ENG2022-0112 ROW PERMITOF WAY PERMIT
PERMIT NUMBER
City of Edmonds
EdmondsRIGHT
•:• • 1 1
www.cityofedmonds.gov• •
Description: GRE-RAISE BURIED SEWER MANHOLE LID IN PINE ST ISSUED: 03/29/2022
Address: 95 PINE ST EDMONDS WA 98020
EXPIRES: 09/29/2022
rmit Type: RIGHT OF WAY Permit Subtype: MIXED USE Parcel Number: 27032600102100
i
NAME TYPE NAME ADDRESS PHONE
APPLICANT WADE EDELBROCK 17350 TYE ST SE, MONROE WA 98272 (206)423-7074
CONTACT WAECO CONSTRUCTION 17350 TYE ST SE, MONROE WA 98272 (425)200-7352
CONTRACTOR WAECO CONSTRUCTION, LLC 17350 TYE ST SE, MONROE WA 98272 (360)794-7785
OWNER CITY OF EDMONDS 121 FIFTH AVE N, EDMONDS WA 98020
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT
$40.00 $40.00
RIGHT OF WAY STANDARD PERMIT FEE
$330.00 $330.00
1111
•
REQUIREMENT TYPE
NOTES
TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments
or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of
granting this permit.
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW
03/29/2022
RELEASED BY
DATE
Printed: Tuesday, March 29, 2022 12:56:37 PM 1 of 2
KIRRMF WAY PERMIT
City of Edmonds
•:• • 1 1
www.cityofedmonds. ov/425.771.0220
CONDITIONS
CONDITION TYPE
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
POTHOLING
VERIFY CLEAR BORE CROSSINGS.
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND AND NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT
COMPLETE
X-2 ENGINEERING FINAL**
A-1 JOB START
E-7 RESTOR LIMITS
E-7 SEWER MANHOLE
Printed: Tuesday, March 29, 2022 12:56:37 PM 2 of 2
of EL>Afc
RECEIVED
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
Requirements outlined in Right -of -Way permit Handout E63.
03/22/2022
ENGINEERING DIVISION
If any field is not applicable to your project, write "N/A" instead of leaving blank.
All fields required. Incomplete Applications will be denied.
SECTION A
Project Name P 1 r-A lF� ST M 4-1 tz D-X<,
Site Address or if no site address use Property Address at NW corner of project area: q S p l iZl F Sr
Associated Permits: IBLD PLN ENG
Name of Company
( =F cc NSI- 1_" l D Franchise Ordinance No:
Point of Contact
v I CTO r2, V 0
Title 17 ro 0 SIPCih fi Pr l - l /-.. . -f e •
Address Zw 0 1
W AA *�- 3U
City St?41ttl
I State V A
7-ip 0 I L,I
Phone t i%c�
JI0 _2, — -'
Email V V U
(4) 4 00 d MR r) Ke, YYI
Contractor and AuthorizedAgent of Owner
Name of Company , l kt5tx
Primary Name w I L-t' H-t V) _
Agent Name Y f A- e- IF-0 6 C/i�_
Title P 12 O J C (/F M M tJ fil G IPr
Title O "�_Aye_el
Mobile — '?_V— -7 Z
Address 1 T S
S e-
Email i I 100 �- l fl U yi • OVYi
City NAO I_ eD E
State VV
Zip 2;1
Secondary Name N
Phone 2—U& — y-Zf-", _• I V I LA
Title N AA
Email W/Lz" v UU \i rl i,i� ✓�S �i� �ir1 �i�
Mobile
A
City of Edmonds Business License No: (/5 2 lI
Email
State license No: t' rA . 5 L
Contractor verifies it is currently bonded
Contractor verifies it currently has general liability insurance
NOTE: ECDC i8.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
applyTYpe of I)evelopment — Check ALL that
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as weln
�p Traffic Control Only (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
❑ Utility Franchise Work (no associated development)
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
f0' V20 Vi D1 C-T Lt.1a-B A N CC— FV 10- Ma N R0 L- V —1�14� 10145- TV
NCr P V' 0 v c
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
0 LF
x
LF
SF
Alley 72 hours +
LF
x
LF
SF
Pa ing 72 hours +
LF
x
LF
U SF
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTIONC.
1. The work in the right of way is on or for the following type of facilities:
❑ telecommunications ❑ cable ❑ power ❑ as
❑ water
1( sewer
❑ storm
In
owner have existin overhead infrastructure in the area of work?
ment be added under round or above round (e.. edestals, vaultsetc.)?e:osed
733.7Doesthe
work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility system?
X
5.
Does the work involve Proposed additions to an aboveground utility system? If es:
Are the additions for the purpose of serving new commercial development?
Are the additions for the purpose of serving a single-family residential subdivision?
6. Does your project involve rebuilding or replacing
than one lot or commercial development?
equipment which currently serves more
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
X
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed:
Does your project involve wires/cables/lines? If yes:
6a.
How many are existing? How many are to be added?
6b.
Does your project involve poles? If yes:
How many poles are existing in the project area?
What is the height of the existing poles?
How manpoles are to be removed?
Are additional poles to be laced?
