Loading...
ENG2021-0420 ROW PERMITOF WAY EUC PERMIT PERMIT NUMBELR City of Edmonds J EdmondsRIGHT 98020 1 1 . -. •. Description: ZIPLY-PULL FIBER TO POLE, PLACE RISER, & OVERLASH TO CONDOS ISSUED: 03/24/2022 Address: 7303 224TH ST SW G-1 EDMONDS WA 98026-8349 EXPIRES: 09/20/2022 Permit Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 00672800700100 NAME TYPE NAME ADDRESS PHONE APPLICANT ZIPLY FIBER 1800 41ST ST, EVERETT WA 98201 (425)949-0230 CONTRACTOR PACIFIC CABLE CONSTRUCTION, INC. , EVERETT WA 98201-1255 (425)348-7735 OWNER TOOLEY MICHAEL G & MAGDALENA 7303 224TH ST SW UNIT G-1, EDMONDS WA 98026-8349 G FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $0.00 RIGHT OF WAY MINOR - EUC PERMIT FEE $110.00 $0.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW ENGINEERING DIVISION "DTED RELEASED BY — I 13/24/2022 DATE Printed: Thursday, March 24, 2022 4:03:07 PM 1 of 2 -KRWOF WAY EUC PERMIT City of • • • Ave•:• • ENG2021-0420 www.cityofedmonds. ov/425.771.0220 CONDITIONS CONDITION TYPE ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. ESC REQ Maintain erosion and sedimentation control per City and SWMMW standard requirements. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND OR NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. TRAFFIC CONTROL TRAFFIC CONTROL All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTION TYPE DATE 7JOB RESULT NOTES COMPLETE A-1 START X-2 ENGINEERING FINAL" Printed: Thursday, March 24, 2022 4:03:07 PM 2 of 2 of EpM04O� SECTION A ENG2021-0420 RECEIVED RIGHT OF WAY CONSTRUCTION OCT 29 2021 PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal CITY OF EDMONDS Requirements outlined in Ri ht-of-Wa permit Handout E6�. DEVELOPMENT q X p SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A' instead of leaving blank. All fields required. Incomplete Applications will be denied. General • Project Name 5509363 Site Address or if no site address use Property Address at NW corner of project area: 7303 224th ST SW Associated Permits: BLD PLN ENG Owner and Entity Holding Franchise (if applicable) Name of Company Ziply Fiber Franchise Ordinance No: WN U-17 Point of Contact Mike HaKahan Title Engineer Address 1800 41 St St, Ste N 100 city Everett State WA Zip 98203 Phone 425-949-0230 Email mike.hakahan@ziply.com Contractor and Authorized Agent of Owner (see note below) Name of company Pacific Cable Construction Contractor Contacts Primary Name During Construction Danielle Harrera Agent Name Danielle Herrera Title Permit Manager Title Permit Manager Mobile 425-348-7735 Address PO BOX 573 Email danielle@paccab.com City Woodinville State WA Zip 98072 Secondary Name Phone 425-348-7735 Title Email danielle@paccab.com Mobile City of Edmonds Business License No: PACI FCC954PJ Email State License No: 3636CON 1096 Of Contractor verifies it is currently bonded Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. m Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: m Utility Franchise Work associated with development (check one of the above boxes as welt ❑ Traffic Control Only (no associated development) ❑ Utility Franchise Work (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) Telecommunications and broadband provider Ziply Fiber to pull fiber from HH to pole 4 through existing conduit. Place riser at pole 4, then over lash fiber to pole 1.Place riser at pole 1.Then pull through existing conduit to customer property. RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF I x LF SF Alley 72 hours + LF Ix I LF SF Parking 72 hours + LF Ix I LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: VZtelecommunications ❑ cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm Details of Work to be Completed 1. Does the utility owner have existing overhead infrastructure in the area of work? Yes No 2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)? If yes, describe: 2 new