APPROVED BLD2021-1107+Architectural_Plan+8.9.2021_4.51.29_PM+2347485I. REGULATORY AGENCIES 1. ALL WORK SHALL CONFORM TO THE MOST CURRENT, APPLICABLE LOCAL AND NATIONAL CODES, INCLUDING BUT NOT LIMITED TO: INTERNATIONAL BUILDING CODE (IBC), INTERNATIONAL MECHANICAL CODE (IMC), INTERNATIONAL PLUMBING CODE (IPC), NATIONAL ELECTRIC CODE (NEC), AND WASHINGTON ENERGY STANDARDS. 2. COMPLY WITH THE WASHINGTON ENERGY COMMISSION'S CERTIFICATION REQUIREMENTS FOR PLUMBING, TRIM, WATER HEATERS, FURNACES, AND APPLIANCES. 3. ALL ELECTRICAL FIXTURES SHALL BE INSTALLED TO MEET U.L. AND N.E.C. REQUIREMENTS, AS WELL AS STATE AND LOCAL CODES. 4. STORAGE, DISPENSING AND/ OR USE OF ANY FLAMMABLE OR COMBUSTIBLE LIQUIDS, FLAMMABLE GASES, AND HAZARDOUS CHEMICALS SHALL COMPLY WITH THE UNIFORM FIRE CODE REGULATIONS. 5. SUBMIT FIRE PROTECTION PLANS TO THE FIRE CHIEF FOR REVIEW AND STAMP OF APPROVAL FOR FIRE CODE REQUIREMENTS. 6. PROVIDE ALL ACCESS PANELS AS REQUIRED BY GOVERNING CODE OR AUTHORITIES TO ALL CONCEALED SPACES VOIDS, OIDS ATTICS AND $O ON. VERIFY THE TYPE REQUIRED WITH THE ARCHITECT PRIOR TO INSTALLATION. 7. ALL INSTALLATION MATERIALS MUST BE INSTALLED IN COMPLIANCE WITH THE FLAME SPREAD AND SMOKE DENSITY REQUIREMENTS. 8. BUILDING INSULATION TO BE CERTIFIED BY THE MANUFACTURER TO MEET THE WASHINGTON STANDARDS FOR INSULATING MATERIALS. 9. ALL EXTERIOR DOORS AND WINDOWS SHALL BE DESIGNED TO LIMIT AIR LEAKAGE PER THE ENERGY CONSERVATION STANDARDS. 10. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THAT ALL PERMITS AND APPROVALS HAVE BEEN CLEARED WITH APPROPRIATE AGENCIES PRIOR TO THE START OF CONSTRUCTION. NO CONSTRUCTION OR FABRICATION OF ANY ITEMS SHALL BEGIN UNTIL THE CONTRACTOR HAS RECEIVED ALL PLANS AND ANY OTHER DOCUMENTATION FROM ALL THE PERMITTING AND OTHER REGULATORY AUTHORITIES. FAILURE OF THE CONTRACTOR TO FOLLOW THESE PROCEDURES SHALL CAUSE THE CONTRACTOR TO ASSUME FULL RESPONSIBILITY FOR ANY SUBSEQUENT MODIFICATION OF THE WORK MANDATED BY REGULATORY AUTHORITIES. 11. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR, AS HOLDER OF PERMITS, TO NOTIFY THE BUILDING OFFICIAL WHEN WORK IS READY FOR INSPECTION. REQUEST SHALL BE IN ACCORDANCE WITH REGULATORY AGENCIES' REQUIREMENTS. INSPECTORS SHALL HAVE COMPLETE ACCESS TO ALL WORK. 12, CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FEES REQUIRED FOR INSPECTIONS. 13. WORK NOT READY FOR INSPECTION THAT REQUIRES RE -INSPECTION DUE TO IMPROPER PLACEMENT OF WORK BY CONTRACTOR, OR DUE TO INCOMPLETE WORK, SHALL REQUIRE THAT THE CONTRACTOR PAY FOR RE -INSPECTION SERVICES OR FEES, IF REQUIRED. 14. RECORD OF INSPECTIONS SHALL BE MAINTAINED ON THE JOB SITE IN ACCORDANCE WITH REGULATORY AGENCY REQUIREMENTS. It. PREPARATION FOR CONSTRUCTION 1. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COMPLETELY FAMILIARIZE HIMSELF/ HERSELF WITH THESE DRAWINGS AND THE SITE CONDITIONS, AND TO VERIFY ALL DETAILS WITH THE OWNER PRIOR TO THE START OF CONSTRUCTION. 2. DO NOT SCALE DRAWINGS. 3. DIMENSIONS ARE TO FINISH SURFACES UNLESS OTHERWISE NOTED. WHERE REQUIRED,'MINIMUM CLEAR' DIMENSIONS HAVE BEEN NOTED SEE COVER SHEET FOR GRAPHIC EXPLANATION. 4. ANY DISCREPANCY OR ERROR IN DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND OWNER PRIOR TO THE COMMENCEMENT OF WORK. 5. THE DRAWINGS DO NOT ILLUSTRATE EVERY CONDITION. THE DRAWINGS INDICATE LOCATIONS, DIMENSIONS, AND TYPICAL DETAILS OF CONSTRUCTION. WORK NOT EXPRESSLY DETAILED SHALL BE OF CONSTRUCTION SIMILAR TO PARTS THAT ARE DETAILED. DISCREPANCIES SHALL BE REPORTED TO THE ARCHITECT FOR RESOLUTION. 