Loading...
Building PermitType: COMMERCIAL BLDG Subtype: COM ALTERATION OR REPAIR I Status: ISSUED Parcel No: 00659700010200 Site Address: 535 WALNUT ST 102 EDMONDS,WA 98020-3465 Subdivision: 008969, 007819, 006597, 004342 Lot: 0 Fire Sprinklers: Lot Area: Zoning: Valuation: $114,496.00 Occupancy Type: Construction Type: Code Edition: 2018 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: PURO- CONDO KITCHEN REMODEL M INCL P SEP. Applied: 2/7/2022 Issued: 3/3/2022 Final: Expiration Date: 2/26/2023 Issued by: NED I WA State Contractor L & I #: COBALCL851BN I CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT KEN PURO 535 WALNUT STREET 102, (206)351-8234 KENPURO@GMAIL.COM EDMONDS WA 98020 CONTACT KEN PURO 535 WALNUT STREET 102, (206)351-8234 kenpuro@gmail.com EDMONDS WA 98020 CONTRACTOR COBALT CONSTRUCTION LLC 4000 AURORA AVE N, SEATTLE (206)683-6382 WA 98103 OWNER EMMA LOU & KEN PURO 535 WALNUT ST 102, EDMONDS (206)351-8234 WA 98020 DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 -BASE FEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 3/3/22 R18397 PERMITS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 2/8/22 R18016 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 3/3/22 R18397 MISC MECHANICAL EQUIPMENT 001.000.322.10.000.00 $30.00 $30.00 3/3/22 R18397 FOR WHICH NO FEE IS INDICATED PERMIT FEE - COMMERCIAL 001.000.322.10.000.00 $1,408.00 $1,408.00 3/3/22 R18397 PLAN REVIEW FEE - COMMERCIAL 001.000.345.83.000.00 $1,196.80 $1,196.80 2/8/22 R18016 TOTALS: $2,749.80 $2,749.80 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Thursday, March 03, 2022 11:31:38 AM 1 of 2 '- !!!7 of Edmonds PERMIT NU EdmondsCity 98020 1 1 -W www . •. • • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. CARBON MONOXIDE SYSTEMS FOR CARBON MONOXIDE SYSTEMS NFORMATION ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION provide manufactures installation instructions on site for Building Inspector. ' • 4R • • •- • C • •'- • COMPLETED SEQID INSPECTION TYPE INSPECTOR DATE B-4 DRYWALL FASTENING B-4 FIRESTOPPING B-4 FRAMING B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" B-3 MECH ROUGH IN Printed: Thursday, March 03, 2022 11:31:38 AM 2 of 2