risers and aeriel cable 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? V 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility stem? 5. Does the work involve proposed additions to an aboveground utility stem? If es: Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? Details of Work to be Completed Yes No 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? If yes, answer the following questions related to project area, i.e. the actual area in which the / V project is proposed: 6a. Does your project involve wires/cables/lines? If yes: How many are existing? I I How many are to be added? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 6b. Does your project involve poles? If yes: How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: lb; � Z_Zz� DATE: 10-29-2021 APPLICANT PRINTED NAME: Marcus Luna APPLICANT TITLE: Permit Coordinator NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 LOCATION MAP WO 5509363 MDU 145 LU 7303 224TH ST SW EDMONDS, WA 98026 READYLINKS SOLUTION _ 218TH ST SW / I � / � W O i L _ _ 216TH ST SW �— I -� - - - - - - - - _ _ _ _ 220TH ST SW Lu' Lu /' JOB LOCATION Q I Q MILL PARK CONDOS o / 7303 224TH ST SW 00 222ND ST SW // EDMONDS, WASHINGTON � I i 223RD ST SW i I 224TH ST SW Lu IQ I J Lu > I J I Q d I � � I �Py j, 218TH ST SW 60TH AVE W Lu I>, l0 I - �222ND ST SW I I � I Iw I �� IQ kD , X: I I 224TH ST SW _ Ln 224TH ST SW Lu Lu CL 225TH PL-SW Q I I z I Z � � � 225TH ST SW ,y r\l 00 00 I a 225TH ST SW I , I 0 /^N / I -� - I > / I 226TH PL SW 00 ' I �- 228TH ST SW 1228TH ST SW _ - i / w Q / 4� I I // , ^"/ 230TH ST SW � I �\ _ � / / i / i x POINTS OF CONTACT / OSP ENGINEER: MIKE HAKAHAN 425-949-0230 OPCEN COORDINATOR: JOHN WOOD 425-261-1412 FACILITIES TECH: PATRICK WINKLER 425-263-4010 PROPERTY CONTACT: UNKNOWN DESIGN BY: BENJAMIN LUTZ BENJAMINLUTZ(0)ATCOTELECOM.COM 228TH ST SW I 23oT" Sr SW I Lu > �J a J� o I I 1 I I� , I I , DETAILED & TCP PERMIT REQUIRED ROE REQUIRED W.O. DRIVER ❑ ETHERNET ❑ CIAC ❑ DAMAGE ® MDU CONSTRUCTION START 11 /10/2021 IN SERVICE DATE 2/8/2022 CONSTRUCTION ❑ FLAGGING ❑ BRUSHING ❑ CONTRACTOR PERMITS MUNICIPALITY: SNOHOMISH COUNTY ❑ BLANKET ® TCP/TRAFFIC ® DETAILED (NOT BLANKET) ❑ NO PERMIT REQUIRED RECEIVED OCT 29 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT i CAUTION ** MULTIPLE VOLTAGE POWER CIRCUITS OVERHEAD I I i 811 NQ;11� CALL BEFORE YOU DIG ziply-fiber MILL PARK CONDOS-HLLKWAXX I 7303 224TH ST SW, EDMONDS, WA PROJECT C.O. AREA: 962 NUMBER: 5509363 EXCH. CODE: 51419 DRAWN DATE: ENGR: M. HAKAHAN CNTY: SNOHOMISH I 10/21/2021 PHONE: FILE: SCALE: 1:100 TAX DISTRICT: I DWG 1 OF 9 ITWNSHP: 27N RNG: 4E SEC: S29 CONSTRUCTION NOTES SPLICE AND PULL 60OFT OF NEW 48CT FIBER FROM EXISTING FDH H4004 TO PED #1 AT SITE. BORE 3,322 FT / TRENCH 331 FT INSIDE PROPERTY. PLACE (3) 1X8 SPLITTERS WITH (2) SPLICE CASES AND UPSIZE (12) PEDS. UPSIZE (12) PEDESTALS AND PLACE (11) 6-PORT MSTS AT SPECIFIED PEDS. PLACE (24) OSP READYLINK 4 PORT UNITS ON THE OUTSIDE OF EACH BUILDING. RUN FIBER DROPS FROM MSTS AT PEDS TO READYLINK OSP UNITS. IdSNI �-W 3�n(13HOS MATERIALS LIST (3) SPLITTER 1X8 OCC19-10800-NNNQNQF/CC8542-000 (1) FOSC450-136-6-NT-0-133V FOSC 6PORTS 3 GND LUGS/058514-000 (2) FOSC-ACC-B-TRAY-24 TRAY WITH 2SM-12 MODULES/863927-000 (2) PEDESTAL PRO1420 SPLICE 14X20/0000491986 (600) FO CABLE 48F 3422 GRP NON-ARMW/FAB/048ZU4-T4F22D20 (19900) FO CABLE 24F 3422 GRP NON-ARMWFAB/024ZU4-T4F22D20 (10) PEDESTAL 121N PROFORM E/W421NMTG/F1007864 (8) 6-PORT 50' - MST TERM INAL/MOB-0644FD050FW (2) 6-PORT 200' - MST TERM INAL/MOB-0644FD200FW (1) 6-PORT 500' - MST TERM INAL/MOB-0644FD500FW (24) 4 PORT SWITCH - HARDENED CHASSIS (RPF)/GL-4XTH-PD-50-RPF-RV W.O. DRIVER ❑ ETHERNET ❑ CIAC ❑ DAMAGE ® MDU CONSTRUCTION START 11 /10/2021 IN SERVICE DATE 2/8/2022 CONSTRUCTION ❑ FLAGGING ❑ BRUSHING ❑ CONTRACTOR PERMITS MUNICIPALITY: SNOHOMISH COUNTY ❑ BLANKET ® TCP/TRAFFIC ® DETAILED (NOT BLANKET) ❑ NO PERMIT REQUIRED RECEIVED OCT 29 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT ** CAUTION ** MULTIPLE VOLTAGE POWER CIRCUITS OVERHEAD fill O � �A 0 O CALL BEFORE YOU DIG Ziplyfiber MILL PARK CONDOS-HLLKWAXX 7303 224TH ST SW, EDMONDS, WA PROJECT 5509363 C.O. AREA: 962 NUMBER: EXCH. CODE: 51419 DRAWN DATE: ENGR: M. HAKAHAN CNTY: SNOHOMISH 10/21/2021 PHONE: FILE: SCALE: 1:100 TAX DISTRICT: DWG 2 OF 9 TWNSHP: 27N RNG: 4E SEC: S29 PRINT 6 dsN1 �-1b 31n SEE PRINT 8 FOR PLACING & SPLICING TASKS & PRINT 9 FOR TERM ADDRESS 330' PULL 24-FIBER IN 2' OCCUPIED DUCT, FROM PED #2 TO PED #3 2422.201 S4018,1-11+ XD,12-24 AEF 100 26 PLACE 6 PORT TERM 50' HLLKWAXX 786603 7303 224TH ST SW 2422.201 S4018,12-13+ XD,3-6 ENTRANCE 46' 48-FIBER FROM FDH H4004 TO TOP OF POLE #4 2422.201 XD,1-11 + FC10309335-340+ - - X0,18-48 os P 7209 12 UNITS P1-P12 PRINT 4 p , iv I I 210' PULL L4-F16EK IN Z- p j I NEW DUCT, FROM PED #1 I 7315 j I PULL (3) OSP DROPS 170' EA TO PED #12 I 12 UNITS I2422.21 2422.201 o B1-612 I S4018,12-13 O 0 XD,1+ I S4018,14-22+ I I I XD 3 PLACE (2) 4-PORT RL SWITCH XD,11-24 I I II II N I I I I LLI PLACE 6 PORT TERM 50' PULL (3) OSP DROPS 150' EA m I I I I I I m 2422.201 n /� 7303 224TH ST SW A I I S4018,23-24+ O 0 ' V' 2422.201 I I r XD,3 7205 S4018,23-24+ I I PLACE (2) 4-PORT RL SWITCH 12 UNITS XD93-6 j I M1-M12 II I wai j I PED#1 I REPLACE PED,( I I I F AEF 25 26�j I I 114' BORE 2' DUCT W/ PR01420 I I I I ® J AEF 100 261 AEF 25 26�------------------------------�� ----------------- j -------- ---------------------- ------------- ---------- ----------------------------------------J PED#2 249' OCCUPIED 2" DUCT REPLACE PED W/ PRO12 275' PULL 24-FIBER IN 2- 7 OCCUPIED DUCT, FROM 145' PULL 48-FIBER IN 2' 224TH ST SW PED #1 TO PED #2 OCCUPIED DUCT, FROM TOP 2422.201 OF POLE #1 TO PED #1 S4018,1-13+ 2422.201 491' LASH 48-FIBER TO EXISTING, _ _ - _ XD,14-24 _ - - - XD,1-11+ PL 50' COIL FOR FUTURE SPLICE PL RISER FROM POLE #4 TO POLE #1 2421.201 XD1-11+ O FCi 03O,335-340 XD,18-48 I POLE #4 0/ HANDHOLE 153' P-P POLE #3(N SNOHOMISH � HH , HLLKWAXX 3X3 SNOHOMISH COUNTYF21'4"CONDUIT COUNTY CCUPIED H4004 �HLLKWAXX FDH 48/288 IN: HLLKWAXX FC1030,325-326+ d I XD,65-278+ HLLKWAXX FC1030,327-336 0 402' 09.2008 OUT: HLLKWAXX H4004,1-288 � I RBN 24 XD,1-3+ HLLKWAXX H4004,268-282+ XD,283-288 357' 05.2008 VATS LT , HLLKWAXX H4004,217-232+ 800' 05.2008 RBN 0 HLLKWAXX H4004,1-192+ XD,193-216 792' 03.2008 RBN 24 HLLKWAXX FC1030,325-340+ XD,17-24 366' 05.2008 VATS LT 0 HLLKWAXX H4004,193-212+ XD,21-24 184' P-P 0 -t'u ,, o V, c,, 2111-, I-L✓J I r NLu 19 NOISIAIC . VJ `v I0N3 W.O. DRIVER O m ❑ ETHERNET ❑ CIAC ❑ DAMAGE ® MDU CONSTRUCTION START 11 /10/2021 IN SERVICE DATE 2/8/2022 CONSTRUCTION AEF 100 26 ❑ FLAGGING ❑ BRUSHING ❑ CONTRACTOR PERMITS MUNICIPALITY: SNOHOMISH COUNTY 99' OCCUPIED 2" DUCT ❑ BLANKET ® TCP/TRAFFIC 0 DETAILED (NOT BLANKET) ❑ NO PERMIT REQUIRED -- ----------- I I ENTRANCE C. O. _ O :O FC1030,335-340 XD,18-48 AKF 200 24- AKF 200 24 \ O PL RISER �, PLACE (3) 8 PORT 1X8 SPLITTERS IN: FC1030,335 OUT: S4018,1-8 IN: FC1030,336 -.1 0- OUT: S4018,9-16 IN: FC1030,337 z OUT: S4018,17-24 04 ® 75' P-P POLE #2 POLE #1 SNOHOMISH SNOHOMISH COUNTY COUNTY I PL 50' COIL FOR FUTURE SPLICE I RECEIVED OCT 29 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT ** CAUTION ** MULTIPLE VOLTAGE POWER CIRCUITS OVERHEAD 811 NQ;11� CALL BEFORE YOU DIG zeiply"fiber MILL PARK CONDOS-HLLKWAXX 7303 224TH ST SW, EDMONDS, WA PROJECT 5509363 C.O. AREA: 962 NUMBER: EXCH. CODE: 51419 DRAWN DATE: ENGR: M. HAKAHAN CNTY: SNOHOMISH 10/21/2021 PHONE: FILE: mi w SCALE: 1:100 TAX DISTRICT: DWG 3 OF 9 ITWNSHP: 27N RNG: 4E SEC: S29 }oefoid pa} vied aye buunp sin000 in nasnen si ieui snienucis Run mci PRINT 5 O PLACE 6 PORT TERM 50' I HLLKWAXX 819302 7303 224TH ST SW 2422.201 L� 273' BORE 2- DUCT S4018,19+ ------------------- ------- XD,2-6 