6. THE CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE. UNLESS OTHERWISE SHOWN, THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE GENERAL CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK AND HE/SHE SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES. OBSERVATION VISITS TO THE SITE BY FIELD REPRESENTATIVES OF THE ARCHITECT AND HIS CONSULTANTS DO NOT INCLUDE INSPECTION OF THE PROTECTIVE MEASURES OR THE PROCEDURES FOR SUCH METHODS OF CONSTRUCTION. ANY SUPPORT SERVICES PROVIDED BY THE ARCHITECT AND HIS CONSULTANTS DURING CONSTRUCTION SHALL BE DISTINGUISHED FROM CONTINUOUS AND DETAILED INSPECTION SERVICES WHICH ARE FURNISHED BY OTHERS. THESE SUPPORT SERVICES, WHICH ARE FURNISHED BY THE ARCHITECT AND HIS CONSULTANTS, WHETHER OF MATERIAL OR WORK AND WHETHER PERFORMED PRIOR TO, DURING, OR AFTER COMPLETION OF CONSTRUCTION, ARE PERFORMED SOLELY FOR THE PURPOSE OF ASSISTING IN QUALITY CONTROL AND IN ACHIEVING CONFORMANCE WITH CONTRACT DRAWINGS AND SPECIFICATIONS, BUT THEY DO NOT GUARANTEE CONTRACTOR'S PERFORMANCE AND SHALL NOT BE CONSTRUED AS SUPERVISION OF CONSTRUCTION. 7. IN THE EVENT THAT CERTAIN FEATURES OF THE CONSTRUCTION ARE NOT SHOWN OR NOTED, THEN THEIR CONSTRUCTION SHALL BE OF THE SAME GENERAL CHARACTER AS SIMILAR CONDITIONS SHOWN OR NOTED. 8. THE ARCHITECT AND OWNER WILL NOT BE RESPONSIBLE FOR AMBIGUITIES AND OMISSIONS NOT BROUGHT TO THEIR ATTENTION. 9. BY SUBMITTING A BID, THE BIDDER AGREES AND WARRANTS THAT HE/SHE HAS EXAMINED THE DRAWINGS AND FOUND THAT THEY ARE ADEQUATE FOR PROPER COMPLETION OF THE PROJECT. 10. PRIOR TO THE ISSUANCE OF A BUILDING PERMIT, THE CONTRACTOR SHALL HAVE EVIDENCE OF CURRENT WORKMAN'S COMPENSATION INSURANCE COVERAGE ON FILE WITH THE DEPARTMENT IN COMPLIANCE WITH THE WASHINGTON LABOR CODE. 11. THE CONTRACTOR IS TO PROVIDE COMPLETE FIRE PROTECTION SHOP DRAWINGS, CATALOG CUT SHEETS, AND CALCULATIONS TO THE ARCHITECT PRIOR TO SUBMITTALS TO GOVERNING JURISDICTIONS. 12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING FIELD MEASUREMENTS BEFORE ORDERING MATERIALS AND PREFABRICATED ITEMS. ANY NECESSARY ADJUSTMENTS BETWEEN FIELD MEASUREMENTS AND DRAWINGS SHALL BE MADE IN ACCORDANCE WITH THE DECISION OF THE ARCHITECT AND/OR OWNER. 13. INSPECTION OF SITE: THE CONTRACTOR AND HIS/HER SUBCONTRACTORS SHALL VISIT THE SITE AND SATISFY THEMSELVES AS TO EXISTING CONDITIONS, THE CONDITION UNDER WHICH THEY WILL BE REQUIRED TO OPERATE, AND THAT WILL EFFECT THEIR WORK UNDER THE CONTRACT. NO CLAIMS FOR EXTRAS DUE TO THEIR INABILITY TO ANTICIPATE EXISTING CONDITIONS WILL BE ALLOWED. 14. SCOPE OF WORK: ALL LABOR MATERIALS FABRICATION EQUIPMENT APPLIANCES APPURTENANCES TRANSPORTATION, AND SERVICES REQUIRED FOR CONSTRUCTION, ERECTION, AND INSTALLATION OF ALL OF THE VARIOUS WORK INDICATED ON THE DRAWINGS AND/OR SPECIFIED UNDER EACH OF THE SPECIFICATION SECTIONS. ANY SITE DEMOLITION AND REMOVAL OF ANY MATERIAL, RUBBISH, OR DEBRIS ABOVE OR BELOW GRADE. ALL EARTHWORK AND FOUNDATION WORK. 15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EXISTING FACILITIES ON OR ADJACENT TO THE PREMISES, WHETHER SHOWN ON DRAWINGS OR NOT. IN THE EVENT OF DAMAGE, SUCH ITEMS SHALL BE IMMEDIATELY REPAIRED OR REPLACED BY THE CONTRACTOR AT HIS EXPENSE, TO THE SATISFACTION OF THE ARCHITECT AND/OR OWNER. 16. THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES AND REQUEST FIELD LOCATION MARKINGS OF FACILITIES PRIOR TO COMMENCING CONSTRUCTION. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR LOCATING AND PROTECTING ALL UNDERGROUND UTILITIES. WHERE POTENTIAL CONFLICT WITH UNDERGROUND UTILITIES MAY CONSTITUTE A SAFETY HAZARD OR INTERFERE WITH THE PROGRESS OF THE WORK, SUCH FACILITIES SHALL BE HAND EXCAVATED TO DETERMINE THEIR PRECISE LOCATION. SUCH FACILITIES INCLUDE, BUT ARE NOT LIMITED TO: PLUMBING, SEWERS, ELECTRICAL LINES, NATURAL GAS, AND TELEPHONE LINES. 17. ALL NOISE BARRIER BATTS (SOUND INSULATION) SHALL BE INCOMBUSTIBLE. 18. SITE GRADING INCLUDES DEMOLITION OF ANY EXISTING STRUCTURES ABOVE OR BELOW EXISTING GRADE, EXCAVATIONS, AND GRADING OF SITE TO ELEVATIONS SHOWN ON GRADING/DRAINAGE PLAN AND FOUNDATION PLAN. EXCESS SOIL MATERIAL INCLUDING TREES AND VEGETATION AND DEBRIS FOUND DURING EXCAVATION SHALL BE REMOVED FROM THE SITE AND HAULED TO THE NEAREST PLACE ACCEPTING FILL MATERIAL. CONSULT OWNER REGARDING STORAGE OF TOPSOIL ON SITE FOR OWNER'S USE. CONTRACTOR SHALL NEGOTIATE TERMS AND PAY DISPOSAL OF EXCESS SOIL AT NO ADDITIONAL COST TO OWNER. 