Loading...
Building PermitType: COMMERCIAL BLDG Subtype: COM ALTERATION OR REPAIR I Status: ISSUED Parcel No: 27033600403800 Site Address: 9501 244TH ST SW EDMONDS,WA 98020-7513 Subdivision: SP 390 (11-80), BLA AFN 200207175005, 010747, 004468, 004503, Lot: 0 004499, SP 230 (5-78), SP S-98-195 Fire Sprinklers: Lot Area: Zoning: Valuation: $19,000.00 Occupancy Type: Construction Type: Code Edition: 2018 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: BRACKETT APTS-EXTERIOR REPAIRS TO DECKING, RAILING, SOFFIT WA State Contractor L & I #: BIBBCCL917PK Applied: 2/11/2022 Issued:3/17/2022 Final: Expiration Date: 3/17/2023 Issued by: BAC CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL 1420 SOUTH 2O7TH ST, SEATAC BIBBCONSTRUCTIONLLC@GMAIL.CO APPLICANT BILL BAKER (253)508-9520 WA 98198 M BIBB CONSTRUCTION LLC 1420 SOUTH 2O7TH ST, SEATAC CONTACT (253)508-9520 bibbconstructionllc@gmail.com 2009 WA 98198 CONTRACTOR BIBB CONSTRUCTION LLC 1420 SOUTH 2O7TH ST, SEATAC (253)508-9520 bibbconstructionllc@gmail.com 2009 WA 98198 OWNER BRACKETT APTS-BILL US REIF 1420 SOUTH 2O7TH ST 400, (253)508-9520 FIRDALE VILLAGE W SEATAC WA 98198 FEE INFORMATION DESCRIPTION ACCOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 2/15/22 R18120 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 3/17/22 R18739 PERMIT FEE - COMMERCIAL 001.000.322.10.000.00 $475.60 $475.60 3/17/22 R18739 PLAN REVIEW FEE - COMMERCIAL 001.000.345.83.000.00 $404.26 $404.26 2/15/22 R18120 TOTALS: $944.86 $944.86 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Thursday, March 17, 2022 10:07:40 AM 1 of 2 •MERCIAL BLDG Permit - City of •:• i 1 1 :: . •. • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. FOR Maintain erosion and sedimentation control per City and SWMMW standard ESC REQ INFORMATION requirements. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION provide manufactures installation instructions on site for Building Inspector. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. INSPECTIONS-. •nline at: https://Inspection.MvBuildingPermit.co COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE B-3 EXT GYP SHEATHING B-4 FRAMING X-3 BUILDING FINAL" X-1 FIRE FINAL Printed: Thursday, March 17, 2022 10:07:40 AM 2 of 2