Loading...
Building PermitCOMMERCIAL BLDG Permit � J City of Edmonds 121 5th Ave N, Edmonds BLD2021-0244 www.edmondswa.gov Type: COMMERCIAL BLDG Owner/ Business: BRIDGETTE GLASS Status: ISSUED Subtype: COM ALTERATION OR REPAIR Parcel No: 27032300415300 Site Address: 200 ADMIRAL WAY EDMONDS,WA 98020 Applied: 2/11/2021 Subdivision: 007245, WALKER-BELTZ SUBDIVISION (UNRECORDED), TOWN OF Lot: 0 Issued: 4/9/2021 EDMONDS WATERFRONT Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $45,000.00 Occupancy Type: Construction Type: Expiration Date: 4/4/2022 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: JOK Scope of Work: FISHING PIER REPAIR WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT BRIDGETTE GLASS 600 CAPITOL WAY N, OLYMPIA (360)790-3036 BRIDGETTE.GLASS@DFW.WA.GOV WA 98501 CONTACT WDFW 600 CAPITOL WAY N, OLYMPIA (360)790-3036 bridgette.glass@dfw.wa.gov WA 98501 CONTRACTOR CITY OF EDMONDS 121 5TH AVE N, EDMONDS WA (425)771-0220 98020 OWNER EDMONDS CITY OF 250 5TH AVE N, EDMONDS WA 98020-3146 FEE INFORMATION DESCRIPTION ACCOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 4/9/21 R11554 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 4/9/21 R11554 PERMIT FEE - COMMERCIAL 001.000.322.10.000.00 $820.00 $820.00 4/9/21 R11554 PLAN REVIEW FEE - COMMERCIAL 001.000.345.83.000.00 1 $697.00 $697.00 1 2/16/21 1 R10543 TOTALS: $1,582.00 $1,582.00 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Friday, April 09, 2021 2:27:46 PM 1 of 2 4 COMMERCIAL BLDG • . rmit PERMIT NU City of • • • I -• • • •• 1 1 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. FOR Maintain erosion and sedimentation control per City and SWMMW standard ESC REQ INFORMATION requirements. Installation, use and maintenance of equipment and components shall be per FOR manufacturers specifications, installation instructions, and applicable state codes. MANUFACTURER SPECS INFORMATION Provide manufactures installation instructions and ICC Evaluation Report on site for Building Inspector. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. A structural analysis was not performed on this project as it is for minor structural SPECIAL INSPECTION BUILDING FOR deficiencies addressed with prescriptive measures. No stamped drawings or calculations, DIVISION INFORMATION or special inspections required for this project. INSPECTIONS - Schedule Online at: https://Inspection.MvBuildingPermit.com COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE A-1 BUILDING PRECON B-7 BLDG SITE INSPECTION X-3 BUILDING FINAL** Printed: Friday, April 09, 2021 2:27:46 PM 2 of 2