Loading...
Building Permit 2020ERCIAL ■ LDG Permit PERMIT NUM City of Edmonds -. •. • • Type: COMMERCIAL BLDG Owner/ Business: BANK OF AMERICA-HUI MAIN STREET LLC Status: ISSUED Subtype: EXISTING TENANT REMODEL Parcel No: 00434401600300 Site Address: 306 MAIN ST EDMONDS,WA 98020-3136 Applied: 5/6/2020 Subdivision: 004344 Lot: 0 Issued: 7/23/2020 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $500,210.00 Occupancy Type: B Construction Type: IIIA Expiration Date: 7/23/2021 Code Edition: 2015 No. Stories: 0 # of Dwelling Units: 0 Issued by: WAC Scope of Work: BANK OF AMERICA-INTERIOR REMODEL WA State Contractor L & I #:ANDERC*907DN City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT GENSLER ARCHITECT -DON 1200 6TH AVE STE 500, SEATTLE (206)654-2092 DON_HENNING@GENSLER.COM HENNING WA 98101 CONTRACTOR ANDERSEN CONSTRUCTION 6712 N CUTTER CIR, PORTLAND (425)335-2283 VJOHNSON@ANDERSEN-CONST.COM OR 97217 BANK OF AMERICA-HUI MAIN 2100 22ND AVE S, SEATTLE WA OWNER STREET LLC 98144 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 7/22/20 R6562 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 7/22/20 R6562 PERMIT FEE - COMMERCIAL 001.000.322.10.000.00 $3,558.10 $3,558.10 7/15/20 R6437 PERMIT FEE - COMMERCIAL 001.000.322.10.000.00 $627.90 $627.90 7/22/20 R6562 PLAN REVIEW FEE - COMMERCIAL 001.000.345.83.000.00 $3,558.10 $3,558.10 5/7/20 R5205 TOTALS: $7,809.10 $7,809.10 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Thursday, July 23, 2020 10:52:58 AM 1 of 2 ■ LDG Permit PERMITNUM ir City of • • • 121 5th Ave N, Edmonds WA 98020 69 www.edmondswa.gov • 66 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests ALL BUILDING PERMITS FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. ELECTRICAL PERMIT O Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. ORMATION EXIT SIGNAGE AND EMERGENCY FOR Final locations of illuminated exit signs and emergency lighting subject to field inspection LIGHTING INFORMATION by the Fire Marshal. FIRE EXTINGUISHERS FOR Provide 2A lOBC portable fire extinguishers at locations noted on approved plans. NFORMATION FIRE FINAL INSPECTION FOR Request final Fire Department Inspection 425-775-0215. NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. Final approval on a project or final occupancy approval must be granted by the Building OCCUPANCY FOR Official prior to use or occupancy of the building or structure. Check the job card for all INFORMATION required City inspections including final project approval and final occupancy inspections. SEPARATE PERMIT REQUIRED FOR Separate Permit Required For: NFORMATION •IMMS M Me •712 •- • • •'- • COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE A-1 BUILDING PRECON B-4 DRYWALL FASTENING B-4 FRAMING B-4 INTERIOR SHEAR B-7 BUILDING OTHER INSP X-3 BUILDING FINAL** Printed: Thursday, July 23, 2020 10:52:58 AM 2 of 2