19. THE CONTRACTOR SHALL PROVIDE FOR: (1) TEMPORARY FENCED PROTECTION OF GROUPS OF TREES AND SHRUBS ADJACENT TO THE CONSTRUCTION AREA. (2) THE REPLACEMENT OF TREES, SHRUBS, OR GROUND -COVER BY APPROPRIATE PLANTING, UNDER THE DIRECTION OF THE LANDSCAPE CONSULTANT OR ARCHITECT. (3) UPON COMPLETION OF MAJOR CONSTRUCTION, THE RESTORATION OF THE SITE TO ITS ORIGINAL NATURAL CONDITION, INCLUDING APPROVED REVEGETATION AND THE REMOVAL OF THE PROTECTIVE FENCES. 20, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING THE WORK IN ACCORDANCE WITH THE PROPERTY LINES AND ELEVATIONS PER THE SURVEY DRAWING AND GRADING/DRAINAGE PLAN. 21. CONTRACTOR TO PROVIDE FULL HEIGHT, PAINTED, TEMPORARY BARRICADES AS REQUESTED TO PREVENT THE PASSAGE OF DUST AND FUMES TO PUBLIC AREAS AND TO PROTECT THE PUBLIC FROM CONSTRUCTION ACTIVITIES. 22. CONTRACTOR TO COORDINATE ALL PLUMBING, GAS, ELECTRICAL, SPRINKLER, AND HVAC SYSTEMS FOR COMPATIBILITY WITH THE PROPOSED DESIGN PRIOR TO COMMENCEMENT OF CONSTRUCTION. 23. CONTRACTOR TO VERIFY ALL ELECTRICAL, PLUMBING, AND HVAC REQUIREMENTS FOR EXISTING OR SPECIFIED EQUIPMENT PRIOR TO CONSTRUCTION. ADDITIONALLY, CONTRACTOR SHALL CONFIRM EQUIPMENT LIST WITH THE ARCHITECT BEFORE COMMENCEMENT OF WORK. 24. CONTRACTOR TO VERIFY ANY EQUIPMENT EXISTING OR SPECIFIED FOR COMPATIBILITY WITH ELECTRICAL VOLTAGE/PHASE, AND OTHER UTILITIES. 25. VERIFY EXACT LOCATION OF PLUMBING AND PIPING WITH PLUMBING CONTRACTOR. 26. VERFY EXACT LOCATON OF ALL MECHANICAL EQUIPMENT, DUCTS, GRILLES, REGISTERS, FLUES, AND VENTS WITH THE MECHANICAL CONTRACTOR OR ARCHITECT. 27. PROVIDE REQUIRED BLOCKING AND BACKING FOR ALL RAILINGS, PANELS, CABINETS, SHELVING, AND TOILET ACCESSORIES. 28. T2 SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY, HANDLING, PRESENCE, DISPOSAL, REMOVAL OF, OR EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS IN ANY FORM AT THE PROJECT SITE, INCLUDING BUT NOT LIMITED TO ASBESTOS, ASBESTOS PRODUCTS, POLYCHLORINATED BEPHENYL (PCB), OR OTHER TOXIC SUBSTANCES. SUCH WORK, IF REQUIRED, SHALL BE COMPLETED UNDER SEPARATE CONTRACT. ll General Notes III. QUALITY & JOB MANAGEMENT 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK OF ALL THE TRADES. 2. ALL WORK SHALL EQUAL OR EXCEED ALL CURRENT APPLICABLE BUILDING, ELECTRICAL, PLUMBING, MECHANICAL, SAFETY, ZONING CODES, AND ORDINANCES. 3. CONTRACTOR AND SUBCONTRACTORS MUST PERFORM ALL WORK TO MEET CURRENT CODES AND REQUIREMENTS OF PREVAILING JURISDICTIONS, EVEN WHEN SUCH CONFORMANCE IS INCONSISTENT WITH THESE DRAWINGS. ARCHITECT SHALL BE NOTIFIED IF SUCH CHANGES ARE REQUIRED. 4. THE CONTRACTOR SHALL CONSULT THE INTERIOR FINISH SCHEDULE FOR ALL INTERIOR MATERIALS, COORDINATION, CABINETS, ETC. 5. ALL ITEMS OF MILLWORK SHALL BE CAREFULLY ERECTED WITH TIGHT FITTING JOINTS, CAREFULLY CUT AND SECURED. EXPOSED NAILS SHALL BE SET IN PUTTY. BEFORE INSTALLATION, ALL MILLWORK SHALL BE BACK PRIMED AND PROTECTED AGAINST DAMPNESS. MOLDS AND FACES SHALL BE CLEAN CUT AND TRUE PATTERN. ALL WORK SHALL BE THOROUGHLY CLEANED AND SANDED TO RECEIVE THE FINISH. SHARP CORNERS OF SMALL MEMBERS OF FINISH 6. WOODWORK SHALL BE SLIGHTLY ROUNDED. 7. ALL FRAMING SHALL BE INSTALLED CLOSELY FITTED, ACCURATELY SET IN PLACE TO THE REQUIRED LINES AND LEVELS, AND SHALL BE OF THE DIMENSIONS SHOWN ON DRAWINGS. DO NOT IMPAIR STRUCTURAL MEMBERS BY IMPROPER CUTTING OR DRILLING. 8. CONTRACTOR SHALL PROVIDE AND LOCATE ACCESS PANELS AS REQUIRED AFTER INSTALLATION OF MECHANICAL DUCTS, PLUMBING, ELECTRICAL, AND FIRE SPRINKLER WORK. 9. ALL PROPRIETY PRODUCTS NOTED ON THE DRAWINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS' RECOMMENDATIONS AND HAVE PRIOR APPROVAL FROM THE LOCAL GOVERNING AGENCIES. 10. DRAWINGS ARE NOT TO BE, NOR ARE THEY INTENDED TO BE A COMPLETE REPRESENTATION OF ALL PARTICULARS RELATING TO ALL CODES. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR PERFORMING ALL WORK REQUIRED TO OBTAIN NECESSARY APPROVALS FROM PREVAILING JURISDICTIONS. CONTRACTOR SHALL BE RESPONSIBLE FOR PERFORMING ALL WORK NECESSARY TO ADHERE TO THE DESIGN INTENT OF THE DRAWINGS., WHETHER NOTED OR NOT. IF DESIRED INTENT IS UNCLEAR, CONTRACTOR SHALL NOTIFY ARCHITECT. 