Loading...
BLD2021-0819+Applicant_Response+10.15.2021_5.19.01_PM+2466828Consulting Services Since 19Gg principals Michael P. Smith, PE, BE Mark A. Schaefer, PE, BE James F. Paustian, PE, BE Kyle J. Bozick, PE, BE Nathan L. Fritz, AIA Ryan P. Barrett, PE deilrey M. Bozick, PE October 15, 2021 Mr. Eric Carter CrrY OF EDMONDS 121 5th Ave N Edmonds, WA 98020 Permit Nos.: BLDG2021-0815 (Building 71) and BLDG2021-0819 (Building 61) Subject: Scope of Work Revision at Buildings 61 and 71 - Installation of Pin Piles Dear Mr. Carter: The items listed below are changes to the original permitted drawings dated June 9, 2021 that have been incorporated into our Post Permit Submittal drawings with Revision 1 dated October 15,2021. Modifications made to the drawings have been clouded with a Revision 1. Below is a summary of the revisions included in the drawings: 1. We have added pin piles to provide additional support underneath the southern portion of entry walkway foundations at Buildings 61 and 71. Please let us know if you have any questions or require additional information. Sincerely, PACIFIC E>Cy R Nathan Oritz, AIA TECHNOLOGIES, INC. 18287 pest permit submittal rev L3ocx 10' 1521 2150 NORTH 1071" STREET, SUITE 320 f SEATTLE, WASHINGTON 98133 www.pacenglech.cem I Ph:206-281-7500 1 Fax:206-281-4611