ENG2022-0107 ROW PERMITOF WAY EUC PERMIT
PERMIT NUMBER
City of Edmonds
AveRIGHT
••• • 1 1 1
www.cityofedmonds.gov• •
Description: PUD-REPLACE BO POLE ISSUED: 04/12/2022
Address: 17315 72ND AVE W EDMONDS WA 98026-5103
EXPIRES: 10/12/2022
rmit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00513100013801
i
NAME TYPE NAME ADDRESS PHONE
APPLICANT MOE NAVE PO BOX 1107, EVERETT WA 98206 (425)783-5681
CONTACT SNOHOMISH CO PUD 1802 75TH ST SW, EVERETT WA 98203 (425)239-8210
CONTRACTOR SNOHOMISH COUNTY PUD P.O. BOX 1107, EVERETT WA 98206 (425)670-3216
OWNER DONALD RICHARD TTEE WALKER 17315 72ND AVE W, EDMONDS WA 98026-5103
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT
$40.00 $40.00
RIGHT OF WAY STANDARD - EUC PERMIT FEE
$330.00 $330.00
1111
•
REQUIREMENT TYPE
NOTES
TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments
or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of
granting this permit.
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW
04/12/2022
RELEASED BY
DATE
Printed: Tuesday, April 12, 2022 2:03:10 PM 1 of 2
-KRWOF WAY EUC PERMIT
PERMIT NUMBER
City of Edmonds
121 5th Ave N, Edmonds ...• • 1 1
www.cityofedmonds. ov/425.771.0220
CONDITIONS
CONDITION TYPE
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
POTHOLING
VERIFY CLEAR BORE CROSSINGS.
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND AND NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE DATE
RESULT
COMPLETE
A-1 JOB START
X-2 ENGINEERING FINAL**
Printed: Tuesday, April 12, 2022 2:03:10 PM 2 of 2
of ED/q()
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
�Ne. 1390 Requirements outlined in Right -of -Way permit Handout E6,�.
If any field is not applicable to your project, write "NJAV, ,#)#=A,f Jf*ving blank.
All fields required. Incomplete Applications wiWlcd(dell.
ZZOZ L � JeA
SEMONA a3AI333H
General •
Project Name d /C.LQ(- �b Lo
Site Address or if no site address use Property Address at NW corner of project area: 2�V pe w
Associated Permits: BLD PLN ENG
'YCJ l cv,�S`i'e_cnr�
Entity Holdingapplicable)
-Ownerand
Name of Company J , "a
CuFranchise Ordinance No: N/A
Point of Contact V o Z;=U
Title S 2 a S
Address fro '7 rr( S'r
S IN
City V t�
State (,u Zip 2U 3
Phone L 2- 7 9 3 ' 0 SS'
Email e
Contractor and Authorized Agent of Owner (see note below)
Name of Company ��/ Cuc2�
Contractor Contacts During Construction
Primary Name
Agent Name A4
Title
Title ., eel
Mobile L _
Address 'Z C t �w �� ��
Email LPS f f� C C
City R State Zip z�
Secondary Name
Phone ZS_ 76 ? _ gTsq
Title
Email ` r �{, % ,Vv Nei
Mobile
City of Edmonds BusinessLicenseNo:
Email
State License No: , /_? — 00-5'— =i
Contractor verifies it is currently bonded
i Contractor verifies it currently has general liability insurance
NOTE: ECDC18.6o.020 requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as well)
Xtraffic Control Only (no associated development)
Atility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
�• �JIYJ Cre- 1 r-e- t:� (a La � j) 13A✓� o(&_e^ �/ �vt.-v)G..� Po w
z_ U CAe- -0 Lk .�_( 22 �-��/� 4 C� a 4 1`1U fntts 1 A• �1Ur j-1��� 4, 1 mow.
-
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
xJ
F
SF
<�)
Alley 72 hours +
LF
x
LF
SF
Parking 72 hours + I
LF
xJ
LF
SF
t�
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
Type of
7. The work in the right of way is on or for the following type of facilities:
❑ telecommunications ❑ cable empower ❑ gas
❑ water ❑ sewer ❑ storm
Details of Work to be Completed
Yes
No
i.