11.THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING A REASONABLY NEAT AND ORDERLY SITE DURING CONSTRUCTION; HE/SHE SHALL LEAVE THE SITE CLEAN, REMOVING ALL EQUIPMENT, TEMPORARY BUILDINGS, FENCES, PACKING MATERIALS AND DEBRIS. 12.THE CONTRACTOR IS RESPONSIBLE FOR EVACUATION SAFETY PER WASHINGTON STATE LAW. 13.THE CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE RESPONSIBILITY FOR THE JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND IS NOT LIMITED TO NORMAL WORKING HOURS, AND THE CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY, AND HOLD OWNER, ARCHITECT, STRUCTURAL ENGINEER, AND SOIL ENGINEER HARMLESS FROM ANY LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OR WORK ON THIS PROJECT. 14.140 MATERIALS SHALL BE STORED ON PUBLIC PROPERTY UNLESS AN ENCROACHMENT PERMIT IS FIRST OBTAINED FROM THE PUBLIC WORK DEPARTMENT. 15.THE ARCHITECT AND THE ENGINEER WILL MAKE PERIODIC VISITS TO THE JOB SITE TO OBSERVE THE PROGRESS OF THE WORK. THE ARCHITECT AND ENGINEER SHALL NOT HAVE CONTROL OR CHARGE OF, AND SHALL NOT BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, OR PROCEDURES, FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, FOR ACTS OR OMISSIONS OF THE CONTRACTOR, SUBCONTRACTORS OR ANY PERSONS PERFORMING ANY OF THE WORK OR FOR FAILURE OF ANY OF THEM TO CARRY OUT THE WORK IN CONFORMANCE WITH THE CONTRACT DOCUMENTS. 16.ALL SURFACES TO BE PAINTED SHALL RECEIVE A MINIMUM OF 2 FINISH COATS, U.O.N. IV. CHANGES TO WORK & SUBMITTALS 1. CHANGES OR MODIFICATIONS TO THE WORK DURING CONSTRUCTION SHALL BE RECORDED WITH THE APPROPRIATE REGULATORY AGENCIES AND APPROVALS FROM SUCH AGENCIES SHALL BE OBTAINED PRIOR TO MAKING SUCH CHANGES. REGULATORY AGENCIES SHALL BE NOTIFIED BY THE CONTRACTOR OF ALL SUCH CONSTRUCTION CONTRACT CHANGES AFTER PERMITS ARE ISSUED. 2. THE ARCHITECT SHALL BE INFORMED IN WRITING OF ALL CHANGES OR SUBSTITUTIONS MADE TO THESE PLANS AND SPECIFICATIONS. THE ARCHITECT SHALL HAVE NO IMPLIED OR ASSUMED RESPONSIBILITY FOR CHANGES IMPLEMENTED WITHOUT THE ARCHITECT'S PRIOR APPROVAL. 3. THE CONTRACTOR SHALL INSPECT ALL WORK PREVIOUSLY PREPARED OR INSTALLED BY OTHERS BEFORE APPLYING THE SUBSEQUENT MATERIALS OR FINISHES. IF AN UNSATISFACTORY CONDITION IS FOUND THE CONTRACTOR WILL NOTIFY THE ARCHITECT, AND WILL NOT PROCEED UNTIL THE DEFECTIVE WORK HAS BEEN CORRECTED. THIS QUALITY CONTROL INCLUDES ON -SITE INSPECTION DEVICES AS REQUIRED BY SPECIFICATIONS. 4. A COLOR SCHEDULE WILL BE ISSUED BY THE ARCHITECT. THE CONTRACTOR, SUBCONTRACTOR, AND MATERIAL SUPPLIERS SHALL COOPERATE IN FURNISHING REQUIRED COLOR SAMPLES TO AID IN FINAL SELECTIONS. WHERE SPECIAL COLORS ARE SELECTED BY THE ARCHITECT AND OWNER, THE CONTRACTOR SHALL FURNISH ACCURATE REPRODUCTIONS OF THESE COLORS ON THE ACTUAL MATERIAL TO BE FURNISHED FOR THE PROJECT FOR REVIEW. S. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND SAMPLES WHERE CALLED FOR ON DRAWINGS, AS SPECIFIED. APPROVAL SHALL BE OBTAINED BEFORE COMMENCING FABRICATION. ARCHITECT'S APPROVAL OF DRAWINGS OR SHOP DRAWINGS SHALL NOT RELIEVE CONTRACTOR FROM RESPONSIBILITY FOR ERRORS OR DERIVATIONS FROM DRAWINGS OR SPECIFICATIONS, UNLESS HE HAS IN WRITING CALLED THE ARCHITECT'S ATTENTION TO DERIVATIONS AT TIME OF SUBMISSION. 6. SHOP DRAWINGS: SHOP DRAWINGS ARE AN AID FOR FIELD PLACEMENT AND ARE SUPERSEDED BY THE ARCHITECTURAL DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO MAKE CERTAIN THAT ALL CONSTRUCTION IS IN FULL AGREEMENT WITH THE LATEST ARCHITECTURAL DRAWINGS. THE CONTRACTOR SHALL SUPPLY THE ARCHITECT/ENGINEER WITH A MINIMUM OF TWO COPIES OF CHECKED SHOP DRAWINGS BEARING THE CONTRACTOR'S STAMP OF APPROVAL AND SIGNATURE, A MINIMUM OF THREE WEEKS PRIOR TO FABRICATION. THE REVIEW OF SHOP DRAWINGS AND SPECIFICATIONS BY THE ARCHITECT/ENGINEER IS ONLY FOR GENERAL COMPLIANCE WITH THE ARCHITECTURAL AND/OR STRUCTURAL DRAWINGS AND SPECIFICATIONS. THIS REVIEW DOES