Loading...
Building Permit•M MERCIAL BLDG PermitCity PERMITNUM • • • • 1[798020 1 1 1 1 -. www..v •. / 425.771.0220 �� Type: COMMERCIAL BLDG Owner/ Business: KISAN ENTERPRISE LLC Status: ISSUED Subtype: TOWNHOMES 3 OR MORE Site Address: 22812 EDMONDS WAY BLDG B EDMONDS,WA Parcel No: 27033600102300 Applied: 2/4/2020 98020-5042 Subdivision: Lot: 0 Issued: 6/11/2021 Fire Sprinklers: Yes Lot Area: Zoning: RM-1.5 Final: Valuation: $738,776.89 Occupancy Type: R3 Construction Type: VB Expiration Date: 6/6/2022 Code Edition: 2015 No. Stories: 2 # of Dwelling Units: 4 Issued by: JOK Scope of Work: KISAN- BLDG B- 4 UNIT TOWNHOME WA State Contractor L & I #: AILANC1056DP City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT REGENT CONSTRUCTION INC ROB MICHEL, EDMONDS WA (206)930-2445 rwmichell@me.com 98026 CONTRACTOR A-1 LANDSCAPING AND 20607 SR 9 SE, SNOHOMISH WA (425)402-9900 NAEEM@AILAND.COM CONSTRUCTION INC 98296 OWNER KISAN ENTERPRISE LLC 20607 SR 9 SE, SNOHOMISH WA (425)402-9900 NAEEM@AILAND.COM 98296-8316 DESCRIPTION 7BUILDING ACCOUNT AMOUNT PAID PAID DATE RECEIPT # ADDITIONAL REVIEW 001.000.345.83.000.00 $220.00 $220.00 6/11/21 R12779 OURS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 6/11/21 R12779 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 6/11/21 R12779 ENGINEERING INSPECTION FEE 001.000.341.82.000.00 $330.00 $330.00 6/11/21 R12779 INDEPENDENT TRAFFIC IMPACT FEE 112.502.345.86.000.00 $13,725.95 $13,725.95 6/11/21 R12779 PARK IMPACT FEE - COM ADMIN 001.000.322.10.000.00 $100.00 $100.00 6/11/21 R12779 PARK IMPACT FEE - MULTI FAMILY 332.100.345.85.000.00 $9,360.64 $9,360.64 6/11/21 R12779 PERMIT FEE - COMMERCIAL 001.000.322.10.000.00 $5,614.00 $5,614.00 6/11/21 R12779 PLAN REVIEW FEE - COMMERCIAL 001.000.345.83.000.00 $4,771.90 $4,771.90 2/4/20 R2873 STATE BUILDING CODE SURCHARGE 001.000.237.150 $6.00 $6.00 6/11/21 R12779 EACH ADDL DWELLING UNITS STORMWATER GENERAL FACILITY 422 000.379.00.000.00 $1,575.23 $1,575.23 6/11/21 R12779 CHARGE MF COMM TRANSPORTATION IMPACT ADMIN 001.000.341.82.000.00 $100.00 $100.00 6/11/21 R12779 FEE - MF COMM TOTALS: $35,868.72 $35,868.72 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Friday, June 11, 2021 11:36:58 AM 1 of 4 •MMERCIAL BLDG Permit PERMIT NU City of Edmonds . ••0i 1 1 31151 ww.edmondswa.gov 48 HRS NOTICE-ENGR FINAL FOR 48 Working hours notice is required when requesting your FINAL engineering inspection. NFORMATION 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. FOR CARBON MONOXIDE SYSTEMS CARBON MONOXIDE SYSTEMS NFORMATION It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ELECTRICAL PERMIT O Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. ORMATION FOR Maintain erosion and sedimentation control per City and SWMMW standard ESC REQ INFORMATION requirements. FIRE FINAL INSPECTION FOR Request final Fire Department Inspection 425-775-7720. NFORMATION Approval of this foundation design is conditional subject to inspection of existing site soil FOR conditions. Retaining walls must be designed and constructed to resist the lateral FOUNDATION BEARING INFORMATION pressure of the retained material. Provisions must be made for the control and drainage of surface water around buildings. GAS PIPE TEST FOR Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted NFORMATION Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. HOSE BIBBS FOR Hose Bibbs