Loading...
APPROVED BLD2021-1290+Transportation_Impact_Form+11.23.2021_12.21.20_PM+2535777 (Approved by Bertrand H)RESUB Nov 23 2021 of r oA CITY OF EDMONDA DEVELOPMENT SE S �. ' C.. 18 PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 BLD2021-1290 Approved b: APPENDIX A 11 /30/21 Page 1 of 2 Transportation Impact Analysis Worksheet Name of Proposed Project: MIKE'S PLUMBING - T.I. Owner/Applicant BLAKE BETHARDS Name 2130 6TH AVE W. Applicant Contact Person: BLAKE BETHARDS Name 2130 6TH AVE W. Street/Mailing Address Street/Mailing Address SEATTLE WA. 98119 SEATTLE WA. 98119 City Telephone: 310-463-1013 State Zip City Telephone: 310-463-1013 State Zip Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Heath & Associates, Inc. Aaron Van Aken P.E., PTOE Firm Name Telephone: 253-770-1401 1. PROJECT DESCRIPTION Contact Name E-mail: avanaken@heathtraffic.com a. Location - Street address: 21010 70th ave W. Edmonds, Wa. 98026 (Attach a vicinity map and site plan.) b. Specify existing land use: doggie day-care facility - 6,828 sf c. Specify proposed type and size of development: office for plumbing business - no on -site customers 6,828 sf (# of residential units and/or square footage of building) d. Date construction will begin and be completed: Est. start: Dec. 10 2021 - completion Feb 20 2022 e. Define proposed access locations: no change from existing - access from west side of 70th ave W. HANDOUT UPDATED 03.24.2021 APPENDIX A Page 2 of 2 £ Define proposed sight distance at site egress locations: no change from existing condition there are no obstructions limiting line of site at egress locations. 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. ❑ CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, vfp, etc. New Use $ X Prior Use $ X = New Use Fee: $ - Prior Use Fee: $ ❑ NEW DEVELOPMENT Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, vfp, etc. New Use $ X VOHANGE DEPENDENT FEE CALCULATION MITIGATION FEE RECOMMENDATION: $ 0 INDEPENDENT FEE CALCULATION: $240.00 (+ consultant fee) $ 240 TOTAL TRANSPORTATION IMPACT FEE $ 240 City of Edmonds, Engineering Division Approval Date ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. HANDOUT UPDATED 03.24.2021