NOT GUARANTEE IN ANY WAY THAT THE SHOP DRAWINGS ARE CORRECT, COMPLETE, NOR DOES IT INFER THAT THEY SUPERSEDE THE ARCHITECTURAL AND/OR STRUCTURAL DRAWINGS. NO PORTION OF THE WORK REQUIRING A SHOP DRAWING OR SAMPLE SUBMISSION SHALL COMMENCE UNTIL THE SUBMISSION HAS BEEN REVIEWED BY THE ARCHITECT. ALL SUCH PORTIONS OF THE WORK SHALL BE IN ACCORDANCE WITH APPROVED SHOP DRAWINGS AND SAMPLES. THE ARCHITECT SHALL NOT PROCEED WITH THE REVIEW OF SHOP DRAWINGS FOR A SPECIFIC SECTION OF SPECIFICATIONS UNLESS THE SHOP DRAWINGS FOR THAT SECTION AND ALL RELATED AND CONTIGUOUS SECTIONS OF WORK ARE SUBMITTED IN THEIR ENTIRETY SIMULTANEOUSLY. THE REVIEW AND ACCEPTANCE OF A PART OF THE SHOP DRAWINGS SHALL NOT IMPLY THE ACCEPTANCE OF THE SHOP DRAWINGS, IN WHOLE OR IN PART. 7. SUBSTITUTIONS: WHEN A MATERIAL OR ARTICLE IS SPECIFIED OR INDICATED BY NAME OF PRODUCT OR MANUFACTURER, IT SHALL HAVE PROPRIETOR STATUS. OTHER MATERIALS OR ARTICLES MAY BE SUBSTITUTED IF IN THE OPINION OF THE ARCHITECT AND OWNER, THE MATERIAL OR ARTICLE IS EQUAL TO THAT SPECIFIED. REQUEST FOR SUBSTITUTIONS SHALL NOT DELAY WORK. CONTRACTOR SHALL COORDINATE ACCEPTED SUBSTITUTIONS WITHOUT ADDITIONAL COST TO OWNER. ALL SUBSTITUTIONS MUST HAVE WRITTEN PERMISSION. COLOR SAMPLES OF ALL MATERIALS THAT AFFECT THE AESTHETICS OF THE DESIGN MUST BE SUBMITTED. WHEN A MANUFACTURED PRODUCT IS NOT SPECIFIED, CONTRACTOR WILL UTILIZE THE HIGHEST QUALITY PRODUCT AVAILABLE ON THE MARKET IN THE MIDDLE PRICE RANGE. CONTRACTOR SHALL ON NO ACCOUNT USE LOWER END PRODUCTS AT THE BOTTOM PRICE RANGE WHEN BETTER QUALITY PRODUCT IN THE MIDDLE PRICE RANGE EXISTS. 8. ONLY DRAWINGS, SPECIFICATIONS, ADDENDA, AND CHANGE ORDERS BEARING APPROVAL OF OWNER SHALL BE USED IN THE EXECUTION OF WORK PERMITTED ON JOB SITE. 9. ADDENDA WILL BE ISSUED DURING BIDDING TO CLARIFY DRAWINGS (AND SPECIFICATIONS) AS REQUIRED, THESE WILL BECOME A PART OF THE CONTRACT -CONSULT ARCHITECT. APN: 00418600000500 PROJECT TEAM: ZONING: R OWNER: Aaron & Alison Shuns EXISTING LOT AREA: 13,068 SF 841 Gaspers Street Edmonds, WA 98020 CONSTRUCTION TYPE: VB T. 704,293,4861 OCCUPANCY: R& Single Family EMAIL: aaron@mentorcg.com alison@mentoog.com BUILDING HEIGHT/ STORIES: No Change FLOOR AREA No Change ARCHITECT: U DESIGN +ARCHITECTURE CODE REQUIREMENTS: Tuvia Poliakin, LEEDAP BD+C 14722 32ND Ave. NE 2021 EDMONDS MUNICIPAL CODE (EMC) Shoreline, WA. 2018 INTERNATIONAL BUILDING CODE (IRC) with Washington State Amendments T. 425-395-4861 2018 INTERNATIONAL EXISTING BUILDING CODE IEBC with Washington State Amendments EMAIL t tuvia oliskin.com @ P 20181NTERNATIONAL MECHANICAL CODE IMC with Washington Stale Amendments ( ) 9 20181NTERNATIONAL ENERGY CONSERVATION CODE with Washington State Amendments (WSEC) 20181NTERNATIONAL PLUMBING CODE (UPC) with Washington State Amendments 2018 INTERNATIONAL FIRE CODE (IFC) with Edmonds and Washington State Amendments Drawing Index: ALL CONSTRUCTION TO BE PERFORMED IN ACCORDANCE WITH THE MOST CURRENT A0.0 COVER SHEET A1.0 DEMO UPPER LEVEL FLOOR PLAN ISSUE OF THE FOLLOWING CODES: THE INTERNATIONAL BUILDING CODE, THE A2.0 NEW UPPER LEVEL FLOOR PLAN WASHINGTON STATE ENERGY CODE, THE INDOOR AIR QUALITY AND VENTILATION A2.t NEW UPPER LEVEL 8 RCP/ELECTRICAL PLAN CODE, AND LOCAL CODES/ AMENDMENTS AS APPLICABLE. A3.0 SCHEDULES PROJECT DESCRIPTION: THE SCOPE OF WORK INCLUDES REMODEL OF TWO EXISTING BATHROOMS WITH NEW MASTER CLOSET w/ ASSOCIATED ELECTICAL, PLUMBING & MECHANICAL WORK. 1 Project Information Li ALL K SUBJECT TO FIELD �_ ____ INSPECTION FOR D' z2 lot 5� : I 02 15 CODE COMPLIANCE 2-713 " 2-117 2- 2.1. 2-77-,10-2-117 2-133 143 - 2-142 4 j2-134 - 2-240 ..- L- ` 3 6 $ 976 8 1 2-260 gRDOKMeRE OR- _...gym, Nt H NSE ADD 2-t44 I tt to e 2 ' 13 4 2-138 m e _N20170055 tz tt ER s ROOKMEREDR ,..w.„,. 