Loading...
ENG2022-0048 ROW PERMITRIGHT OF WAY EUC PERMIT PERMIT NUMBER City of Edmonds -0048 www.cityofedmonds.gov• • Description: PUD-REPLACE BAD POWER WIRE IN EXISTING CONDUIT ISSUED: 03/17/2022 Address: 8421 MAIN ST 306 EDMONDS WA 98026-6920 EXPIRES: 09/17/2022 rmit Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 00647400330600 i NAME TYPE NAME ADDRESS PHONE APPLICANT MOE NAVE PO BOX 1107, EVERETT WA 98206 (425)783-5681 CONTACT SNOHOMISH COUNTY PUD P.O. BOX 1107, EVERETT WA 98206 (425)670-3216 CONTRACTOR SNOHOMISH COUNTY PUD P.O. BOX 1107, EVERETT WA 98206 (425)670-3216 OWNER SARAH N & KROWKA ALEX PILLI 8421 MAIN ST 306, EDMONDS WA 98026 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 RIGHT OF WAY MINOR - EUC PERMIT FEE $110.00 $110.00 1111 • REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW 03/17/2022 RELEASED BY DATE Printed: Thursday, March 17, 2022 11:59:32 AM 1 of 2 -KRWOF WAY EUC PERMIT City of • • • •:• •ENG2022-0048 www.cityofedmonds. ov/425.771.0220 CONDITIONS CONDITION TYPE ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. ESC REQ Maintain erosion and sedimentation control per City and SWMMW standard requirements. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND OR NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. TRAFFIC CONTROLS TRAFFIC CONTROL PER APPROVED PLAN MUTCD. ALL FLAGGERS SHALL BE CERTIFIED. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTION TYPE 7JOB DATE RESULT NOTES COMPLETE A-1 START X-2 ENGINEERING FINAL" E-7 TRAFFIC CTRL Printed: Thursday, March 17, 2022 11:59:32 AM 2 of 2 Of EPtito41 RECEIVED RIGHT OF WAY CONSTRUCTION FEB 08 2022 PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal CITY OF EDMONDS DEVELOPMENT ANC. B90 Requirements outlined in Right -of -Way permit Handout E6:I. SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. SECTION A order cable WO 100038421 General • / Project Nameg.D%CRR hA Q/dw cc.ro Y / /l J 9'-f"rV-/'tA Cf/1(/D wl Site Address or if no site address use Property Address at NW corner of project area: 51/ 0 Associated Permits: BLD PLN ENG Owner and Entity Holding Franchise (if applicable) Name of Company 94. Franchise Ordinance No: N/A Point of Contact Title SAME AS BELOW. Address City State Zip Phone Email Contractor and Authorized Agent of •wner /1 Name of Company khIMIS4 (see note • •w) AU,0, Contractor ContactsDuring Construction Primary Name `yam Agent Name c Title Title �'� Mobile Address .Lv PO Box 1107 Email City State W I� Zip [ �-w t Secondary Name Phone .2 _ Z o (98206) Title Email asrife@snopud.com &jointuse@snopud.com Mobile City of Edmonds Business License No: Email State License No: 313-005-741 x Contractor verifies it is urgently bonded] Contractor verifies it currently has genera] liability insurance NOTE: ECDC18.6o.020 requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. Type of Development apply ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as well) ❑ Traffic Control Only (no associated development) (Utility Franchise Work (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 