BLD2021-1252+Application+9.9.2021_10.52.39_AM+2392742CITY OF EDMONDS nnyst,ilaingPermit.com
Building Application #1014999 - Bathroom Addition
Applicant
First Name Last Name Company Name
Timm Bischoff
Number Street Apartment or Suite Number E-mail Address
23405 92nd Ave W timmbischoff@yahoo.com
City State Zip Phone Number Extension
Edmonds WA 98020 7272396968
Contractor
Company Name
Contractor Unknown
Number Street Apartment or Suite Number
City
State
Zip
Phone Number Extension
State License Number
License Expiration
Date UBI #
E-mail Address
Project Location
Number Street Floor Number Suite or Room Number
23626 84TH AVE W
City Zip Code County Parcel Number
EDMONDS 98026 00463300100101
Associated Building Permit Number Tenant Name
Additional Information (i.e. equipment location or special instructions).
Work Location
Property Owner
First Name Last Name or Company Name
Timm Bischoff
Number Street Apartment or Suite Number
23626 84th Ave W
City State Zip
EDMONDS WA 98026
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 9/9/2021 Submitted By: Timm Bischoff
Page 1 of 2
i
CITY OF EDMONDS MyBuildingPermit.com
Building Application #1014999 - Bathroom Addition
Project Contact
Company Name:
Name:
Address:
Timm Bischoff
23405 92nd Ave W
Edmonds WA 98020
Project Type
Single Family Residential
Email: timmbischoff@yahoo.com
Phone #: 7272396968
Activity Type Scope of Work
Remodel Residence
Project Name: Bathroom Addition
Description of Work: Add Bathroom to existing Area
Project Details
Mechanical Included?
Mechanical work will occur during this project.
Plumbing Included?
Plumbing work will occur during this project.
Work Location
Work Description/Location (example: 1st floor,
Master Bath, Garage)
Valuation
Fair Market Value of Remodeling Work
Exterior Changes?
The work involves changes to the exterior
1st Floor, Bathroom, hallway,
$2,000
Page 2 of 2