Engineering Permit FormRIGHT OF WAY PERMIT
PERMIT NUMBER
City of Edmonds
..• • 1 11
www.cityofedmonds.gov• •
Description: ROW IMPROVEMENTS FOR SFR ISSUED: 03/23/2022
Address: 702 CEDAR ST EDMONDS WA 98020-3417
EXPIRES: 03/23/2023
rmit Type: RIGHT OF WAY Permit Subtype: RESIDENTIAL Parcel Number: 00484500300100
i
NAME TYPE NAME ADDRESS PHONE
APPLICANT SCHUYLER TUTT 11711 SE 8TH STREET 100, BELLEVUE WA 98005 (425)453-9298
CONTACT KATE KENNEDY-HUBLER 11711 SE 8TH STREET, BELLEVUE WA 98005 (425)453-9298
CONTRACTOR J L S CONSTRUCTION INC 19533 LAKE FRANCIS RD. SE, MAPLE VALLEY WA 98039 (206)510-0515
OWNER M\ROY M E RAMELLA-PEZZA 702 CEDAR ST, EDMONDS WA 98020
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT
$40.00 $40.00
ENGINEERING INSPECTION FEE
$660.00 $660.00
RIGHT OF WAY STANDARD PERMIT FEE
$330.00 $330.00
•
REQUIREMENT TYPE
NOTES
TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments
or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of
granting this permit.
RELEASED BY
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW
DATE
Printed: Wednesday, March 23, 2022 11:29:03 AM 1 of 2
RIGHT OF WAY PERMIT
PERMITNUMBER,
City of Edmonds
...0iENG2022-0058
www.cityofedmonds.gov•
CONDITIONS
CONDITION TYPE
NOTES
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
INSP PRIOR TO BACKFILL
Call for all required inspections. All work shall be inspected prior to backfill.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
RESTORE LANDSCAPE
Restore landscape to like or better conditions
ROW COMPACTION TEST
Right of way compaction tests are required per City standards.
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on
SOUND AND NOISE
weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT
NOTES
COMPLETE
X-2 ENGINEERING FINAL"
A-1 TESC AND MOBILIZE
E-7 CURB GUTTER
E-7 DWY APPROACH
E-7 PAVEMENT COMPACTION TEST
REPORT
E-7 PVMT SUBGRADE
E-7 RESTOR LIMITS
E-7 SEWER LATERAL
E-7 STORM CB
E-5 ENG SPECIAL INSPECTION
INSP - PERVIOUS DRIVEWAY
Printed: Wednesday, March 23, 2022 11:29:03 AM 2 of 2