 2
$ 240.74
Each
Bollards - removable
D - 3
$ 452.34
Each
* (CBs include frame and lid
CB Type l
D- 4
$ 1.500.00
Each
1
1,500.00
5
7,500.00
CB Type IL
D - 5
$ 1.750.00
Each
CB Type 11, 48" diameter
D - 6
$ 2,300.00
Each
1
2,300.00
for additional depth over 4'
D - 7
$ 480.00
FT
4
1,920.00
CB Type II. 54" diameter
D - 8
$ 2.500.00
Each
41
10,000.00
for additional depth over 4'
D - 9
$ 495.00
FT
18.8
9.306.00
CB Type 11, 60" diameter
D - 10
$ 2,800.00
Each
for additional depth over 4'
11
$ 600.00
FT
--D-
CB Type II. 72" diameter
D - 12
$ 3.600.00
Each
for additional depth over 4'
D - 13
$ 850.00
FT
Through -curb Inlet Framework (Add)
D - 14
$ 400.00
Each
Cleanout, PVC, 4"
D - 15
$ 150.00
Each
31
4,650.00
Cleanout. PVC. 6"
D - 16
$ 170.00
Each
7
1,190.00
Cleanout, PVC, 8"
D - 17
$ 200.00
Each
Culvert, PVC, 4"
D - 18
$ 10.00
LF
970
9,700.00
Culvert. PVC, 6"
D - 19
$ 13.00
LF
147
1,911.00
Culvert. PVC or CPE 8"
D - 20
$ 15.00
LF
133
1,995.00
Culvert, PVC, 12"
D - 21
$ 23.00
LF
323
7,429.00
Slotted, PVC, 6"
D - 22
$ 25.00
LF
76
1.900.00
Culvert. CMP. 12"
D - 23
$ 29.00
LF
Culvert. CMP. 15"
D - 24
$ 35.00
LF
Culvert, CMP, 18"
D - 25
$ 41.00
LF
Culvert, CMP, 24"
D - 26
$ 56.00
LF
Culvert. CMP, 30"
D - 27
$ 78.00
LF
Culvert, CMP, 36"
D - 28
$ 130.00
LF
Culvert, CMP, 48"
D - 29
$ 190.00
LF
Culvert. CMP, 60"
D - 30
$ 270.00
LF
Culvert, CMP, 72"
D - 31
$ 350.00
LF
Page 6 of 9
SUBTOTAL
1,50000
59,801.00
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
Nyland-BondQuant-BLD170899.xlsx Report Date: 3/30/2018
Site Improvement Bond Quantity Worksheet
Web date: 04103/2015
DRAINAGE CONTINUED
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
No.
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
Culvert, Ductile, 8"
D - 32
$ 25.00
LF
49
1225
Culvert, Concrete, 12"
D - 33
$ 36.00
LF
Culvert, Concrete, 15"
D - 34
$ 42.00
LF
Culvert. Concrete. 18"
D - 35
$ 48.00
LF
Culvert, Concrete, 24"
D - 36
$ 78.00
LF
Culvert, Concrete, 30"
D - 37
$ 125.00
LF
Culvert, Concrete, 36"
D - 38
$ 150.00
LF
Culvert, Concrete. 42"
D - 39
$ 175.00
LF
Culvert, Concrete, 48"
D - 40
$ 20500
LF
Culvert, CPP, 6"
D - 41
$ 14.00
LF
Culvert. CPP, 8"
D - 42
$ 16.00
LF
Culvert. CPP, 12"
D - 43
$ 2400
LF
Culvert, CPP, 15"
D - 44
$ 35.00
LF
Culvert, CPP, 18"
D - 45
$ 41.00
LF
Culvert, CPP, 24"
D - 46
$ 56.00
LF
Culvert, CPP, 30"
D - 47
$ 78.00
LF
Culvert, CPP, 36"
D - 48
$ 130.00
LF
Ditching
D - 49
$ 9.50
CY
Flow Dispersal Trench (1,436 base+)
D - 50
$ 28.00
LF
French Drain (3' depth)
D - 51
$ 26.00
LF
Geotextile, laid in trench, polypropylene
D - 52
$ 3.00
SY
Mid -tank Access Riser, 48" dia, 6' deep
D - 54
$ 2,000.00
Each
Pond Overflow Spillway
D - 55
$ 16.00
SY
Restrictor/Oil Separator, 12"
D - 56
$ 1,150.00
Each
Restrictor/Oil Separator, 15"
D - 57
$ 1,350.00
Each
Restrictor/Oil Separator, 18"
D - 58
$ 1,700.00
Each
Riprap. placed
D - 59
$ 42.00
CY
Tank End Reducer (36" diameter)
D - 60
$ 1.200.00
Each
Trash Rack, 12"
D - 61
$ 350.00
Each
Trash Rack, 15"
D - 62
$ 410.00
Each
Trash Rack. 18"
D - 63
$ 480.00
Each
Trash Rack, 21"
D - 64
$ 550.00
Each
Page 7 of 9
SUBTOTAL
1225
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
Nyland-BondQuant-BLD170899.xisx Report Date: 3/30/2018
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Price
Quant. I Cost
Quant. Cost
PARKING LOT SURFACING Not To Be Used For Roads Or Shoulders
No.