AEF 25 26-----1 I O PLACE 6 PORT TERM 200' PULL (2) OSP DROPS 95' EA I HLLKWAXX 786605 S4012422.201 i I 7303 224TH ST SW XD,2 19+ 13 10 H II 2422.201 3l I PULL 6 PORT 500' TAIL IN S4018,16-18+ PLACE (1) 4-PORT RL SWITCH 7301 c I NEW 2- DUCT, FROM XD,4-6 8 UNITS j I PED #9 TO PED #8 H1-H8 I 2422.201 II S4018,14-15+ ~ 12 j XD,3-6 III F_J 72' TRENCH (2) 2- DUCT --� AEF 25 26�I l i i------------- PED#9 REPLACE PED I PULL 6 PORT 200' TAIL IN �_I I AEF 25 26 W/ PRO12 NEW 2- DUCT, FROM PED Ii AEF 100 26 I j 100' PULL 24-FIBER IN 2' K #9 TO PED #11 2422.201 j III j NEW DUCT, FROM PED 7219 S4018,I I I #10 TO PED #9 12 UNITS XD94-617-19 V l j l I v 2422.201 4-6 II I I XD 1+ K1-K12 — I G II I G ■ III I cv S4018,14-19+ N I j I I XD98-24 PULL (3) OSP DROPS 220' I lu l I I = 2422.201 10 I I I W S4018,16-17+ 16 13 I m II I pj XD,3 j co G 11 I I F PLACE (2) 4-PORT RL SWITCH j I POOL I I r IPULL (3) OSP DROPS 175' EA III 2422.201 7203 I I AEF 25 26 I I S4018920-21+ 10 198' BORE 2' DUCT I j 1 UNIT j POOL i i 135' PULL 24-FIBER IN 2' j I 0 PLACE (2) 4-PORT RL SWITCH 1 I I NEW DUCT, FROM PED #12 I p I—AEF 25 26 I I I I I I TO PED #10 I I ■ j l I I 2422.201 j I N III I I 11 XD,1+ I Lu S4018914-19+ I I O �III I 2PR DROP XD,8-24 l J PED#10 AEF 25 26-1 U) �� REPLACE PED AEF 100 26 ' TRENCH W/ PRO12 i PED#12 1�tI2! DUCT I REPLACE PIED j 108'BORE 2'DUCT W/ PRO12 L------------------ --- PED#11 REPLACE PED © AEF 25 26�Lill"' PLACE 6 PORT TERM 50' W/ PRO12 F------------------- --- i I HLLKWAXX 786604 PULL (1) OSP DROP 35' 7303 224TH ST SW 2422.201 I 2422.201 P S4018,18 15 12 I I In S4018920-22+ PLACE (1) 4-PORT RL SWITCH j j I ■ XD,4-6 7209 N 12 UNITS I I I � P1-P12 I i I 0 m 210' 24-FIBER FROM L M I PED #1 TO PED #2 7201 J r 2422.201 8 UNITS—�—PULL (2) OSP DROPS 135' EA XD,1+ L1-L8 2422.201 SEE PRINT 8 FOR S4018,14-2 + S4018,22+ O9 07 PLACING & SPLICING XD,11-24 XD,1 TASKS & PRINT 9 FOR <i0 PLACE (1) 4-PORT RL SWITCH TERM ADDRESS PRINT 3 PRINT 3 W.O. DRIVER ❑ ETHERNET ❑ CIAC ❑ DAMAGE ® MDU CONSTRUCTION START 11 /10/2021 IN SERVICE DATE 2/8/2022 CONSTRUCTION ❑ FLAGGING ❑ BRUSHING ❑ CONTRACTOR PERMITS MUNICIPALITY: SNOHOMISH COUNTY ❑ BLANKET ® TCP/TRAFFIC ® DETAILED (NOT BLANKET) ❑ NO PERMIT REQUIRED RECEIVED OCT 29 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT ** CAUTION ** MULTIPLE VOLTAGE POWER CIRCUITS OVERHEAD 811 NQ;11� CALL BEFORE YOU DIG ziply"fiber MILL PARK CONDOS-HLLKWAXX 7303 224TH ST SW, EDMONDS, WA PROJECT C.O. AREA: 962 NUMBER: 5509363 EXCH. CODE: 51419 DRAWN DATE: ENGR: M. HAKAHAN CNTY: SNOHOMISH 10/21/2021 1 PHONE: FILE: SCALE: 1:100 ITAXDISTRICT: DWG 4 OF 9 TWNSHP: 27N IRNG: 4E ISEC: PULL (3) OSP DROPS 175' EA PULL (3) OSP DROPS 100' EA 2422.201 18 0 2422.201 S4018,14-15+ O S4018,1-2+ 29 26 XD,3 XD,1 PLACE (2) 4-PORT RL SWITCH PLACE (2) 4-PORT RL SWITCH I I I I I II I I I oil I G = I j 7303 12 UNITS W I I G1-G12 d,ll F I I I � I II I I' I II I I I' I II AEF 25 26 I PED#7 REPLACE PIED I W/ PRO12 I 28 0 TRM H Z OC L AEF 25 26 j 711 G II N I J I 19 I i 7223 ca 12 UNITS iv I I N J1-J12 I I � I I I 17 L= \ TRM PLACE 6 PORT TERM 500' PED#8 REPLACE PI W/ PRO12 PULL 6 PORT 200' TAIL 2422.201 S4018,1-2+ XD,3-6 14 HLLKWAXX 786606 7303 224TH ST SW -F 2422.201 S4018,14-15+ XD,3-6 I H V C N W 19 0 m M N PULL 6 PORT 500' TAIL 2422.201 S4018,14-15+ XD,3-6 iPLACE 6 PORT TERM 200' HLLKWAXX 787203 7303 224TH ST SW 2422.201 S4018,1-2+ O� XD,3-6 Cif PRINT 4 W.O. DRIVER ❑ ETHERNET ❑ CIAC ❑ DAMAGE ® MDU CONSTRUCTION START 11 /10/2021 IN SERVICE DATE 2/8/2022 CONSTRUCTION ❑ FLAGGING ❑ BRUSHING ❑ CONTRACTOR PERMITS MUNICIPALITY: SNOHOMISH COUNTY ❑ BLANKET ® TCP/TRAFFIC ® DETAILED (NOT BLANKET) ❑ NO PERMIT REQUIRED RECEIVED OCT 29 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT ** CAUTION ** MULTIPLE VOLTAGE POWER CIRCUITS OVERHEAD 811 NQ;11� CALL BEFORE YOU DIG ziply"fiber MILL PARK CONDOS-HLLKWAXX 7303 224TH ST SW, EDMONDS, WA SEE