03 } 02 3 APPROVED SP PLN I 8 Ot 7 8 s 2-145 � 2-a95 2-180 2-158 463 } 2 """"1�02 I OB OS 03 2-257' 2 258 µ03 2-, 51 � ui"� 2-232 -235 PLAN MUST B E 3 -teo 2-182 i ��1 } I g a J i2-150 i ,6 "�� -� � a fi 4 Site N ti N, N t' -,57 2-756 2-159 , 241 fi 5 134 13 12 O N JOB SITE N .N ' ( ) �. aes e� 402 2-00W2-004!2-00 24et i 2-174 A } } ; - 00 " S-t - "'"s""'y"' •" 2-177� E"i`2-779J` TR ss 6 j OPKt 2 3 zae ; 2-Oa 2-008} 2-OD7~ mm^ A € N } i } £ ES�AT S I 02 1 7 2-172 - s -228 2-0091 2-012 2-010 �2-775 2-238�} 2-2W 1 2 2-230 -233£ 2-024 2-778 2-239 iq 2-212 i 3 2 1 •~03 - 01 i 1 } 2-216 , I � ,.�.�.m -._ - i o_1ao 2-171 02 E. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . II n Vicinity Map Interconnected Smoke Alarms Are A Requirement; u U �I Of This Permit In Accordance With R314.2.2 ,I Y V. COMPLETION I. ALL WORK SHALL BE CLEAN AND READY FOR USE UPON COMPLETION. TEMPORARY TAPES, WRAPPING, COATING, PAPER LABELS AND OTHER ITEMS SHALL BE REMOVED. EXPOSED AND SEMI -EXPOSED SURFACES SHALL BE DUSTED, MOPPED, WASHED, WIPED, AND BUFFED AS NECESSARY TO LEAVE WORK IN A NEW, CLEAN, IMMACULATE CONDITION. 2. PROVIDE FINAL CLEANING AND POLISHING OF FINISH HARDWARE BRIGHT AND ANODIZED METAL FINISHES, GLASS MIRRORS, AND PLUMBING FIXTURES, INCLUDING OTHER SWEEPING, DUSTING, ETC.; ASSEMBLE GUARANTEES, OPERATIONS AND MAINTENANCE INSTRUCTIONS, ETC.; AND DELIVER TO OWNER. 3. CLEANING METHODS FOR PROPRIETY MATERIALS SHALL BE IN STRICT ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. CLEANING SOLUTIONS, AGENTS, SOLVENTS, WAXES, OR OTHER MATERIALS SHALL BE ONLY AS APPROVED BY MANUFACTURER OF THE MATERIAL INSTALLED IN THE WORK. City% OD�M tEFd m o n d s 4. CONTRACTOR IS RESPONSIBLE FOR PROVIDING OW ER(S) WITH RECORD CO TR ILT COMPLETION OF PROJECT. Building Department .________________________________________ Work BATHROOM REMODEL Address; 841 CASPERS ST Owner ; SHURTS ------------------------------------------- Approved Date : 09/02/2021 ------------------------------------------ Building Official Erl,& CO-r �- Permit Number BLD2021-1107 Yard - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - ;This permit does not include any structural alterations. If structural alterations are required, plan revisions Site Plan will hP rPnuirPci_ t 1 SCALE: 1/16" = 1'-0" 1 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ I -.7 ECEIVED Aug 17 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT -b- 14722 32nd Ave NE Shoreline, WA 98155 10464 REGISTERED CHITECi TOD REDMICPOLISKIN ATEOFWASHINU`TON >Q N C Ct E LU �C NNN Cl) C I.fi N o y U = V/ Co Permit Set 08.03.21 Cover Sheet SCALE: As Noted DRAWN BY: TT JOB NO: SR01 SHEET A0.0 S AND AT O DIAMETER OR ROUND ABV. A.C. ABOVE AIR CONDITIONING A.,T. ADJ. A.F.F. ALT. ACOUSTICAL CEILING TILE ADJACENT OR ADJUSTABLE ABOVE FINISHED FLOOR ALTERNATE A.P. APPROX, ARCH. ACCESS PANEL APPROXIMATE ARCHITECT(URAL) BLDG. SLKG. SD. aM. BUILDING BLOCKING BOARD BEAM BOT. CAB. G.G. BOTTOM CABINET CORNER GUARD CJ. C.L. CONTROL JOINT CENTERLINE CLR. CLEAR CLG. CLO. CEILING CLOSET C.O. C.M.U. CLEANOUT OR CASED OPENING CONCRETE MASONRY UNIT CONC CONCRETE CONST. CONT. CONSTRUCTION CONTINUOUS COL CPT. COLUMN CARPET CT. C.W. COLLAR TIE CO NTRACTORSUPPLIED, D. CO NTRACTORINSTALLED COLD WATER DRYER DTL DIAM. DIM, DR DWG. D.F. DISP. DETAIL DIAMETER DIMENSION DOOR DRAWING DOUGLAS FIR OR DRINKING FOUNTAIN DISPENSER (E), EXIST. EA EL., ELEV. ELEC. EP, EXISTING EACH EVATION ELELECTRICAL ELECTRICAL PANELBOARD EQ. EQUIP, EXT. EQUAL EQUIPMENT EXTERIOR FB,O. FURNISHED BY OTHERS F.D. FF. FT. FLOORDRAIN FINISHED FLOOR FEET FLR. FLUOR. F.O.F. FLOOR FLUORESCENT FACE OF FINISH F O.S. FIN. FACE OF STUD FINISHIED) F.S.E.C. FR,R FO. FOOD SERVICE EQUIP. CONTRACTOR FIBERGLASS REINFORCED PANEL FACE OF GAUGE G.C. R C OIL.GLAZING, GENERAL CONTRACTOR GLASS FIBER REINFORCED CONCRETE GLASS G.S.M. GYP, G.W.B. GALVANIZED SHEET METAL GYPSUM GYPSUM WALL BOARD H—R. HORIZ. I.E. INT. INSUL HARDWARE HORIZONTAL INSIDE EDGE INTERIOR INSULATION K.E.C. KITCHEN EQUIPMENT CONTRACTOR MAX. MECH. MAXIMUM MECHANICAL MIN. MTD. MTRL MTL. MINIMUM MOUNTED MATERIAL METAL N N.I.C. N.T.S. NOT CONTRACT NOT TO SCALE OI O.G. OVER ON CENTER O.E. S. O.C.I OUTSIDE EDGE OWNER SUPPLIED, CONTRACTOR INSTALLED P.B.O. PL P.LAM. PROVIDED