Building PermitType: COMMERCIAL BLDG Subtype: COM ALTERATION OR REPAIR I Status: ISSUED
Parcel No: 00659700010200 Site Address: 535 WALNUT ST 102 EDMONDS,WA 98020-3465
Subdivision: 008969, 007819, 006597, 004342 Lot: 0
Fire Sprinklers: Lot Area: Zoning:
Valuation: $114,496.00 Occupancy Type: Construction Type:
Code Edition: 2018 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: PURO- CONDO KITCHEN REMODEL M INCL P SEP.
Applied: 2/7/2022
Issued: 3/3/2022
Final:
Expiration Date: 2/26/2023
Issued by: NED
I WA State Contractor L & I #: COBALCL851BN I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
KEN PURO
535 WALNUT STREET 102,
(206)351-8234
KENPURO@GMAIL.COM
EDMONDS WA 98020
CONTACT
KEN PURO
535 WALNUT STREET 102,
(206)351-8234
kenpuro@gmail.com
EDMONDS WA 98020
CONTRACTOR
COBALT CONSTRUCTION LLC
4000 AURORA AVE N, SEATTLE
(206)683-6382
WA 98103
OWNER
EMMA LOU & KEN
PURO
535 WALNUT ST 102, EDMONDS
(206)351-8234
WA 98020
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
1 -BASE FEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
3/3/22
R18397
PERMITS
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
2/8/22
R18016
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$25.00
3/3/22
R18397
MISC MECHANICAL EQUIPMENT
001.000.322.10.000.00
$30.00
$30.00
3/3/22
R18397
FOR WHICH NO FEE IS INDICATED
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00
$1,408.00
$1,408.00
3/3/22
R18397
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00
$1,196.80
$1,196.80
2/8/22
R18016
TOTALS: $2,749.80
$2,749.80
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Thursday, March 03, 2022 11:31:38 AM 1 of 2
'-
!!!7
of Edmonds PERMIT NU
EdmondsCity
98020 1 1
-W www . •. • •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
CARBON MONOXIDE SYSTEMS
FOR
CARBON MONOXIDE SYSTEMS
NFORMATION
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
provide manufactures installation instructions on site for Building Inspector.
' •
4R
•
• •- •
C • •'- •
COMPLETED
SEQID
INSPECTION TYPE
INSPECTOR
DATE
B-4 DRYWALL FASTENING
B-4 FIRESTOPPING
B-4 FRAMING
B-5 INSULATION ENERGY
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
B-3 MECH ROUGH IN
Printed: Thursday, March 03, 2022 11:31:38 AM 2 of 2