PRINT 8 FOR PROJECT C.O. AREA: 962 PLACING $SPLICING NUMBER: 5509363 EXCH. CODE: 51419 TASKS & PRINT 9 FOR DRAWN DATE: ENGR: M. HAKAHAN CNTY: SNOHOMISH TERM ADDRESS 10/21/2021 PHONE: FILE: SCALE: 1:100 TAX DISTRICT: DWG 5 OF 9 TWNSHP: 27N RNG: 4E SEC: S29 PLACE 6 PORT TERM 50' HLLKWAXX 787003 7303 224TH ST SW 2422.201 S4018,7-9+ XD,4-6 PULL (2) OSP DROPS 85' EA 2422.201 S4018,9+ XD,2 PLACE (1) 4-PORT RL SWITCH 0 PULL (3) OSP DROPS 130' EA 2422.201 S4018,7-8+ XD,3 PLACE (2) 4-PORT RL SWITCH SEE PRINT 8 FOR PLACING & SPLICING TASKS & PRINT 9 FOR TERM ADDRESS 105' PULL 24-FIBER IN 2' NEW DUCT, FROM PED #4 TO PED #5 2422.201 S4018,1-6+ XD,7-24 240' PULL 24-FIBER IN 2' OCCUPIED DUCT, FROM PED #3 TO PED #4 2422.201 S4018,1-9+ XD,10-24 AEF 25 26 H t� 7 c N PRINT 7 AEF 50 26 84' BORE 2' DUCT ---- - -- 210' OCCUPIED 2" DUCT I II I I II I II I I II I II I I II I I I I II I I II I II I I I AEF 100 26 II I I I' I II I I II I II I I PED#3 I I REPLACE PED / W/PRO1420 LT -- I I +I I I I I I I PLACE 6 PORT TERM 50' I HLLKWAXX 787002 W I I 7303 224TH ST SW mI j 2422.201 A S4018,10-11+ 7317 XD,3-6 12 UNITS PULL (3) OSP DROPS 165' EA — I Al-Al2 2422.201 S4018,10-11 + KR r XD,3 PLACE (2) 4-PORT RL SWITCH D 7307 18 8 UNITS D1-D8 1 21 AEF 25 26 64' TRENCH 2' DUCT ----------- 22 19 PED#4 I O 0 REPLACE PED W/PRO12 HIV E I � I I G AEF 25 26 I cv I I W II0 I O I m I I I I � l�O23 20 F C 7311 12 UNITS Cl-C12 B 7315 12 UNITS B1-B12 330' 24-FIBER FROM PED #2 TO PED #3 2422.201 S4018,1-11 + XD,12-24 W.O. DRIVER ❑ ETHERNET ❑ CIAC ❑ DAMAGE ® MDU CONSTRUCTION START 11 /10/2021 IN SERVICE DATE 2/8/2022 CONSTRUCTION ❑ FLAGGING ❑ BRUSHING ❑ CONTRACTOR PERMITS MUNICIPALITY: SNOHOMISH COUNTY ❑ BLANKET ® TCP/TRAFFIC ® DETAILED (NOT BLANKET) ❑ NO PERMIT REQUIRED RECEIVED OCT 29 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT ** CAUTION ** MULTIPLE VOLTAGE POWER CIRCUITS OVERHEAD 811 NQ;11� CALL BEFORE YOU DIG ziply"fiber MILL PARK CONDOS-HLLKWAXX 7303 224TH ST SW, EDMONDS, WA PROJECT C.O. AREA: 962 NUMBER: 5509363 EXCH. CODE: 51419 DRAWN DATE: ENGR: M. HAKAHAN CNTY: SNOHOMISH 10/21/2021 PHONE: FILE: SCALE: 1:100 TAX DISTRICT: I DWG 6 OF 9 TWNSHP: 27N RNG: 4E SEC: S29 PULL (3) OSP DROPS 220' EA 2422.201 O S4018,3-4+ 27 XD,3 PLACE (2) 4-PORT RL SWITCH Hr---------------------------- pl I j I I I I NII W I 0II °' F m I c ; 9077 N I I 12 UNITS AEF 25 26f F1 F12 PLACE 6 PORT TERM 50' I HLLKWAXX 787202 7303 224TH ST SW 2422.201 S4018,3-4+ XD,3-6 190' PULL 24-FIBER IN 2' OCCUPIED DUCT, FROM PED #5 TO PED #6 2422.201 S4018,1-4+ XD,5-12 E 7309 12 UNITS I El-E12 I II I I III F I V I � PULL (3) OSP DROPS 115' EA I cV 2422.201 I I = S4018,5-6+ 25 XD,3 22 I PLACE (2) 4-PORT RL SWITCH I W I I F I � j SEE PRINT 8 FOR I I PLACING & SPLICING PED#5 ACE REPLACE PED TASKS & PRINT 9 FOR 105' PULL 24-FIBER AEF 25 26 -II 2422.201 PROI W/ TERM ADDRESS S4018,1-6+ L-----------------�� XD,7-24 23 26 `������ PED#6 REPLACE PED W/ PRO12 AEF 50 26 �� 21 24 PRINT 6 175' BORE 2' DUCT II PULL 6 PORT 200' TAIL IN 2- NEW DUCT, FROM I I PED #6 TO PED #7 2422.201 I I S4018,1-2+ I I XD,3-6 EF 50 26 PLACE 6 PORT TERM 50' HLLKWAXX 787004 7303 224TH ST SW 2422.201 S4018,5-6+ XD,3-6 II II I I Ln H Z ce a W.O. DRIVER ❑ ETHERNET ❑ CIAC ❑ DAMAGE ® MDU CONSTRUCTION START 11 /10/2021 IN SERVICE DATE 2/8/2022 CONSTRUCTION ❑ FLAGGING ❑ BRUSHING ❑ CONTRACTOR PERMITS MUNICIPALITY: SNOHOMISH COUNTY ❑ BLANKET ® TCP/TRAFFIC ® DETAILED (NOT BLANKET) ❑ NO PERMIT REQUIRED RECEIVED OCT 29 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT ** CAUTION ** MULTIPLE VOLTAGE POWER CIRCUITS OVERHEAD 811 NQ;11� CALL BEFORE YOU DIG ziply"fiber MILL PARK CONDOS-HLLKWAXX 7303 224TH ST SW, EDMONDS, WA PROJECT C.O. AREA: 962 NUMBER: 5509363 EXCH. CODE: 51419 DRAWN DATE: ENGR: M. HAKAHAN CNTY: SNOHOMISH 10/21/2021 PHONE: FILE: SCALE: 1:100 TAX DISTRICT: DWG 7 OF 9 TWNSHP: 27N IRNG: 4E ISEC: PLACING OP43C - 46' PLACE 