I Does the utility owner have existing overhead infrastructure in the area of work?
2.
1 Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)?
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility stem?
\ l
J�
5.
Does the work involve proposed additions to an aboveground utility system? If es:
Are the additions for the purpose of serving new commercial development?
Are the additions for the purpose of serving a single-family residential subdivision?
I Details
of Work to be Completed
I Yes
No
6.
Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
L1
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
How many are existing? How many are to be added? L>
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
Does your project involve poles? If yes:
How many poles are existing in the project area? 1
What is the height of the existing poles?
How many poles are to be removed?
Are additional poles to be laced?
How many? What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
How many? I I I What is the height of the poles after?
Describe the modification rebuild: It. Is, A l aiv 7,
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved.material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE:
APPLICANT PRINTED NAME:
APPLICANT TITLE:
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
N
I \`V `I V `V
KAl it 17 7n77
7 SERVICES APPROVED AS NOTED
30 133HS DEVELOPMENT �"' EDEPARTMENTVI
/2
USSO-3
Applicant shaUx€.paix/r€plac�-- u---------- ____
damage to utilities or fronts
improvements in City
per city stand ds that is caused o ; Ol Ol
occurs during the, mitted rojectQ' �� d-66Tt 1S
0 � if
C 9I 9££L
I£Li b
WNER/C TOR 1 NSIBLE FOR Z
EROSION COLD GE
LOl O NER/CWTgtA IRESP IBLE FOR
ALL N SITE UTILIT S. RELO ATI
UTILITIES MAY RE bIRE P SEPERAT l
£0£Li
d- b8Zi-1S
i
TING
SIN
OliVh3HOS
- PUD TO ENFORCE POLE ATTACHMENT
AGREEMENT.
- PUD IS RESPONSIBLE FOR ENSURING THAT THE
OLD POLES IS REMOVED.
a38=38 X80M 3381:310N
SdVW 01. IV NY4JX 3Sn3
A 03S
#83S
-S*L2 #oin
0OZL/0t1Z/0ZL 8W3X VAX9*L£ Hdl V ONVH
DVI NOIInVO NO S,80d 103dsns mvv4
WUX NO OVl NOIInVO aw 0V8 HV4JX 11VISNI
#83S 8999-5'L£ 8hJX AW2i
S,OAS 03S aHAO 833SNVNI
bSOVZ# S801OnaNOO In3N/18d 633SNV8i
L093ZL (INV LOZ3Zl-SO 83d 310d 3WVHJ
d330 135'9 310d 13S
310d ONIISIX3 30 'S'I 310d 135V 13S
:S310N W iona1SN00
;
In3N 8SOVZ#(0
18d ?JSOVZ#(Z)
I
Z6-Zl A23d
Z l
OIZ8-65�Z it
• �-133 S.8DN3
6999-£8L-5Zi7
. '131 S.NDN3
'L 3SVHd --Z6'ON llnow
AHd N011vlssns
C;GOZ/91,/C 31V0
310d ONIISIX3 33Vld]IN 01 310d M3N X
310d M3N •
03AOV438 38 01-310d ONIISIX3
310d ONIISIX3 0
=aN303-1
1—U99TT-39Vd dvw NOILY301
'ON 83090 MIAM3S
3Sn 1NIOr
ud SID
'ON 1d13338
M9w
30 SIJ
OIVd 31Va
s 3n0 'V101
Slo
s
liln8-S1l
sin
s
ON ■ S3A O
s
9NUH911 13381S
s
.ON
s llwa3d
31V0 IIVO 3NO ■
S 1INA
JNIJJVl3 ■ 30HH3Ve 0
S333 Sn03Nd1130S1w
wwool and 0 wlal 33a113
S1NW48=38'1SN00-38d
AMVON033S 0
310d 330 3NY►1
AMVwlad o
01 woa3
JIVM 30 1H9121 H2lOM
NI
