Building PermitType: RESIDENTIAL BLDG Subtype: NEW SINGLE FAMILY I Status: ISSUED
Parcel No: 00484500300100
Subdivision: 004845
Fire Sprinklers: Yes
Valuation: $460,910.39
Code Edition: 2018
Site Address: 702 CEDAR ST EDMONDS,WA 98020-3417
Lot: 0
Lot Area:
Occupancy Type: R-3
No. Stories: 2
Zoning: RS-6
Construction Type: VB
# of Dwelling Units: 1
Scope of Work: REMELLA-PEZZA NEW SFR (DEMO EXISTING) P&M INCL
WA State Contractor L & I #: JLSC0I*997CR
Applied: 9/3/2021
Issued:3/23/2022
Final:
Expiration Date: 3/23/2023
Issued by: NED
CONTACTS
NAME TYPE
NAME
ADDRESS I
PHONE EMAIL
APPLICANT
MASSIMO AND MELINDA
702 CEDAR ST, EDMONDS WA
(206)618-5205
MMCEDAR@ICLOUD.COM
REMELLA-PEZZA
98020
CONTACT
MEDICI ARCHITCTS
11711 SE 8TH STREET STE 100,
(210)392-2963
schuyler@mediciarchitects.com
BELLEVUE WA 98005
CONTRACTOR
J L S CONSTRUCTION INC
19533 LAKE FRANCIS RD. SE,
(206)510-0420
scott@jlsconstruction.com
MAPLE VALLEY WA 98038
OWNER
M\ROY M E RAMELLA-PEZZA
702 CEDAR ST, EDMONDS WA
(206)618-5205
98020
•' •
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
1 -BASE FEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
3/23/22
R18887
PERMITS
1 - BASE FEE FOR PLUMBING
001.000.322.10.000.00
$50.00
$50.00
3/23/22
R18887
PERMITS
AIR HANDLERS - 10,000 CFM OR
001.000.322.10.000.00
$30.00
$30.00
3/23/22
R18887
LESS
APPLIANCE VENTS
001.000.322.10.000.00
$15.00
$15.00
3/23/22
R18887
BOILER OR COMPRESSOR - 50HP OR
001.000.322.10.000.00
$50.00
$50.00
3/23/22
R18887
LESS
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
6/28/21
R13202
PER PERMIT
EACH PLUMBING FIXTURE ON ONE
001.000.322.10.000.00
$255.00
$255.00
3/23/22
R18887
TRAP
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$990.00
$990.00
3/23/22
R18887
FAN CONNECTED TO SINGLE DUCT
001.000.322.10.000.00
$105.00
$105.00
3/23/22
R18887
FURNACE OR FIREPLACE
001.000.322.10.000.00
$60.00
$60.00
3/23/22
R18887
GAS PIPING - NEW OR LOCATED
001.000.322.10.000.00
$30.00
$30.00
3/23/22
R18887
HYDRONIC HEATING SYSTEM
001.000.322.10.000.00
$150.00
$150.00
3/23/22
R18887
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$3,266.00
$3,266.00
3/23/22
R18887
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$2,776.10
$2,776.10
6/28/21
R13202
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
3/23/22
R18887
Printed: Wednesday, March 23, 2022 11:26:29 AM 1 of 5
DESCRIPTION
ACCOUNT AMOUNT
PAID PAID DATE RECEIPT #
STORMWATER ENGINEER REVIEW
001.000.341.82.000.00
$130.00
$130.00
3/23/22 R18887
FEE
WATER HEATER - INCLUDING
001.000.322.10.000.00
$15.00
$15.00
3/23/22 R18887
EXPANSION TANK
TOTALS: $8,018.60 $8,018.60
CONDITIONS
CONDITION TYPE
STATUS
NOTES
48 HRS NOTICE-ENGR FINAL
FOR
48 Working hours notice is required when requesting your FINAL engineering inspection.
NFORMATION
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
FOR
CARBON MONOXIDE SYSTEMS
CARBON MONOXIDE SYSTEMS
NFORMATION
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
Pre -inspection required. Street to be cleaned of debris. Side sewer must be capped at
DEMOLITION REQUIREMENTS
FOR
property line. Water Service must be disconnected from Water Meter and or hose bib
INFORMATION
with AVB installed. Dump at approved dump site only.
ELECTRICAL PERMIT
O
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
ORMATION
FOR
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
INFORMATION
REQUIREMENTS.
FOR
In addition to the required pressure relief valve an approved listed expansion tank shall
EXPANSION TANK
INFORMATION
be installed on all hot water tanks per UPC 608.
FOR
The engineering division requires 48 hours notice prior to the date of the FINAL
FINAL INSPECTION SCHEDULING
INFORMATION
Inspection. Please call 425-771-0220 x 1326 to schedule.
FIRE FINAL INSPECTION
FOR
Request final Fire Department Inspection 425-775-7720.
NFORMATION
Printed: Wednesday, March 23, 2022 11:26:29 AM 2 of 5
AL : Permit
-
City •Edmonds
OL
121 98020 1 1
www.edmondswa.gov • iiiiiiiiii&
Approval of this foundation design is conditional subject to inspection of existing site soil
FOR
conditions. Retaining walls must be designed and constructed to resist the lateral
FOUNDATION BEARING
INFORMATION
pressure of the retained material. Provisions must be made for the control and drainage
of surface water around buildings.
