Loading...
ENG2022-0096 ROW PERMITRIGHT OF WAY EUC PERMIT PERMIT NUMBER City of Edmonds -0096 www.cityofedmonds.gov• • Description: PUD TO REPLACE 2 BO POLES ISSUED: 04/12/2022 Address: 1450 OLYMPIC VIEW DR EDMONDS WA 98020-2690 EXPIRES: 10/12/2022 rmit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00531904600100 i NAME TYPE NAME ADDRESS PHONE APPLICANT MOE NAVE PO BOX 1107, EVERETT WA 98206 (425)783-5681 CONTACT SNOHOMISH COUNTY PUD PO BOX 1107, EVERETT WA 98206 (425)783-8559 CONTRACTOR SNOHOMISH COUNTY PUD P.O. BOX 1107, EVERETT WA 98206 (425)670-3216 OWNER GREGG & FRAZIER ALIX ORTEGA 12421 123RD AVE NE, LAKE STEVENS WA 98258 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 ENGINEERING INSPECTION FEE $110.00 $110.00 RIGHT OF WAY STANDARD - EUC PERMIT FEE $330.00 $330.00 • REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW 04/12/2022 RELEASED BY DATE Printed: Tuesday, April 12, 2022 8:00:18 AM 1 of 2 -KRWOF WAY EUC PERMIT PERMITNUMBER, City of Edmonds 19 www.cityofedmonds. ov/425.771.0220 CONDITIONS CONDITION TYPE ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND AND NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE A-1 JOB START E-7 TRAFFIC CTRL X-2 ENGINEERING FINAL** Printed: Tuesday, April 12, 2022 8:00:18 AM 2 of 2 RECEIVED Of _' Xto RIGHT OF WAY CONSTRUCTION L —:a MAR 8 2022 PERMIT APPLICATION CITY OF EDMONDS Complete and submit this Application in accordance with the Submittal DEVELOPMENT INC. IS90 Requirements outlined in Right -of -Way permit Handout E6�. SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. SECTION A General Info Project Name � A p 0 Q_ c -Pe (c l e �KCQ «� � / IQ C_, 40 Site Address or if no site address use Property Address at NW corner of project area: (�\ r,119 1 Associated Permits: BLD PLN —� ``pi e �sq-.nL-cn&, E G • pp Name of Company Franchise Ordinance No: i L c.k J ,' o ; �,�,,, r0 Point of Contact Title -2 Address PO Z City 9 State L� Zip 2 u Phone 2 9 - k5TeR Email x l /\.)CtM AuthorizedContractor and Name of Company Agent of • During Construction Primary Name Agent Name Title Title S Mobile < u- 235 - Z /o Address FLU � Email i 5-11-lo '46 City State �� Zip p ( Secondary Name Phone 2 _ Z Title Email elS r l rp , u Mobile City of Edmonds Business License No: Email State License No: 3 I S— ? cl Contractor verifies it is currently bonded d Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o. 020 requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. p• of Development ❑ Multifamily residential ❑ Commercial ❑ City project • Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as well) Traffic Control Only (no associated development) (�f'Utility Franchise Work (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + 2 LF x S LF crJ SF s Alley 72 hours + LF x LF SF Parking 72 hours + LF x LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. Type of 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications ❑ cable )power ❑ gas ❑ water ❑ sewer ❑ storm Details of • to be Completed Does the utility owner have existing overhead infrastructure in the area of work? Yes No 1.7 2. Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)? X If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility stem? 5. Does the work involve proposed additions to an aboveground utility system? If es: Are the additions for the purpose of serving new commercial development? X Are the additions for the purpose of sei-ving a single-family residential subdivision? Details of Work to be CompletedNo Does your project involve rebuilding or replacing utility equipment which currently serves more 6. than one lot or commercial development? \ / If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: X How many are existing? 1 9 1 How many are to be added? T 0 City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 6b. Does your project involve poles? If yes: x How many poles are existing in the project area? 'a ` What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? What is the height of the additionalpoles? 6c. Are any poles to be mo ified/rebuilt/replaced? If yes: How many? What is the height of the poles after? Describe the modification rebuild: X.J<.Aw- SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable -city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: APPLICANT PRINTED NAME: APPLICANT TITLE: NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 Ino 1 pMErnom ISH COUNTYZ,LOIlm, 111 LYNNWOODAREA POLE NO. 156 &159 SE1/4S 13 T 27 R 03&159 SE1/4S 13 T 27 R 03 DATE 03/05/22 ORDER 100092624 REASON FOR WORK REPLACE BAD ORDER POLES ENGINEER A. RIFE OPERATION 0030 FOR PUD PRI-5 DRAFTER u.G. No. scALE 1" =100' APPROVED & DATE PRINTED DATE WORK COMPLETED FOREMAN FEES REQ'D OYES ONO PRIMARY OVERHEAD O RESIDENTIAL O COMMERCIAL LEO NO. 'as '•s SECONDARY OVERHEAD NESC VIOLATIONS BASIC FEE f O NO O YES (SEE NOTES) 'Qs '.s PERMITS (DATE GRANTED) METER/CONV. POLE f O TREE TRIM PRIMARY UNDERGROUND O STATE O RESIDENTIAL O COUNTY O COMMERCIAL ■ CITY EDMONDS BASIC FEE f O LEU NO. EASEMENTS 'Qs 'ms O REQUIRED O NOT REOUIRED SECONDARY UNDERGROUND BASIC FEE f 'as '.f DATE RELEASED UNDERGROUND PLAT FOREIGN CONTACTS BASIC FEE f O JPN§ - 100092624 gFT.GS '.f OJOINT TRENCH ZIPLY & CATV STREET LIGHTING OJOINT BORE ZIPLY & CATV FT.@$ '•s O POLE STENCILING WORK IN RIGHT OF WAY FROM TO ❑ PRIMARY TAKE OFF POLE O SECONDARY q FT.GS '.s PRE-CONST. REQUIRMENTS MISCELLANEOUS FEES OTREE TRIM OPUD LOCATOR O BACKHOE O FLAGGING VAULT f O ONE CALL DATE PERMIT f No. f STREET LIGHTING f O YES O NO f M&R AS -BUILT f GIs TOTAL DUE f DATE PAID CIS OC M&R RECEIPT NO. GIS Ph JOINT USE SERVICE ORDER ND. LOCATION MAP PAGE 454H-4 11:fd:VT1b_T O EXISTING POLE 3K EXISTING POLE -TO BE REMOVED • NEW POLE )1( NEW POLE TO REPLACE EXISTING POLE DATE SUBSTATION MPL CIRCUIT NO. 12-345 PHASE 123 LOC A-PLI-159 SET 45FT POLE T.N.OF EXISTING POLE SET POLE 6.5FT DEEP FRAME POLE PER CS-12F303,12F601.12V115, AND 1U705 TRANSFER PRI/NEUT CONDUCTORS (3)*4CU SO PRI & (1)*4CU SO NEUT TRANSFER OVHD SEC SVC'S INSTALL NEW 3/8"DOWNGUY AND ANCHOR 12" SINGLE HELIX ANCHOR W/L-8FT TO E. VEG WROK REQUIRED FOR NEW ANCHOR INSTALL TRANSFER EXISTING XFMR 25-20234 SER* TRANSFER SL-130255 BUILD NEW 3" SEC RISER PER CS-1U705 FROM XFMR 25-20234 INSTALL 90FT OF 350 TRIPLEX TO PED AT LOC C. STRIP 01:13 PE)tE AND ABANBON TO COMM LOC B PLI-156 ENGR'S TEL. • 425-783-8559 ENGR'S CELL • IF425-78,3-855911 SET 45FT POLE T.S. OF EXISTING POLE SET POLE 6.5FT DEEP FRAME POLE PER CS-12F303 AND 12F601 TRANSFER (3)*4CU SOL PRI AND (1)*4CU SOL NEUT CONDUCTORS SLEEVE *4CU THROUGH.NO NEED FOR DD DEADEND N TRANSFER 1PH LATERAL TO WEST. HANG LCBU AND REFUSE LATERAL AT 65AMPS TRANSFER OVHD SEC SVVS RMV XFMR 37.5-3078 SER* INSTALL XFMR BAG AND CAUTION TAG ON XFMR MARK SUSPECT PCB'S ON CAUTION TAG STRIP POLE Q� I� yQl Q 02i3 HANG A 1PH7.