How many? I I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
x
How many? What is the height of the poles after?
Describe the modification/rebuild:
SECTION C
Traffic Control and Public Safety.'r►affic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authorityto bind the owner to this application.
Fees. The Applicant is responsible for all permit fe .
APPLICANT SIGNATURE: G�,DATE. 05 2-1
APPLICANT PRINTED NAME:
APPLICANT TITLE:
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
/� DATE TECH ENG
�/,i /���� ORIGINAL 3/18/22 HKB JJP WAECO ENGINEER JOSEPH PARKER 253.315.332E JPARKER@WAECOENG.COM 95 PINE ST,
\\JJ,\_' // REV #0 O
24 HOUR CONTACT VICTOR VO
206.883.7468
ENGINEERING REVIEWED ---- ---- ---- VVO@GOODMANROODMANRE.COM EDMONDS WA 98020
SIGN SPACING = X FEET
RURAL ROADS 45/55 MPH 500'±
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350'±
RURAL ROADS & URBAN ARTERIALS 25/30 MPH 2O0±
RESIDENTIAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100'±
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE
INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND
DRIVEWAYS
(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO
FIT ROADWAY CONDITIONS
AS -BUILT ---- ---- ----
BUFFER DATA CHANNELIZATION DEVICE SPACING (FEET)
LONGITUDINAL BUFFER SPACE = B MPH TAPER TANGENT
SPEED (MPH) 125 1 30 1 35 140 145 1 50 55 160 165 50 40 80
ENGTH(FEET) 115512001250130513601425149515701645 35/45 30 60
LANE
MINIMUM TAPER LENGTH = L (FEET)
WIDTH
POSTED SPEED (MPH)
(FEET)
25
30
35
40
45
50
10
105
150
205
270
450
500
11
115
165
225
295
495
550
12
125
180
245
320
540
600
W0011YV&3d0N1G71n9AYV HonMJH1 SNOT
NOTES:
1. ALL SIGNS ARE 36" - 36" ACROSS
2. ASTERISK DENOTES X, L, OR B DISTANCES ARE NOT TO SCALE
3. CONTRACTOR SHALL ALWAYS PROVIDE ACCESS TO DRIVEWAYS
4. STANDARD D�Up.I"AL EU pAAMHAl 5. FLAGGERS -1
51
6. IF ONLY # �N � y�q 111 RMES ,
7. SIDEWALKS AP EITHER OPEN OR NOT OPEN. A��§ibuEWALK ISAArr--
8. NO PARK SIGNS ARE TO BNJ �i 2PUIR '�510H A
PRO PRtETA "r2!NOTTOR"�TRI8
9dS -IV
25/30 20 40
PINE ST
11NW 3d 31`d2J3d3S V ajin032J Am S31111 in
AN`d Ol NOISIABWNOUVOO132J 'S3111mn 311S NO 11V
ONUVOO1 2J0d 3181SNOdS32J 2t]=d:UNOORJ3NMO
DOVNIV/ 10 4NV102J1NOO NOISOJ3
2J0d 3181SNOdS32J SI 2JOlOb2J1NOORJ3NMO
�REQU R�"A IGNALCCOU D BE COUNTERMANDED LUDING "MOTORCYCLIST" N
awl qK:)Uqa�,jaT f I�LAGGERS ARE USED, IN WHICH CASE THE LANE CAN BE A MINIMUM OF 10'
Up 4' PATH CAN OT BE MAINTAINED MEASURED FROM PROPERTY LINE, OR 5.5' IF CREATED FROM FACE OF CURB
auel IaAeaj auO
EM12LUMMI1112MOAlAECO ENGINEERING
�
NSTRUCTION PROJECT NUMBER: 052I�a 313Vd30
SITEPLAN.DWG SAdO43 -
00#MRG 21.0__u
S SauOje llili 77n7 1 7 IPIAI
}oefoid papLujad ay; 6uunp sinoo,
ao pasneo sl;ey} spiepue}s Apo aa(
AeM-;O-Iy61a Aj!o ul SjU9W9noadwi
abe}uoa} ao sal;Illln o; abewep
Ile eoeldaippiclaa pegs }ueollddV
ERMIT NUMBER- ----
N SITE PLAN
0 0 o TRAFFIC CONES ' ' -
b
ISIAId ONIb33NIJN3
WORK VEHICLE
WORK AREA
SCALE: 1"-40'
TRAFFIC CONTROL PLAN
HOURS OF TCP: 9AM-3PM
DESCRIPTION: MANHOLE RAISE
FLAGGING STATION
SHEET # I 1 OF 1
n q A I q'l'4)4
DATE TECH ENG
�\y/�,�/�/ //��\ ORIGINAL 3/18/22 HKB JJP WAECOENGINEER JOSEPHPARKER 253.315.3326 95 PINE ST
VVUVu�CdREV ---- ---- ---- JPARKER@WA.7468 .COM TRAFFIC CONTROL PLAN
24 HOUR CONTACT VICTOR VO EDMONDS WA 98020
ENGINEERING REVIEWED ---- ---- ---- VVO@GOODMANROODMANRE.COM
AS_Rllll T ---- ---- ---_
SIGN SPACING = X (F
RURAL ROADS 45/55 MPH 500':
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350':
RURAL ROADS & URBAN ARTERIALS 25/30 MPH 2O0:
RESIDENTIAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100'±
