Loading...
1572_001DAVID EVANS AND ASSOCIATES INC. DATE: April 27, 2021 TO: Wayne Malmberg Windstar Construction Co. Q 27 NW 196th PL Shoreline Wa 98177 Z FROM: Doug Vogt �a SUBJECT: Building Height Certification - 1001 Olympic Ave PROJECT: WSTR00000001 O1001 Olympic Ave - Building Height Cert CC: D. Vogt WWayne, here are the results of the building height verification survey: Date of Survey: April 26, 2021 Field Staff: Luke Cleaver QC Review By: Doug Vogt Per client provided plans by Architects Northwest titled "Parmenter Homes,1001 Olympic Avenue Edmonds Wa, Plan M3685A3S-0" bearing a revision date of 2/28/19. Plan sheet AO/A9 displays two benchmarks, a catch basin with a rim elevation of 162.81 feet, and a fire hydrant base with an elevation of 164.25 feet. Utilizing these benchmarks as the basis of elevations, the highest visible roof ridgeline was observed to be 178.08 feet. See Attachment A for a graphic representation of the surveyed area. I hereby certify these results to correctly represent actual site conditions on April 26, 2021. Douglas Vogt, PLS AEI�1 15:2021.04.27 06:06-07'00' David Evans and Associates, Inc. 2021.04.27 15:05:32-07'00' Attachments/Enclosures: Attachment A - Building Diagram File Path: P:\W\WS-rR00000001\030000M\Bldg Height Cert\2021-04-27 Building Height Certification (dev).docx 14432 SE Eastgate Way Suite 400 Bellevue Washington 98007 Telephone: 425.519.6500 Facsimile: 425.519.5361