Loading...
Building Permit 2021Type: RESIDENTIAL BLDG Subtype: ALTERATION OR REMODEL I Status: ISSUED Parcel No: 00450300001100 Subdivision: 004503, 004499 Fire Sprinklers: Valuation: $65,000.00 Code Edition: 2018 Site Address: 9712 242ND PL SW EDMONDS,WA 98020-6515 Lot: 0 Lot Area: Occupancy Type: No. Stories: 0 Scope of Work: BRUBAKER -FOUNDATION REPAIR Zoning: Construction Type: # of Dwelling Units: 0 WA State Contractor L & I #: Applied: 12/8/2021 Issued:2/16/2022 Final: Expiration Date: 2/16/2023 Issued by: BAC CONTACTS A NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT BRIANNA BLIVEN 250 4TH AVE S SUITE 200, (425)778-8500 BRIANNAB@CGENGINEERING.COM EDMONDS WA 98020 CONTACT CG ENGINEERING 250 4TH AVE S SUITE 200, (425)778-8500 morgank@cgengineering.com EDMONDS WA 98020 CONTRACTOR CONTRACTOR UNKNOWN 9712 242ND PL SW, EDMONDS OWNER TERIANNE BRUBAKER 509.385.5292 WA 98020 INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 12/28/21 R16828 PER PERMIT PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $855.00 $855.00 2/7/22 R17994 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $726.75 $726.75 12/28/21 R16828 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 2/7/22 R17994 TOTALS: $1,628.25 $1,628.25 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Wednesday, February 16, 2022 9:44:32 AM 1 of 2 'RESIDENTIAL BLDG Permit C-A - �1. I City • • • • •:� i 1 .. . •. • Ah 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. REQUIRED SPECIAL FOR Special Inspections required for Pin Pile Installation and Retro fit anchorage. INSPECTIONS INFORMATION COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR DATE B-5 BLDG SPECIAL INSPECTION B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" B-2 FOOTINGS Printed: Wednesday, February 16, 2022 9:44:32 AM 2 of 2