ENG COMPACTION REPORTEarth
'Solution
NWi«
Earth Solutions NW, LLC
LETTER OF TRANSMITTAL
To: Select Homes Inc.
16531 — 13th Ave W, A107
Lynnwood, WA 98037
Attn: Mr. Gary Klick
Email: gary@selecthomeswa.com
No. of
Date: March 31, 2021
ESNW No.: 6999.03
Project: 82°d Single Family Residences
Copies Date Description
1 3/26/21 Daily Field Report(s) # 3
Comments:
CC:
1:
ATTN:
2:
ATTN:
3:
ATTN:
4:
ATTN:
5:
ATTN:
Transmitted By: Earth Solutions NW, LLC
PM: Henry Wright, P.E.
15365 NE 901h Street, Suite 100 Redmond, WA 98052
(425) 449-4704 FAX (425) 449-4711
Earth Solutions NWLLC
ESNW Rep.
Project No.
Page
Report No.
GFB
6999.03
1 of 1
3
15365 NE Street, Suite 100
Time On Site
Time Off Site
Date
Da of Week
Y
Redmond,n WA 98052
V
Main (425) 449-4704 1 Fax (425) 449-4711
10:25
10:40
3/26/21
Mon
www.esnw.com
Travel Time
Weather
DAILY FIELD REPORT
.75 hr
Cloudy, 40°F
Project Name
Job Location
Client/Owner
82nd Single —
Family Residences
21328 — 82nd PI.
W, Edmonds
Select Homes, Inc.
Contractor #1
Contact
Field Supervisor
Reviewed
LAC
Contractor #2
Contact
Project Manager
HTW
Reviewed
9Y/ (- )
Are approved plans/permits on site? Yes Project No. Permit No.
As requested by the client, ESNW rep. was onsite to observe the R-tank excavation.
R-tank observations:
Upon arrival ESNW rep. observed contractor has finished excavating the area where the R-tank will be installed
and has placed crushed rock over the SG to serve as a base for the R-tank. ESNW rep. also observed the
contractor preparing to place the R-tank boxes and filter fabric in accordance with the plans. ESNW rep. used a
'/2" steel T-probe to examine the excavation subgrade and observed dense and unyielding conditions throughout
the SG, considered suitable for support of the R-tank.
ESNW rep. will return as requested.
Greg Buzitis
ESNW Senior Field Technician
(206) 488-4151