Loading...
engineer review of postsRoss Z C2,0, ©glo 5- 2.7.2022 Engineering Design February 7, 2022 Tom Leren The Leren Company Inc PO Box 12863 Mill Creek, WA 98082 RE: Helleren Residence Edmonds, WA Dear Tom: As requested, I have reviewed the gable wall at Grid 12 to substitute the two P-12 posts for (2) full height DF studs plus (2) trimmers each. This substitution is structurally acceptable. Feel free to contact me with any further questions. V Ryan Ross, PE Ross Engineering Design Phone: (425) 314-2373 Email: rvan.rossProssengineer.com