�A n��lb/24�%�OV2�3NM0 UTC* ZK54d AiVaAd3S v AainioAa kvA sdnniin AN`d ilS NO �_IV - PUD TO ENFORCE POLE SE@MIlb'OO-i 2jOd 3­181SNOdS32J 2:]OlOVJiNOO/2]3NMO ATTACHMENT AGREEMENT. SEC V - PUD IS RESPONSIBLE FOR ENSURING THAT THE OLD FUSE XFMR AT 10AMPS zoz/so/to }oafoad pa}}luaaad ay} bump sanoo POLES IS REMOVED. ao pasneo sl }ey} spiepue}s �(}l0 1 1 Aem-;o-}u6u A}lO ul s}uaW@A 3n b 96e}uoa; ao sal}III}n o} 96e NOISI 4 dNI 3N P Ile aoeldaa/aledaa lleys }ueol d 1 RMV 37 W/PCB'S FU 1 2 (3)*4CU SOL PRI (1)*4CU SOL NEUT 3 1 FU65 MPL 12-343 BEFORE MPL 12-343 AFTER SCHEMATIC NTS (3)*4CU SOL PRI 1 (1)*4CU SOL NEUT 2 3 RECEIVED MAR 8 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT \1�49 56 1512 VC ` 160 2 34078 �/O p 8-18-18 02 9v 1 }2 FU65 1450 P 2 11 1439 A �� 3 2 25-20234 P S-130255-A �G c' 19 432 18 >_ 97 7 1440 J O SHEET OF ' 13HOS WORK IN TRAVEL LANE (MAINTAINING TWO-WAY TRAFFIC, 35 MPH OR LESS) W20-1 ROAD WORK AHEAD X ROAD OR NARROWS x NE W1-4R N J L LI U J O I- O LiJ ,W O V) O O O 00 O CC) 00 -O O O O 10F�0 0 0 AIN 0 MIN 0 O O O O O O O O ol o TRAFFIC CONTROL INSPECTION REQUIRED WHENEVER WORK ZONE IS SET UP ON OLYMPIC VIEW DR. mi N J X sOW20-1 W1-4L x i RECEIVED MAR 8 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT RECEIVED CITY OF EDMONDS Right -of -Way Application #1103776 - 100092624 MyBuildingPennit.Ma R $ 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Applicant First Name Last Name Company Name Moe Nave Snohomish County PUD Number Street Apartment or Suite Number E-mail Address PO Box 1107 jointuse@snopud.com City State Zip Phone Number Extension Everett WA 98206 4257835681 Contractor Company Name Owner Number Street Apartment or Suite Number City State Zip Phone Number Extension State License Number License Expiration Date UBI # E-mail Address Project Location Number Street Floor Number Suite or Room Number 1450 OLYMPIC VIEW DR City Zip Code County Parcel Number EDMONDS 98020 00531904600100 Associated Building Permit Number Tenant Name Additional Information (i.e. equipment location or special instructions)_ Work Location Property Owner First Name Last Name or Company Name Gregg & Frazier Alix J Ortega Number Street Apartment or Suite Number 12421 123RD AVE NE City State Zip LAKE STEVENS WA 98258 Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work requires a licensed contractor to perform the work, the information will be provided prior to permit issuance. Date Submitted: 3/8/2022 Submitted By: Moe Nave Page 1 of 2 CITY OF EDMONDS MyBuildingPermit.com Right -of -Way Application #1103776 - 100092624 Project Contact Company Name: Snohomish County PUD Name: Andrew Rife Email: asrife@snopud.com Address: PO BOX 1107 Phone #: 425-783-8559 Everett WA 98206 Project Type Activity Type Scope of Work Utility Purveyor Utility Work No Disturbance of Surface Project Name: 100092624 Description of Work: PUD will be replacing a bad order pole. Please include tree trimming. Project Details Project Information Job Number 100092624 Page 2 of 2