DescriptionProject Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF x LF SF 72 hours + LF x LF SF -Alley -Parking 72 hours + LF x LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications ❑ cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm Details of Work to be Completed i. Does the utility owner have existing overhead infrastructure in the area of work? Yes No 2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)? If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility stem? 5. Does the work involve proposed additions to an aboveground utility system? If es: Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? 11 Details 6. of Workto be Completed Does your project involve rebuilding or replacing utility equipment which currently serves more Yes No than one lot or commercial development? If yes, answer the following questions related to project area, i.e. the actual area in which the ro'ect is proposed: 6a. Does your project involve wires/cables/lines? If yes: How many are existing? How many are to be added? $ City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 6b. Does your project involve poles? If yes: How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: How many? What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: APPLICANT PRINTED NAME: APPLICANT TITLE: NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 LAYOUT LEGEND: UODdSNITly T1UBe3MERSIBLETRANS R QJ ABOVE GROUND J-BOX ❑J SUBMERSIBLE J-BOX I] SECONDARY VAULT ❑ PULLING VAULT 0 SWITCH CABINET - © SMALL SECONDARY PEDESTAL © LARGE SECONDARY PEDESTAL PRIMARY UNDERGROUND CABLE -•-•-•-•--- *350 SECONDARY UNDERGROUND CABLE - - - - - - - - 4/0 SECONDARY UNDERGROUND CABLE ........................• 1/0 SECONDARY UNDERGROUND CABLE -1-1-1-1-1-STREET LIGHT CABLE SERVICE CONDUIT o POLE AND OVERHEAD LINE - - -PROPERTY LINE - -RIGHT-OF-WAY LINE U EXISTING UNDERGROUND CABLE EXISTING DUCT - - - - FUTURE DUCT ------- S------ SANITARY SEWER/MANHOLE .------- D------ STORM DRAIN/CATCH BASIN ------- W----- -0WATER MAIN/METER Y FIRE HYDRANT - @) STREET LIGHT * UNDERGROUND LOCATOR MARKER SCHEMATIC: REFER TO SHEET S1 VAULT INSPECTION FORMS: REFER TO SHEET 4 GENERAL NOTES: TREE TRIMMING ANO/OR BRUSH REMOVAL IS REQUIRED BEFORE PERFORMING WORK AT VAULTS A-2800, A-2801 AND A-10445. CABLE NOTES: FROM TAKE OFF POLE TO A-2799, RE -TAG PRIMARY UGND CABLE* 4226 W/NEW CABLE* 82269. FROM A-2799 TO A-2800, REMOVE PRIMARY UGND CABLE* 4227. FROM A-2800 TO A-3286, REMOVE PRIMARY UGNO CABLE* 5020. FROM A-2799 TO A-2801, REMOVE PRIMARY UGND CABLE* 4228. FROM A-10445 TO POLE, REMOVE PRIMARY UGND CABLE* 15432. TOTAL FOOTAGE: 1000' RIGHT OF WAY AND PUD EASEMENT: THE FOLLOWING APPLIES TO MAIN STREET R.O.W.