DNIIIDN31S 310d
SM. so'13 3
o
9NI1HDI 113381S
A1V3 4 A1dlZ 3808 1NIOr 0
A1V3 '1 AldlZ HON381 1NIOr 0
Ste' ><013 D
s 333 31SV8
` *N�, �
1V ld ONn02i9213ONn
S10V1NO3 N013803
03SV313M 31V0
0381111038 LON ■ 038In03a 0
S1N3W3SV3
0
SuRown A113 ■
A1Nn03 0
31v1S 0
AWL 33810
(031W89 31VO) SlIW83d
(S310N 33S) S3A 0 ON ■
SN011VIOIA 3S3N
s 333 OISVB
aNno89830Nn A8VON033S
'ON nil
s 333 31SV8
Wlo83wwoo 0
IYILN30IS38 0
0Nno89830Nn AM1118d
s 310d 'AN03/83AN
sm. sv,
s 333 31SV8
Od3Ha3AO A8VON033S
'ON 031
IVI3831111"03 0
WI1N3OIS38 0
GV311-1183AO AM111Iad
ON. S3A0 0,038 S33J
WOWS
0313ldw0o WJOM 31VO
031NIdd 31VO 'F-03AOa
l - „l 3')V3S
dV
'ON '3'n 8313Vaa t — Nd and
05�00 N0I1YS3d0 331H V a33NION3 N 3 310d 830HO OV 3Z)V1d3W)1vO1A 803 NOSV38
830ao / 1/ 31V0 1708 L I SOSWIMS Z/L17 'ON 310d
V38VOOOMNNAI M 3" 0 ZL 9LCLL No11V3o1
A1Nn03 NSI140HONS 30 I'ON 13181S10 A11111n 3118nd
SCHEDULE ALL INT10
S THI
1N3W1NVd3a
LANE CLOSURE ON AS39)MtA1`IE ROAD
(TWO FLAGGER Oego6TAPWA
W20-1 WOA
D
1333H
AHEAD XF I
ONE LANE
W20-4 ROAD
AHEAD
X
W20-7A
X
Za
5m
00
N rM
X
G2 0 — 2 1 ROAD WORK E
48" x 24"
(OPTIONAL)
0
0
0
48" x 24"
G20-2
ROAD WORK
X (OPTIONAL)
0
0
IJ.
N
Mx
LLJ
Lc)o
X
ST W20-7A
X
ONE LANE
= ROAD W20-4
AHEAD
X
ROAD
= WORK W20-1
AHEAD
W20-7B
BE
PREPARED
TO STDP
OPTIONAL IF
40 MPH OR LESS
ZZOZ/LO/b0
GDi0N S`d G3IAMJdd`d
NOISIAIG ONI J33NIJN3
RECEIVED
Mar 17 2022
CITY OF EDMONDS CITY OF EDMONDS MyBuildingPermit.com
DEVELOPMENT SERVICES
DEPARTMENT
Right -of -Way Application #1109274 - WO 100092602
Applicant
First Name Last Name Company Name
Moe Nave Snohomish County PUD
Number Street Apartment or Suite Number E-mail Address
PO Box 1107 jointuse@snopud.com
City State Zip Phone Number Extension
Everett WA 98206 4257835681
Contractor
Company Name
Owner
Number Street Apartment or Suite Number
City State Zip Phone Number Extension
State License Number License Expiration Date UBI # E-mail Address
Project Location
Number Street Floor Number Suite or Room Number
17315 72ND AVE W
City Zip Code County Parcel Number
EDMONDS 98026 00513100013801
Associated Building Permit Number Tenant Name
Additional Information (i.e. equipment location or special instructions)_
Work Location
Property Owner
First Name Last Name or Company Name
Donald Richard Ttee Walker
Number Street Apartment or Suite Number
17315 72ND AVE W
City State Zip
EDMONDS WA 98026-5103
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 3/17/2022 Submitted By: Moe Nave
Page 1 of 2
CITY OF EDMONDS MyBuildingPermit.com
Right -of -Way Application #1109274 - WO 100092602
Project Contact
Company Name: Snohomish Co PUD
Name: Andrew Rife Email: ASRife@SNOPUD.com
Address: 1802 75th St SW Phone #: 4252398210
EVERETT WA 98203
Project Type Activity Type Scope of Work
Utility Purveyor Utility Work Disturbance of Surface
Project Name: WO 100092602
Description of Work: Replace bad order pole
Project Details
Project Information
Job Number
100092602
Page 2 of 2