Building Permit 2020ERCIAL
■ LDG Permit
PERMIT NUM
City of Edmonds
-.
•. • •
Type: COMMERCIAL BLDG Owner/ Business: BANK OF AMERICA-HUI MAIN STREET LLC Status: ISSUED
Subtype: EXISTING TENANT REMODEL
Parcel No: 00434401600300 Site Address: 306 MAIN ST EDMONDS,WA 98020-3136
Applied: 5/6/2020
Subdivision: 004344
Lot: 0
Issued: 7/23/2020
Fire Sprinklers: Lot Area:
Zoning:
Final:
Valuation: $500,210.00 Occupancy Type: B
Construction Type: IIIA
Expiration Date: 7/23/2021
Code Edition: 2015 No. Stories: 0
# of Dwelling Units: 0
Issued by: WAC
Scope of Work: BANK OF AMERICA-INTERIOR REMODEL
WA State Contractor L & I #:ANDERC*907DN
City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE NAME ADDRESS PHONE
EMAIL
APPLICANT GENSLER ARCHITECT -DON 1200 6TH AVE STE 500, SEATTLE (206)654-2092
DON_HENNING@GENSLER.COM
HENNING WA 98101
CONTRACTOR ANDERSEN CONSTRUCTION 6712 N CUTTER
CIR, PORTLAND (425)335-2283
VJOHNSON@ANDERSEN-CONST.COM
OR 97217
BANK OF AMERICA-HUI MAIN 2100 22ND AVE S, SEATTLE WA
OWNER
STREET LLC 98144
FEE
INFORMATION
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
7/22/20
R6562
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$25.00
7/22/20
R6562
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00
$3,558.10
$3,558.10
7/15/20
R6437
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00
$627.90
$627.90
7/22/20
R6562
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00
$3,558.10
$3,558.10
5/7/20
R5205
TOTALS:
$7,809.10 $7,809.10
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Thursday, July 23, 2020 10:52:58 AM 1 of 2
■ LDG Permit
PERMITNUM
ir
City of • • •
121 5th Ave N, Edmonds WA 98020 69
www.edmondswa.gov •
66
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
ALL BUILDING PERMITS
FOR
shall be established by Council and shall be paid upon submittal and are nonrefundable.
INFORMATION
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays,
excluding Sundays and Federal Holidays. At all other times the noise originating from
construction sites/activities must comply with the noise limits of Chapter 5.30, unless a
variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a
project or final occupancy approval must be granted by the Building Official prior to use
or occupancy of the building or structure. Check the job card for all required City
inspections including final project approval and final occupancy inspections.
ELECTRICAL PERMIT
O
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
ORMATION
EXIT SIGNAGE AND EMERGENCY
FOR
Final locations of illuminated exit signs and emergency lighting subject to field inspection
LIGHTING
INFORMATION
by the Fire Marshal.
FIRE EXTINGUISHERS
FOR
Provide 2A lOBC portable fire extinguishers at locations noted on approved plans.
NFORMATION
FIRE FINAL INSPECTION
FOR
Request final Fire Department Inspection 425-775-0215.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
Final approval on a project or final occupancy approval must be granted by the Building
OCCUPANCY
FOR
Official prior to use or occupancy of the building or structure. Check the job card for all
INFORMATION
required City inspections including final project approval and final occupancy inspections.
SEPARATE PERMIT REQUIRED
FOR
Separate Permit Required For:
NFORMATION
•IMMS
M Me •712 •- • • •'- •
COMPLETED RESULT
SEQID
INSPECTION TYPE
INSPECTOR NOTES
DATE
A-1 BUILDING PRECON
B-4 DRYWALL FASTENING
B-4 FRAMING
B-4 INTERIOR SHEAR
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL**
Printed: Thursday, July 23, 2020 10:52:58 AM 2 of 2