GAS PIPE TEST
FOR
Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted
NFORMATION
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
HOSE BIBBS
O
Hose Bibbs are required to have a permanently affixed anti -siphon device installed.
ORMATION
INSP PRIOR TO BACKFILL
FOR
Call for all required inspections. All work shall be inspected prior to backfill.
NFORMATION
FOR
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
INFORMATION
www.mybuildingpermit.com
LOT LINES STAKED
FOR
Lot line stakes must be in place at the time of foundation setback inspection.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish
the datum point and the point of average grade. Call for inspections to verify. These
MAXIMUM HEIGHT
FOR
items must be consistent with the approved plan. If the proposed height of a building is
INFORMATION
within 12 inches of the maximum height permitted for the zone an elevation survey is
required.
Final approval on a project or final occupancy approval must be granted by the Building
OCCUPANCY
FOR
Official prior to use or occupancy of the building or structure. Check the job card for all
INFORMATION
required City inspections including final project approval and final occupancy inspections.
New and existing buildings shall have approved address numbers, building numbers or
approved building identification placed in a position that is plainly visible from the street
POST ADDRESS
FOR
or road fronting the property. Address numbers shall be Arabic numerals or alphabet
INFORMATION
letters Numbers shall be legible from the public way, at least 4 inches high with a half
inch min stroke width on a contrasting background.
The issuance of this permit in no way constitutes approval from any other agencies
REGULATING AGENCIES
FOR
having regulatory authority over the facility and this construction activity. It is the
INFORMATION
responsibility of the property owner to obtain any and all such required approvals.
REQUIRED SPECIAL
FOR
INSPECTIONS
INFORMATION
FOR
Heat pumps, AC units and similar equipment greater than 36 inches in height are not
SIDE YARD EQUIPMENT
INFORMATION
allowed within required building setbacks.
Sound or noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
SOUND AND NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites and activities must comply with the noise limits of Chapter 5.30, unless a variance
has been granted pursuant to ECC 5.30.120.
Printed: Wednesday, March 23, 2022 11:26:29 AM 3 of 5
'RESIDENTIAL BLDG Permit
PERMIT NUM
City of Edmonds
121
. •:� i 1 1
. •. •
Sound/Noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
SOUND OR NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has
been granted pursuant to ECC 5.30.120.
Special inspections have been called for on this project and are noted on the approved
SPECIAL INSPECTION BUILDING
FOR
construction plans. It is the owner and or contractors responsibility to ensure that reports
DIVISION
INFORMATION
are provided to the City on a weekly basis.
A Special Inspection agreement is required for this project. It is the owner/contractors
SPECIAL INSPECTIONS
FOR
responsibility to ensure inspections take place and that reports are provided to the
ENGINEERING
INFORMATION
Engineering Division on a weekly basis at Engineeringpermits@edmondswa.gov.
STORM COVENANT
O
A stormwater covenant shall be approved for recording prior to project final approval.
ORMATION
FOR
All utilities shall be located prior to any excavation. New locates shall be called for if at
UTILITY LOCATES
INFORMATION
time of excavation, original locates are no longer identifiable.
Installer shall provide the manufacturer installation, operating instructions, and a whole
FOR
WHOLE HOUSE FAN
house ventilation system operation description. A label shall be affixed to the whole
INFORMATION
house timer control that reads "Whole house ventilation, see operating instructions".
COMPLETED
SEQID INSPECTION TYPE
INSPECTOR
RESULT
NOTES
DATE
A-1 BUILDING PRECON
B-1 SETBACKS
B-2 DEMO AMT
VERIFICATION
B-2 FND DAMPPROOFING
B-2 FOOTINGS
B-2 FOUNDATION WALL
B-2 SHORING
B-2 SLAB INSULATION
B-3 EXT WALL SHEATHING
B-3 GAS PIPING TEST
B-3 HYD PRESSSURE TEST
B-3 MECH ROUGH IN
B-3 PLUMB ROUGH IN
B-3 PRE ROCK SHAFTS ETC
B-3 ROOF SHEATHING
B-3 UNDERFLR FRAMING
B-3 WATER SERVICE LINE
B-4 DRYWALL FASTENING
B-4 FRAMING
B-4 HEIGHT VERIFICATION
Printed: Wednesday, March 23, 2022 11:26:29 AM 4 of 5
RESIDENTIAL BLDG PermitCity • • • • -
98020 1 1
www.edmondswa.gov
B-4 INTERIOR SHEAR
B-4 SHOWER PAN
B-5 BLDG SPECIAL
INSPECTION
B-S INSULATION ENERGY
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
E-3 STRM CONVEYANCE
E-3 STRM COVENANT
E-3 STRM FOOTING DRAIN
E-3 STRM MGMT FACILITY
E-3 STRM TIGHTLINE
E-4 WATER SERVICE LINE
E-5 DRIVEWAY SLOPE
E-9 PROJECT ASBUILTS
X-2 ENGINEERING FINAL
E-3 STRM PERVIOUS
SURFACES
E-5 ENG SPECIAL INSPECTION
E-3 RET WALL DRAIN
OUTFALL
A-1 TESC AND MOBILIZE
E-9 COMPOST AMEND
B-2 RETAINING WALL
Printed: Wednesday, March 23, 2022 11:26:29 AM 5 of 5