48 RIBBON FIBER IN OCCUPIED DUCT - 2422.201 P22K - PLACE RISER OP22D - 491' OVERLASH 48 RIBBON FIBER TO EXISTING - 2421.201 OP22K - PLACE RISER P43C - 145' PLACE 48 RIBBON FIBER IN OCCUPIED DUCT - 2422.201 O4 P61C - 1 - REARRANGE/CHANGE OUT EXISTING PEDESTAL P59A - 187' - BORE OP59A - 114' - BORE P43F - 150' PULL OSP DROP IN NEW DUCT - 2422.201 P43J - 300' - PL ADDITIONAL DROPS IN NEW DUCT - 2422.201 OP61C - 1 - REARRANGE/CHANGE OUT EXISTING PEDESTAL P43C - 275' PLACE 24 RIBBON FIBER IN OCCUPIED DUCT - 2422.201 O7 P59A - 148' - BORE P43F - 170' PULL OSP DROP IN NEW DUCT - 2422.201 P43J - 340' - PL ADDITIONAL DROPS IN NEW DUCT - 2422.201 OP61C - 1 - REARRANGE/CHANGE OUT EXISTING PEDESTAL P43C - 210' PLACE 24 RIBBON FIBER IN NEW DUCT - 2422.201 P59A - 108' - BORE OP59A - 113' - BORE P43F - 135' PULL OSP DROP IN NEW DUCT - 2422.201 P43J - 135' - PL ADDITIONAL DROPS IN NEW DUCT - 2422.201 10 P59A - 155' - BORE P43F - 175' PULL OSP DROPS IN NEW DUCT - 2422.201 P43J - 350' - PL ADDITIONAL DROPS IN NEW DUCT - 2422.201 11 P61C - 1 - REARRANGE/CHANGE OUT EXISTING PEDESTAL P43C - 135' PLACE 24 RIBBON FIBER IN NEW DUCT - 2422.201 P57A - 78' - HAND DIG TRENCH 12 P61C - 1 - REARRANGE/CHANGE OUT EXISTING PEDESTAL P43C - 100' PLACE 24 RIBBON FIBER IN NEW DUCT - 2422.201 P57A - 72' - TRENCH P59A - 80' - BORE P59A - 273' - BORE PLACING & SPLICING 13 P60A - 72' - PLACE ADDITIONAL 2' BURIED DUCT P43F - 95' PULL OSP DROP IN NEW DUCT - 2422.201 P43J - 95' - PL ADDITIONAL DROP IN NEW DUCT - 2422.201 14 P61C - 1 - REARRANGE/CHANGE OUT EXISTING PEDESTAL P43H - 200' 6 PORT TAIL - PULL CABLE IN OCCUPIED DUCT - 2422.201 15 P57A - 15' - HAND DIG TRENCH P43F - 35' PULL OSP DROP IN NEW DUCT - 2422.201 16 P59A - 198' - BORE P43F - 220' PULL OSP DROP IN NEW DUCT - 2422.201 P43J - 440' - PL ADDITIONAL DROP IN NEW DUCT - 2422.201 17 P61C - 1 - REARRANGE/CHANGE OUT EXISTING PEDESTAL P43H - 500' 6 PORT TAIL - PULL CABLE IN OCCUPIED DUCT - 2422.201 18 P59A - 152' - BORE P43F - 175' PULL OSP DROPS IN NEW DUCT - 2422.201 P43J - 350' - PL ADDITIONAL DROP IN NEW DUCT - 2422.201 19 P61C - 1 - REARRANGE/CHANGE OUT EXISTING PEDESTAL P43C - 330' PLACE 24 RIBBON FIBER IN OCCUPIED DUCT - 2422.201 20 P59A - 144' - BORE P43F - 165' PULL OSP DROP IN NEW DUCT - 2422.201 P43J - 330' - PL ADDITIONAL DROP IN NEW DUCT - 2422.201 21 P61C - 1 - REARRANGE/CHANGE OUT EXISTING PEDESTAL P43C - 240' PLACE 24 RIBBON FIBER IN OCCUPIED DUCT - 2422.201 P59A - 84' - BORE 22 P57A - 64' - HAND DIG TRENCH P43F - 85' PULL OSP DROP IN NEW DUCT - 2422.201 P43J - 85' - PL ADDITIONAL DROP IN NEW DUCT - 2422.201 23 P59A - 110' - BORE P43F - 130' PULL OSP DROP IN NEW DUCT - 2422.201 P43J - 260' - PL ADDITIONAL DROP IN NEW DUCT - 2422.201 24 P61C - 1 - REARRANGE/CHANGE OUT EXISTING PEDESTAL P43C - 105' PLACE 24 RIBBON FIBER IN NEW DUCT - 2422.201 25 P57A - 93' - HAND DIG TRENCH P43F - 115' PULL OSP DROP IN NEW DUCT - 2422.201 P43J - 230' - PL ADDITIONAL DROP IN NEW DUCT - 2422.201 26 P61C - 1 - REARRANGE/CHANGE OUT EXISTING PEDESTAL P43C - 190' PLACE 12 RIBBON FIBER IN OCCUPIED DUCT - 2422.201 P59A - 175' - BORE 27 P59A - 201' - BORE P43F - 220' PULL OSP DROP IN NEW DUCT - 2422.201 P43J - 440' - PL ADDITIONAL DROP IN NEW DUCT - 2422.201 28 P61C - 1 - REARRANGE/CHANGE OUT EXISTING PEDESTAL P43H - 200' 6 PORT TAIL - PULL CABLE IN NEW DUCT - 2422.201 29 P57A - 81' - HAND DIG TRENCH P43F - 100' PULL OSP DROP IN NEW DUCT - 2422.201 P43J - 200' - PL ADDITIONAL DROP IN NEW DUCT - 2422.201 SPLICING S50A - SPLICE FIBER (6) BS14 - FIBER SET-UP (1) 0 S14B - PLACE SPLITTER (3) BS14 - FIBER SET-UP (1) S13D - PLACE 6-PORT TERMINAL (1) S07B - TERMINATE PAIRS (2) S50A - SPLICE FIBER (24) S14B - PLACE 4-PORT RL SWITCH (2) ® S13D - PLACE 6-PORT TERMINAL (1) S07B - TERMINATE PAIRS (2) S50A - SPLICE FIBER (13) S14B - PLACE 4-PORT RL SWITCH (2) © S13D - PLACE 6-PORT TERMINAL (1) S07B - TERMINATE PAIRS (3) S50A - SPLICE FIBER (6) S14B - PLACE 4-PORT RL SWITCH (1) ® S14B - PLACE 4-PORT RL SWITCH (2) S50A - SPLICE FIBER (6) S13D - PLACE 6-PORT TERMINAL (1) S07B - TERMINATE PAIRS (1) 10 S14B - PLACE 4-PORT RK SWITCH (1) 11 S13D - PLACE 6-PORT TERMINAL (1) S07B - TERMINATE PAIRS (3) S50A - SPLICE FIBER (3) 12 S14B - PLACE 4-PORT RL SWITCH (1) 13 S14B - PLACE 4-PORT RL SWITCH (2) 14 S13D - PLACE 6-PORT TERMINAL (1) S07B - TERMINATE PAIRS (2) 15 S14B - PLACE 4-PORT RL SWITCH (2) 16 S13D - PLACE 6-PORT TERMINAL (1) S07B - TERMINATE PAIRS (2) S50A - SPLICE FIBER (11) 17 S14B - PLACE 4-PORT RL SWITCH (2) 18 S13D - PLACE 6-PORT TERMINAL (1) S07B - TERMINATE PAIRS (3) S50A - SPLICE FIBER (9) 19 S14B - PLACE 4-PORT RL SWITCH (1) 20 S14B - PLACE 4-PORT RL SWITCH (2) 2 lb S13D - PLACE 6-PORT TERMINAL (1) S07B - TERMINATE PAIRS (2) S50A - SPLICE FIBER (6) 22 S14B - PLACE 4-PORT RL SWITCH (2) 23 S13D - PLACE 6-PORT TERMINAL (1) S07B - TERMINATE PAIRS (2) S50A - SPLICE FIBER (4) 24 S14B - PLACE 4-PORT RL SWITCH (2) 20 S13D - PLACE 6-PORT TERMINAL (1) S07B - TERMINATE PAIRS (2) 26 S14B - PLACE 4-PORT RL SWITCH (2) W.O. DRIVER ❑ ETHERNET ❑ CIAC ❑ DAMAGE ® MDU CONSTRUCTION START 11 /10/2021 IN SERVICE DATE 2/8/2022 CONSTRUCTION ❑ FLAGGING ❑ BRUSHING ❑ CONTRACTOR PERMITS MUNICIPALITY: SNOHOMISH COUNTY ❑ BLANKET ® TCP/TRAFFIC ® DETAILED (NOT BLANKET) ❑ NO PERMIT REQUIRED RECEIVED OCT 29 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT ** CAUTION ** MULTIPLE VOLTAGE POWER CIRCUITS OVERHEAD 811 O � �A 0 O CALL BEFORE YOU DIG Ziplyfiber MILL PARK CONDOS-HLLKWAXX 7303 224TH ST SW, EDMONDS, WA PROJECT 5509363 C.O. AREA: 962 NUMBER: EXCH. CODE: 51419 DRAWN DATE: ENGR: M. HAKAHAN CNTY: SNOHOMISH 10/21/2021 PHONE: FILE: SCALE: 1:100 TAX DISTRICT: DWG 8 OF 9 TWNSHP: 27N RNG: 4E SEC: S29 TERMINAL 786602 7303 224TH ST SW, EDMONDS, WA S4018,23-24+ XD,3-6 SERVING: BUILDING M- M1, M2, M3, M4, M5, M6, M7, M8, M9, M10, M11, M12 TERMINAL 786606 7303 224TH ST SW, EDMONDS, WA S4018,14-15+ XD,3-6 SERVING: BUILDING J- J1, J2, J3, J4, J5, J6, J7, J8, J9, J10, J11, J12 TERMINAL 787203 7303 224TH ST SW, EDMONDS, WA S4018,1-2+ XD,3-6 SERVING: BUILDING G- G1, G2, G3, G4, G5, G6, G7, G8, G9, G10, GI I, G12 TERMINALS AND ASSOCIATED ADDRESSES TERMINAL 786603 7303 224TH ST SW, EDMONDS, WA S4018,12-13+ XD,3-6 SERVING: BUILDING B- B1, B2, B3, B4, B5, B6, B7, B8, B9, B10, B11, B12 TERMINAL 787002 7303 224TH ST SW, EDMONDS, WA S4018,10-11 + XD,3-6 SERVING: BUILDING A- Al, A2, A3, A4, A5, A6, A7, A8, A9, A10, A11, Al2 TERMINAL 786604 7303 224TH ST SW, EDMONDS, WA S4018,20-22+ XD,4-6 SERVING: BUILDING K- K1, K2, K3, K4, K5, K6, K7, K8, K9, K10, K11, K12 BUILDING L- L1, L2, L3, L4, L5, L6, L7, L8 TERMINAL 787003 7303 224TH ST SW, EDMONDS, WA S4018,7-9+ XD,4-6 SERVING: BUILDING C- Cl, C2, C3, C4, C5, C6, C7, C8, C9, C10, C11, C12 BUILDING D- D1, D2, D3, D4, D5, D6, D7, D8 TERMINAL 819302 7303 224TH ST SW, EDMONDS, WA S4018,19+ XD,2-6 SERVING: BUILDING H- H1, H2, H3, H4, H5, H6, H7, H8 TERMINAL 787004 7303 224TH ST SW, EDMONDS, WA S4018,5-6+ XD,3-6 SERVING: BUILDING E- E1, E2, E3, E4, E5, E6, E7, E8, E9, E10, E11, E12 TERMINAL 786605 7303 224TH ST SW, EDMONDS, WA S4018,16-18+ XD,5-6 SERVING: BUILDING P- P1, P2, P3, P4, P5, P6, P7, P8, P9, P10, P11, P12 POOL TERMINAL 787202 7303 224TH ST SW, EDMONDS, WA S4018,3-4+ XD,3-6 SERVING: BUILDING F- F1, F2, F3, F4, F5, F6, F7, F8, F9, F10, F11, F12 W.O. DRIVER ❑ ETHERNET ❑ CIAC ❑ DAMAGE ® MDU CONSTRUCTION START 11 /10/2021 IN SERVICE DATE 2/s/2022 CONSTRUCTION ❑ FLAGGING ❑ BRUSHING ❑ CONTRACTOR PERMITS MUNICIPALITY: SNOHOMISH COUNTY ❑ BLANKET ® TCP/TRAFFIC ® DETAILED (NOT BLANKET) ❑ NO PERMIT REQUIRED RECEIVED OCT 29 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT ** CAUTION ** MULTIPLE VOLTAGE POWER CIRCUITS OVERHEAD 811 O � �A 0 O CALL BEFORE YOU DIG Ziplyfiber MILL PARK CONDOS-HLLKWAXX 7303 224TH ST SW, EDMONDS, WA PROJECT 5509363 C.O. AREA: 962 NUMBER: EXCH. CODE: 51419 DRAWN DATE: ENGR: M. HAKAHAN CNTY: SNOHOMISH 10/21/2021 PHONE: FILE: SCALE: 1:100 TAX DISTRICT: DWG 9 OF 9 TWNSHP: 27N RNG: 4E SEC: S29 ME rattle 9 4? Taste Rice Noodles, Te:.mporarily closed IN ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) Tapioca Express Temporarily closed Wonton Noodle House Takeout 'TP+R Collision Mill Park Condominiums bldg_ E 7303 224th St SW, Edmonds, WA 98026 linic Edmonds WORK AREA 4? 