BY OWNER PLATE PLASTIC LAMINATE PLYWD. ID. REF. REG. R.D. PLYWOOD PAINTED REFRIGERATOR REGISTER ROOF DRAIN R.O. SAF ROUGH OPENING SELF ADHERING FLASHING SEC. SHT. SIM. SECTION SHEET SIMILAR SL/SKYLT. SO. ST.STL./B.S. S.S.D. SKYLIGHT SQUARE STAINLESS STEEL SEE STRUCTURAL DRAWINGS TSG TB.D. TEL TREAD TONGUE AND GROOVE TO BE DETERMINED TELEPHONE TEMP. THRU T.O. TYP. TV TEMPERED THROUGH TOP OF TYPICAL TELEVISION U.L. LON. V RT V.I.F. UNDERWRITER'SLABORATORY UNLESS OTHERWISE NOTED VERITICAL VERIFY IN FIELD V.G. W. wl VERTICAL GRAIN WASHER WITH W.C. wD. WATER CLOSET WOOD Wll WIO WITHIN WITHOUT WP. WSCT. W.H. WATERPROOF WAINSCOT WATER HEATER Abbreviations/Graphic Symbols u KEY NOTE: OSEE LEGEND ON DRAWINGS FOR EXPLANATION OF EACH NOTE. DATUM REFERENCE: ELEVATION, WORK OR CONTROL DOOR SYMBOL: O DOOR MARK OR SEQUENCE NUMBER WINDOW SYMBOL: O WINDOW MARK OR SEQUENCE NUMBER F-I FINISH NOTE REFERENCE P-I PLUMBING SYMBOU REFERENCE A I APPLIANCE SYMBOU REFERENCE T-II, I S/e" I, DIMENSIONS: FACE OF FINISH 2'-I CENTERLINE ' I 1 5pj 18" CLR (CLR./ MINIMUM CLR.) ALIGN ALIGN FINISH SURFACES FFI FF2 CHANGE IN FINISH FLOOR MATERIALS 1 AS sHSTrvo. 1 A5 SHEET rvO. E11. rv0. 1 I A5 3 4 rvo. Ai SHEET No. PROJECT ACTUAL NORTH NORTH REVISION REFERENCE SECTION REFERENCE ELEVATION REFERENCE COMBINED INTERIOR ELEVATION MARKER DETAIUSECTION REFERENCE ENLARGED PLAN/ DETAIL REFEFERENCE ENLARGED ELEVATION NORTH ARROW Upper Level Demo Plan SCALE: 1/4" = 1'-0" Scope of Work /�— (E) 0 (E) Wall C____j Demo Wall Note: All Walls To Be Removed Are Non Load Bearing RECEIVED Aug 17 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT NORTH ID 14722 32nd Ave NE 7G4c4 REGISTER'D CHITECT 70151 EDERICPOLIBKIN ATEOFWASHINGTDN Q 1n 0 LJ IA � y U V / 00 i=1110 Demo Plan SCALE: As Noted DRAWN BY: TT JOB NO: SR01 SHEET Al ll Safety Glass (tempered) Is Required Per IBC 2406.3 - All Safety Glazing As Per Sec. 2406 Of 2018 IBC. -Glazing Is Located Within A 24" Arc of a Door's Vertical Edge and Less Than 60" To Finished Floor -Glazing Is Fixed In Swinging or Sliding Door Assemblies -Glazing Is Located Less Than 18" Above Finished Floor -Glazing At Tub/shower Enclosures Where Glazing Is Less Than 60" From Tub/shower Enclosure's -Glazing Adjacent To Stairways Landings or Ramps Which Is Less Than 60" Above The Plane of The Adjacent Walking Surface. B. Shower South Wall Elevation Scope of Work /�— (E) %I° A. Bedroom South Wall Elevation 14'-7 1/2" \ 13'-7 1/2" \ \I (E) Bedroom °� AA V I 2'-10" FF (N) Walk -In Closet I Note: All New Walls Are Non Load Bearing RECEIVED Aug 17 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT -6 - 14722 32nd Ave NE Shoreline, WA 98155 G464 GI"TR'D CNITECT TEIMUSKIN Jjjjjjjjj.j.jjDjj11j. jIllinj STATEOFWASHINGTDN Q L w t0 � �N , E�Cn Q L U a� t Do Permit Set 08.03.21 New Floor Plan SCALE: As Noted DRAWN BY: TT JOB NO: SR01 SHEET Notes u New Upper Level Floor Plan SCALE: 1 /4" = V-0" A2.0 Section R314 Smoke Alarms: Smoke Alarms Shall Comply with NFPA 72 and Section R314 Section R314.1.1 Listings: Smoke Alarms Shall Be Listed In Accordance with ILL 217. Combination Smoke and Carbon Monoxide Alarms Shall Be Listed In Accordance with UL217 and ILL 2034. Section R314.2.2 Alterations, Repairs and Additions: Where Alterations, Repairs or Additions Requiring a Permit Occur, or Where One or More Sleeping Rooms are Added or Created in Existing Dwellings, the Individual Dwelling Unit Shall Be Equipped with Smoke Alarms as Required For New Dwelling Units. Section R314.3 Locations: Smoke Alarms Shall Be Installed In The Following Locations: 1. In Each Sleeping Room 2. Outside Each Separate Sleeping Area In The Immediate Vicinity of Bedrooms. 