are required to have a permanently affixed anti -siphon device installed. NFORMATION INSP PRIOR TO BACKFILL FOR Call for all required inspections. All work shall be inspected prior to backfill. NFORMATION Printed: Friday, June 11, 2021 11:36:58 AM 2 of 4 •MMERCIAL BLDG Permit PERMIT NU of Edmonds EdmondsCity 98020D2020-0151 ww.edmondswa.gov• Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish the datum point and the point of average grade. Call for inspections to verify. These MAXIMUM HEIGHT FOR items must be consistent with the approved plan. If the proposed height of a building is INFORMATION within 12 inches of the maximum height permitted for the zone an elevation survey is required. FOR This property falls within the Olympic View Water and Sewer District. A permit from OVWSD SEWER SERVICE INFORMATION Olympic View is required for the sanitary sewer installation. OVWSD WATER LINE/METER FOR This property falls within the Olympic View Water and Sewer District. Contact Olympic INFORMATION View for specific water line and/or water meter information. FOR Electronic civil asbuilt shall be submitted to the City prior to final project acceptance. PROJECT CIVIL ASBUILT INFORMATION Asbuilt shall be submitted to Engineeringpermits@edmondswa.gov. The building enclosure must be inspected by a qualified inspector in accordance with RCW 64.55.030, 64.55.040, and 64.55.050. A building enclosure certification letter from the inspector must be submitted to the Building Division prior to final inspection by the RCW 64.55 BUILDING FOR City Building Inspector in accordance with RCW 64.55.060. Where phasing of construction ENCLOSURE INFORMATION occurs, coordinate inspection with the City Building Inspector to ensure that all required inspections are performed. Inspection by the building enclosure inspector to meet RCW 64.55 does not substitute for required City building inspections which must be performed by the City Building Inspector. REQUIRED SPECIAL FOR INSPECTIONS INFORMATION Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND OR NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. FOR All new, extended, rebuilt, or relocated electrical utility and/or service shall be placed UNDERGROUND WIRING INFORMATION underground. FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. Installer shall provide the manufacturer installation, operating instructions, and a whole WHOLE HOUSE FAN FOR house ventilation system operation description. A label shall be affixed to the whole INFORMATION house timer control that reads "Whole house ventilation, see operating instructions". INSPECTIONS - Schedule Online at: https://Inspection.MvBuildingPermit.com COMPLETED SEQID INSPECTION TYPE INSPECTOR RESULT NOTES DATE A-1 ENGINEERING PRECON A-1 TESC AND MOBILIZE E-3 STRM FOOTING DRAIN E-3 STRM TIGHTLINE E-4 WATER SERVICE LINE X-0 OVWSD APPROVAL X-2 ENGINEERING FINAL B-1 SETBACKS Printed: Friday, June 11, 2021 11:36:58 AM 3 of 4 Permit City •EdmondsPERMIT- - NUM •:� i 1 1 1 . •. 1.0220 11177 IE7 B-2 FOOTINGS B-2 FOUNDATION WALL B-3 EXT GYP SHEATHING B-3 EXT WALL SHEATHING B-3 GAS PIPING TEST B-3 PLUMB ROUGH IN B-3 ROOF SHEATHING B-3 UNDERFLR FRAMING B-3 WATER SERVICE LINE B-4 DRYWALL FASTENING B-4 FRAMING B-4 HEIGHT VERIFICATION B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" A-1 BUILDING PRECON Printed: Friday, June 11, 2021 11:36:58 AM 4 of 4