2" AC, 2" top course rock & 4" borrow
PL - 1
$ 21.00
SY
NA
NA
1558
32718
2" AC, 1.5" top course & 2.5" base cour
PL - 2
$ 28.00
SY
NA
NA
4" select borrow
PL - 3
$ 5.00
SY
NA
NA
1.5" top course rock & 2.5" base course
PL - 4
$ 14.00
SY
NA
NA
UTILITY POLES & STREET LIGHTING Utility le relocation costs must be accompanied b Franchise Utility's Cost Estimat
Utilitv Pole(s) Relocation
5P-1
Lump Sum
Street Light Poles w/Luminaires
UP-2
1 $ 7,500.00 Each
WRITE -IN -ITEMS
(Such as detention/water quality vaults.)
No.
Stormwater tank (54" dia)
WI - 1
$ 35,000.00
Each
1
35,000.00
Block Wall
WI - 2
$ 16.00
SY
Yard Drain
WI - 3
$ 240.00
Each
7
1,680.00
WI-4
LF
WI-5
FT
WI-6
WI-7
WI-8
WI-9
WI-10
SUBTOTAL
SUBTOTAL (SUM ALL PAGES):
30% CONTINGENCY & MOBILIZATION:
GRANDTOTAL:
COLUMN:
Page 8 of 9
76,486.75
22,946.03
99,432.78
B
� _ 1
290,106.34
87.031.90
377,138.24
C D
*KCC 27A authorizes only one bond reduction.
Nyland- Bond Quant-BLD170899.x1sx
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 3/30/2018
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Original bond computations prepared by:
Name: Pedro DeGuzman, PE Date: 3/30/2018
PE Registration Number: 35646 Tel. #: 206-923-0590
Firm Name: Terraforma Design Group, Inc.
Address: 5027 51st Avenue SW, Seattle, WA 98136 Project No: BLD20170899/0900
Stabilization/Erosion Sediment Control (ESC)
Existing Right -of -Way Improvements
Future Public Right of Way & Drainage Facilities
Private Improvements
Calculated Quantity Completed
Total Right -of Way and/or Site Restoration Bond*/**
(First 7,500 of bond* shall be cash.
Performance Bond* Amount (A+B+C+D) = TOTAL
Maintenance/Defect Bond* Total
NAME OF PERSON PREPARING BOND* REDUCTION:
(A)
(B)
(C)
(D)
FINANCIAL GUARANTEE REQUIREMENTS
PERFORMANCE BOND* MINIMUM BOND* AMOUNT PUBLIC ROAD & DRAINAGE
AMOUNT REQUIRED FOR RECORDING OR MAINTENANCE/DEFECT BOND*
TEMPORARY OCCUPANCY AT
$ 17,309.5 SUBSTANTIAL COMPLETION ***
$ 99,432.8
$ 377,138.2
(A+B) $ 116,742.3
(T) $ 493.880.5
Minimum is $2000.
T x 0.30 $ 148,164.2
Minimum is $200
Date:
(B+C) x
0.25 = $ 248.2
Minimum is $2000.
* NOTE: The word "bond" as used in this document means a financial guarantee acceptable to King County.
** NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required.
The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to be included.
Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration
needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity.
*** NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes.
REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY KING COUNTY
Page 9 of 9 Unit prices updated: 03/02/2015
Check out the DDES Web site at www.kingcounty.poy/permits Version: 03/02/2015
Nyland-BondQuant-BLD170899.xlsx Report Date: 3/30/2018