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE
INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND
DRIVEWAYS
(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO
FIT ROADWAY CONDITIONS
I LONGITUDINAL BUFFER SPACE = B
SPEED (MPH) 52-5-F-30-T-3-5T 40 1 45 1 50 55 1 60 1 65
LANE
MINIMUM TAPER LENGTH = L (FEET)
WIDTH
POSTED SPEED (MPH)
(FEET)
25
30
1 35
1 40
1 45
1 50
10
105
150
205
270
450
500
11
115
165
225
295
495
550
12
1 125
180
245
320
540
600
19
CHANNELIZATION DEVICE SPACING (FEE
MPH
TAPER
TANGENT
50
40
80
35/45
30
60
25/30
20
40
00 0
00 ,
00
—. opo®®oo010000ccce000
po®® mw°ucK ® O
O
I Z_
<9>
ONE LANEROAD AHEAD
W20-1 W20-4 W20-7a
NOTES:
1. ALL SIGNS ARE 36" - 36" ACROSS
2. ASTERISK DENOTES X, L, OR B DISTANCES ARE NOT TO SCALE
3. CONTRACTOR SHALL ALWAYS PROVIDE ACCESS TO DRIVEWAYS
4. STANDARD ADVANCE WARNING SIGNS SHALL BE USED FOR PLATES OR ROUGH ROAD DURING AFTER-HOURS, INCLUDING "MOTORCYCLIST" SIGN
5. FLAGGERS SHALL BE USED IN ACCORDANCE WITH WAC 468-95-302. UPO WILL BE REQUIRED IF A TRAFFIC SIGNAL COULD BE COUNTERMANDED
6. IF ONLY ONE LANE IS OPEN IN A DIRECTION, THAT LANE SHALL BE A MINIMUM OF 1 V WIDE, UNLESS SPOTTER/FLAGGERS ARE USED, IN WHICH CASE THE LANE CAN BE A MINIMUM OF 10,
7. SIDEWALKS ARE EITHER OPEN OR NOT OPEN. A SIDEWALK IS CLOSED IF A MINIMUM 4' PATH CANNOT BE MAINTAINED MEASURED FROM PROPERTY LINE, OR 5.5' IF CREATED FROM FACE OF CURB
8. NO PARK SIGNS ARE TO BE PUT UP 72 HOURS PRIOR TO CONSTRUCTION
TRAFFIC CONTROL PLAN
HOURS OF TCP: 9AM-3PM
DESCRIPTION: XXXXXX
<i>
<8>
ROADWORK AHEAD
W20-7a W20-4 W20-1
PINE ST
tl�lbN WM�AA`d
NCI S IA I GI-00I6IIA MQINflON
ICI I I TR CK I WORK VEHICLE
WORK AREA
LEGEND
N
N
111111IF_Te cilloq 10lr_110910
ROPRIETARY - NOT FOR DISTRIBUTION
PROJECT NUMBER: 0
ERMIT NUMBER- ----
a;Ini;ln;IN
SCALE: 1 "=40'
SHEET # I 1 OF 1
RECEIVED
Mar 21 2022
\ CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
CITY OF EDMONDS
Right -of -Way Application #1110071 - MH Raise
MyBuildingPermit.com
Applicant
First Name Last Name Company Name
Wade Edelbrock WAECO CONSTRUCTION
Number Street Apartment or Suite Number E-mail Address
17350 Tye St SE melissa@waecoconstruction.com
City State Zip Phone Number Extension
Monroe WA 98272 (206)423-7074
Contractor
Company Name
WAECO CONSTRUCTION LLC
Number Street Apartment or Suite Number
17350 Tye St
City State Zip Phone Number Extension
MONROE WA 982721147 2064237074
State License Number License Expiration Date UBI # E-mail Address
WAECOCL93OLF 6/28/2023 Rn971 qngq wade@waecoconstruction.com
Project Location
Number Street Floor Number Suite or Room Number
City Zip Code County Parcel Number
Associated Building Permit Number Tenant Name
Additional Information (i.e. equipment location or special instructions)_
Work Location
Corner of Pine St and Utlity
Property Owner
First Name Last Name or Company Name
Number Street Apartment or Suite Number
City State Zip
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 3/18/2022 Submitted By: Wade Edelbrock
Page 1 of 2
i
CITY OF EDMONDS MyBuildingPermit.com
Right -of -Way Application #1110071 - MH Raise
Project Contact
Company Name: WAECO CONSTRUCTION
Name: Will Hennesey Email: will@waecoconstruction.com
Address: 17350 Tye St SE Phone #: 4252007352
Monroe WA 98272
Project Type Activity Type
Mixed Use Modification
Scope of Work
Excavation and Utility Work
Project Name: MH Raise
Description of Work: Manhole was paved over on Pine St and we are exposing it and raising to meet
grade
Project Details
Tree Removal
There are no significant trees being removed
Page 2 of 2