= 60 FEET PUD EASEMENT = 10 FEET TRAFFIC CONTROL INSPECTION REQUIRED ANYTIME THE WORK ZONE IS SET UP IN THE RIGHT-OF-WAY RECEIVED FEB 08 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT ZZOZ/S 6/EO aBlON SV a�]AOdJddV -loefoJd pallpied ayl buunp sJn000 Jo pasneo sl ley! spJepuels Alp Jad A(eM-;0-ly61a A(lIO ul sluauaanoidwi CONSTRUCTION NOTES: AT TAKE OFF POLE INSTALL NEW LOCO AND FUSE a 65AMPS (E0202,EI065). INSTALL 1/0 TERMINATORS (T1013) INSTALL CABLE TAGS PER SCHEMATIC. AT VAULT A-2799 INSTALL (2)1/0 200AMP LB ELBOWS (T1105). NSTALL CABLE TAGS PER SCHEMATIC. AT VAULT A-2800 REMOVE EXISTING COVER. INSTALL (1) 4'8" K 7'0' LID (V0306). TRANSFER EXIST 100 KVA PDMT XFMR. NSTALL (2) 1/0 200AMP LB ELBOWS (TI105). INSTALL CABLE TAG PER SCHEMATIC. RECONNECT EXST SECONDARY SERVICES. AT VAULT A-2801 TRANSFER EXIST 100 KVA PDMT XFMR. INSTALL (1) 1/0 200AMP LB ELBOW (T1105). INSTALL (1) 200AMP DUST CAP (T1701). NSTALL CABLE TAG PER SCHEMATIC. RECONNECT EXST SECONDARY SERVICES. AT VAULT A-3286 TRANSFER EXIST 50 KVA PDMT XFMR INSTALL (1) 1/0 200AMP LB ELBOW (,, . INSTALL CABLE TAG PER SCHEMATIC. RECONNECT EXST SECONDARY SERVICES. AT VAULT A-10445 ) TRANSFER EXIST 50 KVA PDMT XFMR. INSTALL (1) 1/0 20CAMP LB ELBOW (TI105). NSTALL CABLE TAG PER SCHEMATIC. RECONNECT EXST SECONDARY SERVICES. \ 1 \ / \ � I I \ \ I \ \ I 1 Y EXST " OF 2 2" PVC \ / \f 1 N,A l \1 1 I 1 CABLE ALL FOOTAGES APPROXIMATE FROM A-2799 TO A-2800 215' OF (1) 1/0 AL 15KV CNCTRC NEUT JCKTD PRI IN EXST 2" PVC MAKE PO REEL FT MARK TO FROM A-2800 TO A-3286 380' OF (1) 1/0 AL 15KV CNCTRC NEUT JCKTD PRI IN EXST 2" PVC MAKE PO REEL FT MARK TO FROM A-2799 TO A-2801 120' OF (1) 1/0 AL 15KV CNCTRC NEUT JCKTD PRI IN EXST 2" PVC MAKE PO REEL FT MARK TO FROM POLE TO A-10445 90' OF (1) 1/0 AL 15KV CNCTRC NEUT JCKTD PRI IN EXST 2" PVC MAKE PO REEL FT MARK TO TOTAL FOOTAGE OF 1/0 CABLE INSTALLED: 805' A-3286 EXISTING 8515 A-2800 EXISTING 8511 I \ EXST L� - EXI 2" PVC A-2801 EXISTING ii A-2799 EXISTING 8419 I \ I --- EXST 8417 I 35' OF r PVC L-24704-x /,\. I A-10445 N EXISTING \ i LAYOUT V = 60' 0 [FD[o[ff) LOCATION 8407 MAIN STREET.EOMONOS 28026 AREA SO COUNTY POLE NO SW IAS 19 T 27 R 4 DATE 11/3/11 wo NO 378065 REASON FOR WORK REPLACE BO CABLE FOR ENGINEER JODOCK TASK 06 PARKVIEW APARTMENTS DRAFTER McPHERSON uGND NO 2597-3 APPROVED SNS SCALE NOTED GATE 12/15/11 DATE WORK COMPLETED FORENNI SUBSTATION FIVE CORNERS INSPECTOR CIRCUIT NO 12-1285 PHASE 3 PHONE FEES REQ'D ❑YEs ■w SSL ACCT• ROAD CROSSINGS ONLY PRIMARY OVERHEAD APPV DATE DESCRIPTION ❑ RESIOENTVL ❑ COMMERCIAL LED - REVISIONS a t-= t APPV NO. DATE DESCRIPTION PRIMARY UNDERGROUND SNS 1 3/15 REV CONST NOTES ❑ RESIDENTIAL L CABLE NOTES ❑ COMMERCIAL BASIC FEE f LEU- a s_>t t SECONDARY UNDERGROUND BASIC FEES o t_/•. t UNDERGROUND PLAT BASIC FEES ENGINEERING _CFTas =S PLAT CONSTRUCTION t FToi_=t STREET LIGHTING LFTa S_.S CROSSINGS CFTC i_.S WORK IN RIGHT OF WAY AS -BUILT NORTH ❑PRIMARY ❑ SEGO MPV NO. GATE DESCRIPTION FT . S = S - MISCELLANEOUS FEES VAULT S PERMIT t t S TOTAL DUES - DATE PAID RECEIPT* PROJECT LEAD STEPHEN STANGVIK CUSTOMER PROJECT LEADER: a PUGET SOUND WOODVAY VICINITY MAP TAGS VAULT: EXISTING CABLE: 81905 THRU 81908 AND 82269 DASSOCIATES, INC. Emplrefirs find Go 91.ds 19161 %THANE W.SVRE Z09 LYNHY00a, WA98016 (I15) 6T2-%51 PERMITS MATE GRANTED) ❑ TREE TRIM ❑ STATE ❑ COUNTY ■ EDMONDS EASEMENTS ■REQUIRED E- 06321 ❑ NOT REQUIRED E• 06437 REQUEST NO. DATE APPROVED FOREIGN CONTACTS ❑ JPN- ❑ JOINT