APPROVED BLD2021-1290+Transportation_Impact_Form+11.23.2021_12.21.20_PM+2535777 (Approved by Bertrand H)RESUB
Nov 23 2021 of r oA
CITY OF EDMONDA
DEVELOPMENT SE S �.
' C.. 18
PERMITTING & DEVELOPMENT
ENGINEERING
DIVISION
121 5th Avenue N
P: 425.771.0220
BLD2021-1290 Approved b:
APPENDIX A
11 /30/21 Page 1 of 2
Transportation Impact Analysis
Worksheet
Name of Proposed Project: MIKE'S PLUMBING - T.I.
Owner/Applicant
BLAKE BETHARDS
Name
2130 6TH AVE W.
Applicant Contact Person:
BLAKE BETHARDS
Name
2130 6TH AVE W.
Street/Mailing Address Street/Mailing Address
SEATTLE WA. 98119 SEATTLE WA. 98119
City
Telephone: 310-463-1013
State Zip City
Telephone: 310-463-1013
State Zip
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
Heath & Associates, Inc. Aaron Van Aken P.E., PTOE
Firm Name
Telephone: 253-770-1401
1. PROJECT DESCRIPTION
Contact Name
E-mail: avanaken@heathtraffic.com
a. Location - Street address: 21010 70th ave W. Edmonds, Wa. 98026
(Attach a vicinity map and site plan.)
b. Specify existing land use: doggie day-care facility - 6,828 sf
c. Specify proposed type and size of development: office for plumbing business - no on -site customers
6,828 sf (# of residential units and/or square footage of building)
d. Date construction will begin and be completed: Est. start: Dec. 10 2021 - completion Feb 20 2022
e. Define proposed access locations: no change from existing - access from west side of
70th ave W.
HANDOUT UPDATED 03.24.2021
APPENDIX A
Page 2 of 2
£ Define proposed sight distance at site egress locations: no change from existing condition
there are no obstructions limiting line of site at egress locations.
2. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts.
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified
in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC
18.82.130.
❑ CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If
the previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used.
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
vfp, etc.
New Use $ X
Prior Use $ X =
New Use Fee: $ - Prior Use Fee: $
❑ NEW DEVELOPMENT
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
vfp, etc.
New Use $ X
VOHANGE
DEPENDENT FEE CALCULATION
MITIGATION FEE RECOMMENDATION:
$
0
INDEPENDENT FEE CALCULATION: $240.00 (+ consultant fee)
$
240
TOTAL TRANSPORTATION IMPACT FEE
$
240
City of Edmonds, Engineering Division Approval
Date
' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.
HANDOUT UPDATED 03.24.2021