Building PermitCOMMERCIAL BLDG Permit
� J
City of Edmonds
121 5th Ave N, Edmonds BLD2021-0244
www.edmondswa.gov
Type: COMMERCIAL BLDG Owner/ Business: BRIDGETTE GLASS Status: ISSUED
Subtype: COM ALTERATION OR REPAIR
Parcel No: 27032300415300 Site Address: 200 ADMIRAL WAY EDMONDS,WA 98020
Applied: 2/11/2021
Subdivision: 007245, WALKER-BELTZ SUBDIVISION (UNRECORDED), TOWN OF
Lot: 0
Issued: 4/9/2021
EDMONDS WATERFRONT
Fire Sprinklers: Lot Area: Zoning:
Final:
Valuation: $45,000.00 Occupancy Type: Construction Type:
Expiration Date: 4/4/2022
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Issued by: JOK
Scope of Work: FISHING PIER REPAIR
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
BRIDGETTE GLASS
600 CAPITOL WAY N, OLYMPIA
(360)790-3036
BRIDGETTE.GLASS@DFW.WA.GOV
WA 98501
CONTACT
WDFW
600 CAPITOL WAY N, OLYMPIA
(360)790-3036
bridgette.glass@dfw.wa.gov
WA 98501
CONTRACTOR
CITY OF EDMONDS
121 5TH AVE N, EDMONDS WA
(425)771-0220
98020
OWNER
EDMONDS CITY OF
250 5TH AVE N, EDMONDS WA
98020-3146
FEE INFORMATION
DESCRIPTION
ACCOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00 $40.00 $40.00
4/9/21
R11554
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150 $25.00 $25.00
4/9/21
R11554
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00 $820.00 $820.00
4/9/21
R11554
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00 1 $697.00 $697.00
1 2/16/21
1 R10543
TOTALS: $1,582.00 $1,582.00
CONDITIONS
CONDITION TYPE STATUS NOTES
Printed: Friday, April 09, 2021 2:27:46 PM 1 of 2
4
COMMERCIAL
BLDG • . rmit
PERMIT NU
City of • • •
I
-•
• • •• 1 1
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
FOR
Maintain erosion and sedimentation control per City and SWMMW standard
ESC REQ
INFORMATION
requirements.
Installation, use and maintenance of equipment and components shall be per
FOR
manufacturers specifications, installation instructions, and applicable state codes.
MANUFACTURER SPECS
INFORMATION
Provide manufactures installation instructions and ICC Evaluation Report on site for
Building Inspector.
The issuance of this permit in no way constitutes approval from any other agencies
REGULATING AGENCIES
FOR
having regulatory authority over the facility and this construction activity. It is the
INFORMATION
responsibility of the property owner to obtain any and all such required approvals.
A structural analysis was not performed on this project as it is for minor structural
SPECIAL INSPECTION BUILDING
FOR
deficiencies addressed with prescriptive measures. No stamped drawings or calculations,
DIVISION
INFORMATION
or special inspections required for this project.
INSPECTIONS
- Schedule Online
at: https://Inspection.MvBuildingPermit.com
COMPLETED RESULT
SEQID
INSPECTION TYPE
INSPECTOR
NOTES
DATE
A-1 BUILDING PRECON
B-7 BLDG SITE INSPECTION
X-3 BUILDING FINAL**
Printed: Friday, April 09, 2021 2:27:46 PM 2 of 2