TRENCH FRONTIER 6 CATV ❑ JOINT BORE FRONTIER 4 CATV 13 POLE STENCILING FROM TO TAKE OFF POLE PRE-CONSTR REQUIREMENTS ■ TREE TRIM ❑PUD LOCATOR ❑ BACRNOE . ■ FLAGGER ❑ ONE CALL DATE STREET LIGHTING ❑ YES ■ NO READY PHASING CIS WORKING 1LNNE I FINISHED JOINT USE LOCATION NM PACE KING PRINTED PRINTED 1/13/12 WORK SITE SL-128329-A TR 996 50-347773 -8537 1 J C-G 00-390652 1421-M E-06321 419-M E-06437 PH 2 - - - - - -- - 0 ', SL-13 528-A 210TH PL W TR 999 8518 A-36832 $ RECEIVED FEB 08 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT E1�$ag 417-M FU40 w A-10445 C�-f 3 50-65 9 75-453363 15-24704 3 5-452665 SL-112047-G in 75- 362 6487 LANE CLOSURI (TWO W;tfx = W 2 0 - 4= W20-7A X Zx r 2M ME 00 r n V / 00 NM �1004 z 1010 F—I 3 11012 21014 x END G20-2 ROAD WORK 48" x 24" (OPTIONAL) ON FLAGGE A TV OPER, O O O 10-LANE ROAD 4T10N) 48" x 24" i ROADNWORK G20-2 x (OPTIONAL) o 0 I. w A za W H:m o0 U-) o x a t —= N W20-7A W20-7B ONE LANE BE ROAD W 2 0 - 4 PREPARED AHEAD TO STOP ROAD OPTIONAL IF WORK W20-1 40 MPH OR LESS AHEAD RECEIVED FEB 08 2022 CITY OF EDMONDS M BuildingPermit.com CITY OF EDMONDS DEVELOPMENT $ERy ES DZ11TJ1NT Right-�t-�n_/a� _ _n11"Cai_ion #1089379 - WO 100038421 BO Cable Replacement Applicant First Name Last Name Company Name Moe Nave Snohomish County PUD Number Street Apartment or Suite Number E-mail Address PO Box 1107 jointuse@snopud.com City State Zip Phone Number Extension Everett WA 98206 4257835681 Contractor Company Name Owner Number Street Apartment or Suite Number City State Zip Phone Number Extension State License Number License Expiration Date UBI # E-mail Address Project Location Number Street Floor Number Suite or Room Number 8421 MAIN ST 306 City Zip Code County Parcel Number EDMONDS 98026 00647400330600 Associated Building Permit Number Tenant Name Additional Information (i.e. equipment location or special instructions)_ Work Location Property Owner First Name Last Name or Company Name Sarah N & Krowka Alexander Pilli Number Street Apartment or Suite Number 8421 MAIN ST 306 City State Zip EDMONDS WA 98026 Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work requires a licensed contractor to perform the work, the information will be provided prior to permit issuance. Date Submitted: 2/8/2022 Submitted By: Moe Nave Page 1 of 2 CITY OF EDMONDS MyBuildingPermit.com Right -of -Way Application #1089379 - WO 100038421 BO Cable Replacement Project Contact Company Name: Snohomish County PUD Name: Moe Nave Email: jointuse@snopud.com Address: PO Box 1107 Phone #: 4257835681 Everett WA 98206 Project Type Activity Type Scope of Work Utility Purveyor Utility Work No Disturbance of Surface Project Name: WO 100038421 BO Cable Replacement PUD crews will replace bad order cable located near 8407 Main St, Edmonds. Crews will set Description of up construction vehicles facing north on Main St. and replace bad primary underground cable Work: on existing conduit. Work shouldn't take more than 2 hours. No pedestrian detour needed and no tree trimming. Project Details Project Information Job Number 100038421 Page 2 of 2