Loading...
Engineering Permit FormDescription: ANTHOLOGY IMPROVEMENTS PER CIVIL PLANS WITH BLD2021-0116 Address: 21200 72ND AVE W EDMONDS WA 98026-7700 ISSUED: 03/21/2022 EXPIRES: 03/16/2023 Permit Type: RIGHTOF WAY I Permit Subtype: COMMERCIAL I Parcel Number: 00580700000401 NAME TYPE NAME APPLICANT MIKE PARKER CONTACT CADB CATALYST CNSTRCTN GRP LLC CONTRACTOR CADB CATALYST CNSTRCTN GRP LLC OWNER ADDRESS 130 E RANDOLPH ST 201, CHICAGO IL 60601 130 E RANDOLPH ST 201, CHICAGO IL 60601 130 E RANDOLPH ST, SUITE 2100, CHICAGO IL 60601 154 LAKE WASHINGTON BLVD E, SEATTLE WA 98112 PHONE (131)276-7253 (206)900-2395 (312)767-2531 DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 RIGHT OF WAY STANDARD PERMIT FEE $330.00 $330.00 REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW DATE Printed: Monday, March 21, 2022 2:22:42 PM 1 of 3 KIRRMF WAY PERMIT ER City of Edmonds •:• •ENG2022-00138 www.cityofedmonds. ov/425.771.0220 CONDITIONS CONDITION TYPEIL It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. ESC REQ Maintain erosion and sedimentation control per City and SWMMW standard requirements. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. ROW COMPACTION TEST Right of way compaction tests are required per City standards. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND OR NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. UNDERGROUND WIRING All new, extended, rebuilt, or relocated electrical utility and/or service shall be placed underground. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE A-1 ENGINEERING PRECON A-1 TESC AND MOBILIZE E-4 RPBA AND HOTBOX E-4 STRM STUB CONNECT E-4 WATER SERVICE LINE E-7 CONCRETE SIDEWALK E-7 CURB GUTTER E-7 DRY UTILITY LOCATION E-7 FH REFLECTOR E-7 RESTOR LIMITS E-7 SEWER LATERAL E-7 STORM CB E-7 STRIPING E-7 TRAFFIC CTRL E-7 TREE GRATE E-7 TRENCH COMPACTION TEST REPORT Printed: Monday, March 21, 2022 2:22:42 PM 2 of 3 HT -OF WAY PERMIT ER of • • • City mmu,11r7 ...0iENG2022-0038138 www.cityofedmonds.gov E-7 WATER MAIN E-7 WATER PRESSURE E-7 WATER PURITY E-7 WATER TAP AND SRV E-7 WATER THRUST BLOCK E-7 WATER VALVE CLUSTER E-9 PROJECT ASBUILTS X-2 ENGINEERING FINAL" E-7 PARKING OPEN -CLOSED E-7 SIDEWALK OPEN -CLOSED Printed: Monday, March 21, 2022 2:22:42 PM 3 of 3