224th St Sw 224th St SW 224th St SW w � CL n ai keo-. LL C C4 M1 T & T Seafood Restaurant Free Delivery n VICINITY MAP ow RECEIVED OCT 29 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT O ATCO COMMUNICATIONS SERVICES, LLC www.atcotelecom.com 360.563.9000 708 First Street Snohomish, WA 98290 WSTCS# 012911 zilyfiber p Everett, WA 98206 c�0 M p Z J 3 O O O � o a_ N O Z i� O 0 C/) Ld N � I M � W 0 O " LIJ I O N n r n � V / ry W 0 U o Z W W W o Q Z a a DATE: 10.27.2021 DESIGNED BY: M. LUNA ATCO CONTACT: 606.369.5721 marcus.luna@atcotelecom.com SCALE: SHEET: � OT TO 01 SCALE NO: 1 OF 2 SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM LEGEND: N ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, 1 O SIGNALIZED INTERSECTION MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. PHASE I APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY O ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN CONE (CANDLESTICK) SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) 14" ® TYPE III BARRICADE O ATCOCOMMUNICAiIONSSERVICES, lLC RECEIVED www.atcotelecom.com WORK TRUCK 360.563.9000 SIGN LEGEND: OCT 29 2021 708 First street WORK ZONE LIMITS Snohomish, WA 98290 WSTCS# 012911 OWE WARNING SIGN ROAD WORK DETAILS: CITY OF EDMONDS • (WHERE REQUIRED) WORK SHOULDER DEVELOPMENT Z I I f i b e r AHEAD WORK O SPLICE IN HH, THEN RISER UP POLE SERVICES DEPARTMENT p y DIRECTION OF TRAFFIC I #4 NOT PAVEMENT MARKINGS) Everett, WA 98208 2 ❑VERLASH APPR❑X, 60OFT OF NEW (AS N EDED) W20-1 W21-5 48CT FIBER TO FED AT POLE #1 RISER DOWN POLE #1 TO EXISTING 0 3 Z 3 30 C❑NDUIT WITH REST ❑F WORK ON ENGINEERING DIVISION PRIVATE PROPERTY "7TED o O a_ (n LO o Q o SPOTTER NEEDED FOR PEDESTRIAN `O ram) J o �l� Cn n TRAFFIC AND DRIVEWAY ACCESS, o — 12/18/2022 r\ Ld MAINTAIN TWO 11' Cn N TRAVEL LANES l~_ _J o 100'C14N O L0 1 2 224TH ST. SW � (25 MPH) 3 W20-1 N SIDEWALK I D/W SIDEWALK SIDEWALK zflut o � U W20-1 W21-5� — — — — — — — 100' 00 POLE— � I 4 I POLEp Applicant shall repair/replace all O damage toovemen utilCity rfrontage-of-w OWNER/CONTRACTOR IS RESPONSIBLE FOR o mprovements in City right-of-way per city standards that is caused or EROSION CONTROL AND DRAINAGE (� Fill o LL occurs during the permitted project. Z � O < lyj W20-1 Q W W F= Z CO I lrJ W20-1 0 o < a a DATE: 10.27.2021 NOTE: MON. - FRI. = 7:00am TO 4:00pm ATCO CONTACT: 606.369.5721 marcus.luna®atcotelecom.com SCALE: SHEET: = 40'-0" 0 2 NO: 2OF2 DESIGNED BY: M. LUNA FREEWAY &EXPRESSWAYS 55 / 70 MPH 1500' ± RURAL HIGHWAYS 60 / 65 MPH 800' ± RURAL ROADS 45 / 55 MPH 500' ± RURAL ROADS &URBAN ARTERIALS 35 / 40 MPH 350' ± RURAL ROADS &URBAN ARTERIALS 25 / 30 MPH 200' ± (2) RESIDENTIAL &BUSINESS DISTRICTS BUFFER AREA LONGITUDINAL BUFFER SPACE = B POSTED SPEED (MPH) 25 30 35 40 45 50 55 60 64 70 LENGTH (feet) 155 200 250 305 360 425 495 570 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R 9,900 TO 22,000 > 22,000 < 45 MPH 45 - 55 MPH > 55 MPH < 45 MPH 45 - 55 MPH > 55 MPH CHANNELIZATION DEVICE SPACING (feet) MPH TAPER TANGENT 50/70 40 80 35/45 30 60 25/30 20 40 MINIMUM SHOULDER TAPER LENGTH = L/3 (feet) SHOULDER POSTED SPEED (MPH) WIDTH (feet) 25 30 35 40 45 50 55 60 65 70 8 40 40 60 90 120 130 150 160 170 190 10 40 60 90 90 150 170 190 220 220 240 SIGN SPACING = X (1) URBAN STREETS 25 MPH OR LESS 100'± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS (2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.