3. Smoke alarms Shall be Installed Not Less Than 3 Feet Horizontally From The Door or Opening of a Bathroom That Contains a Bathtub or shower Unless this Would Prevent Placement of a Smoke Alarm Required By Section R314.3. Section R314.4 Interconnection: Where More Than One Smoke Alarm Is Required To Be Installed within an Individual Dwelling Unit in Accordance with Section r314.3, The Alarm Devices Shall Be Interconnected in such a Manner that the Actuation of One Alarm Will Activate All of the Almrms in the Individual Dwelling Unit. Phyiscal Interconnection of Smoke Alarms Shall Not Be Requird Where listed Wireless Alarms Are Installed and All Alarms Sound Upon Activation of One Alarm. Section R314.5: Combination Alarms: Combination Smoke and Carbon Monoxide Alarms Shall Be Permitted to be Used in Lieu of Smoke Alarms. Section R315 Carbon Monoxide Alarms: Carbon Monoxide Alarms Shall Comply with Section R315. Section R315.1.1 Listings: Carbon Monoxide alarms Shall Be Listed In Accordance with UL 2034. Section R315.2.2 Alterations, Repairs and Additions: Exisitng Dwellings Shall Be Equipped with Carbon Monoxide Alarms in Accodance with R315.2.1. An Inspection Will Occur Where Alterations, Repairs or Additions Requiring a Permit Occur, or Where One or More Sleeping Rooms are Added or Created. Section R315.3 Location: Carbon Monoxide Alarms in Dwelling Units Shall be Installed Outside Each Separate Sleeping Area In The Immediate Vicinity of the Bedrooms on Each Level of the Dwelling Unit and In Accordance with the Manufacturers Recommendations. Where Fuel-Buming Appliance is Located within a Bedroom or its Attached Bathroom, a Carbon Monoxide Alarm Shall be Installed within the Bedroom. Section R315.6 & R315.5 Power Source: Smoke Alarm and Carbon Monoxide Alarms Shall Receive their Primary Power from the Building Wiring where such Wiring is Served from Commercial Source and, where Primary Power is Interrupted, Shall Receive Power from Battery. Wiring Shall Be Permanent and Without a Disconnecting Switch Other Than Those Required For Overcurrent Protection. Electrical Notes u �................ .. .. .. .. .. .. .. .. .. .. .. .. .. .. .I Interconnected Smoke Alarms Are A Requirement; Of This Permit In Accordance With R314.2.2 New Upper Level RCP/Electrical Plan SCALE: 1/4" = V-0" minimum 50 CFM local exhaust fan crr,r,o -f W.,L-U �nl.;r- rl_----------------- VED 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 01 t2 14722 32nd Ave NE Shoreline' WA 98155 kub ' �11I"TER'DCHITECTTOO IC POLISKIN SiATEOFWASHINGTON Q U c E V w a� N a� � � Q fn � L U Permit Set 08.03.21 RCP/Electrical SCALE: As Noted DRAWN BY: TT JOB NO: SR01 SHEET Alm 1 WINDOW SCHEDULE: WINDOW NO. O/ LOCATION ROOM SIZE WzH R.O. TYPE GLAZING / DUAL PANE LOW E. QTY REMARKS A NORTH WALL MASTER BATHROOM 18"x (E) FIXED X 1 Match (E) Windows DOOR SCHEDULE: DOOR NO. OLOCATION ROOM SIZE WzH R.O. TYPE TEMP. QTY REMARKS 01 NORTH WALL HALLWAY (2) 18", 80' NFold 1 Undercut Door 1' 02 ENTRANCE MASTER BEDRROM 32". 80" Inward Swing X 1 Translucent Glass French Door 03 MASTER BATHROOM 34". 80" Barn Door X 1 Translucent Glass French Door LIGHTING FIXTURE SCHEDULE FIXTURE NO. F# TYPE MODEL NUMBER /MFGT LOCATION MOUNTING LAMP QTY HT. REMARKS F1 CAN TBD MASTER BATHROOM WID CLOSET CEILING MTD. 3000K LED 3 F2 FAN/LIGHT TBD MASTER BATHROOM CEILING MTD. 3000K LED 1 50 ica Fan ffica High Ecy Fixture F3 CAN TBD MASTER SHOWER CEILING MTD. 3000K LED 1 Waterproof PLUMBING FIXTURE SCHEDULE Showerhead Shall Be Rated at 1.75 GPM or Less. and Lavatory Faucets Shall Be Rated at 1.0 GPM or Less PLUMBING NO. ITEM LOCATION ROOM FIXTURE QTY REMARKS O MFGR MODEL P-1 SINK: 38"x21"VANITY BATHROOM T.B.D. 1 Owner To Select Fixtures P-1b SINK FAUCET BATHROOM T.B.D. 1 Owner To Select Fixtures P.3 SHOW ER PAN 38'D x 48"W MASTER BATHROOM T.B.D. 1 Owner To Select Fixtures P-3b SHOWER HEAD MASTER BATHROOM T.B.D. 1 Owner To Select Fixtures P"3c SHOWER MIXTURE MASTER BATHROOM T. D. 1 Owner To Select Fixtures Note: All Finishes To Be Selected By Owner RECEIVED Aug 17 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Shoreline, WA 98155 REGISTERED CH1TL-CT TOD REDERIC POLISKIN ATEOFWASHINGTDN =r,=.R == >Q /n C O V -0 L s= w � NNy E I.L � to � y s_ /n Q- U (D Issue Name Permit Set Date 08.03.21 Schedules SCALE: CHECKED BY: TT JOB NO: SR01 SHEET A3.0