Loading...
APPROVED BLD BLD2021-1341+Architectural_Plan+9.29.2021_11.20.40_AM+243507222050 99th Place West Edmonds, WA 98020 Home Owners: Matthew Hart + Bethany Childress 206-979-4315 childresshart@gmail.com ChildressHart Home September 27, 2021 PROPERTY INFORMATION Property Address 22050 99TH PL W, EDMONDS, WA 98020-4540 Parcel Number 00602100100700 Property Description TWIN VIEW ESTATES DIV 1 PROJECT DESCRIPTION BLK 001 D-00 - LOT 7 BLK A Primary Bath Remodel & Primary Bedroom Entry revised (closet added & entry relocated), Miscellaneous Exterior Walls opened (wall panel removed) for electrical rewire - insulation being replaced where wall opened. Adding non-structural walls at Rec Room and in Basement for an mud room / storage and den. Please note mechanical and plumbing work is being performed under separate permits, see permit numbers below: BLD2021-0971 - Gas Piping BLD2021-0972 - Plumbing for new hot water heater and multiple fixture replacements BLD2021-1278 - Master Bath Remodel (Plumbing Only) BLD2021-1302 - Furnace Replacement (old furnace - heating oil, new furnace - natural gas) Other Work Existing Oil Tank Removal Permit for Oil Tank Removal under Fire Department = FIR2021-078 — Work Completed and Inspected Electrical Rewire Permit for Electrical Rewire under LNI = 3619910E - Work Complete and Awaiting Final Inspection PROJECT CONTACT Matthew Hart CHI LDRESSHART(o-)-GMAI L.COM 206-979-4315 Updates: September 29, 2021 - Added information about Smoke Detectors and Carbon Monoxide Detectors to plans. Space in basement labeled "open" revised to say gym. APPROVED PLANS MUST BE ON JOB SITE OBTAIN ELECTRICAL PERMIT FROM STATE LABOR & INDUSTRIES ALL WORK SUBJECT TO FIELD INSPECTION FOR CODE COMPLIANCE City Of Edmonds Building Department Work INTERIOR REMODEL Address 22050 99TH PL W Owner HART ---------------------------------- --------------------------------- Approved Date 10/14/2021 Building Official ; W. X --------------------------------------------------------- Permit Number: BLD2021-1341 RECEIVED Sep 30 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Page - 1 of 6 .�''''', I t#** ♦j • 'Existing =Rec Room • 23' x 19,5' 445 sf 40 • 0 5'-0" Existing Hall 60' Existing Garage 23' x 23' 530 sf Page -2of6 Level 1: Existing Plan -Repair, infill sub floor Non-structural wall removed. adjacent hallway wall to be extended existing closet Existing Bedroom 11' x 11' 120 sf existing closet o Existing °' Hall Existing Bedroom 9,5' x 11' 100 sf existing closet existing closet — T-0" xlst Hall 36' L (xisting Closet 7' x 15' 110 Sf Existing ih Hall O Existing Bath 7 x 7 J 45 sf existing closet ■ Existing Living Room 16' x 19' 300 sf Refer to photograph set A on page 6 for additional information 1■ Existing Kitchen 9' x 15.5' 140 sf Existing Dining 7.5' x 8' 60 sf Existing Closet 4' x 7.5' 30 sf Existi B h 5' x 14' 110 sf 0 Existing Shower 3-.5' x 4.5' 15 s� Existing Breakfast 6' x 7' 40 sf Existing Deck M scale = 114" Remove low/partial wall Remove tub Existing Bedroom 17' x 23,5' 400 sf Refer to photograph set C on page 6 fo additional information Repair damaged wall -Remove shower Existing to be removed or repaired RECEIVED Sep 30 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 22050 99th Place West Edmonds, WA 98020 Home Owners: Matthew Hart + Bethany Childress September 27 2021 North 206-979- 4315 Se p , childresshartart@gmail.com Add door to bedroom Add non-structural walls for closet scale = 114" Repair/infill sub floor Smaller Rec Room 15' x 19.5' - . 290 sf Add non-struct wall New Entry 7.5' x 19.5' 245 sf 5'-0" Existing Hall Existing Garage 23' x 23' 530 sf Page -3of6 Level 1: New Plan M existing closet Existing Bedroom 11' x 11' 120 sf existing closet o Existing "' Hall Existing Bedroom 9.5' x 11' 100 sf Existing Closet 4' x 7,5' e w 30 sf /set Non-structural w ' I = New Non-structural wall infill + dM or S Existing Hall Bedroom 17' x 23.5' 400 sf Add partial height furring wall New New tub Laundry WAD 3.5' x 8.5' L�' 30 sf Existing Convert tub to tile shower Bath 0 8.5' x 14' (add non-structural wing walls) existing O 110 sf closet C O CDO Add non-structural furring wall to align O Existing Bath with existing 7' x 7' 45 sf 2-1 existing ,elocatec closet t R-15 batt insulation to be installed at S x 4. 15 f location where exterior wall is opened for existing 15 s CIO O plumbing / electrical work — T-0" xlst Hall L Existing Kitchen 9' x 15.5' 140 sf Existing Breakfast 6' x 7' 40 sf Repair water damaged wall, add door Relocate toilet S *Smoke Detector Existing Dining 760 sf8" S� *Smoke Detector / Carbon Monoxide Combo Existing New R-15 batt Deck i insulation locations Existing Living Room New walls / doors 16' x 19' 300 sf Notes *All smoke detectors and smoke / carbon monoxide detectors were installed in July 2021 and inspected by L&I. The detectors are all wired together. RECEIVED 22050 99th Place West Sep 30 2021 Edmonds, WA 98020 _ CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Home Owners: Matthew Hart + Bethany Childress September 27 2021 North 206-979- 4315 Se p , childresshartart@gmail.com scale = 114" Existing paneling removed for repair (electrical re -wire) Page - 4 of 6 Basement: Existing Plan noved or :D ES ��....,..,.,......�ce West Edmonds, WA 98020 Home Owners: Matthew Hart + Bethany Childress September 27 2021 North 206-979- 4315 Se p , childresshartart@gmail.com scale = 114" R-15 batt insulation to be installed at location where exterior wall is opened for plumbing / electrical work Page -5of6 Basement: New Plan Sep 30 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Combo is -s and smoke detectors ly 2021 and he detectors er. ��.,..,..,.,......�ce West Edmonds, WA 98020 Home Owners: Matthew Hart + Bethany Childress September 27, 2021 North I 206-979-4315 childresshart@gmail.com *Photograph Set A Existing Hallway Wall Location of removed wall Photograph Set B Photograph Set C Page -6of6 Supplemental Information r=vic+inn I- n11Xni0Xi \Noll Location of removed wall Location of removed wall - wall not attached to any joists - wall runs parallel to joist - top plate running below 1 x4 that is used for ceiling finish rea of wall to be removed krea of wall to be remain Water damage discovered during shower removal. wall to be repaired / replaced. Existing Hallway Wall w Location of removed wall - wall not attached to any joists - wall runs parallel to joist 2x4 in photograph added for patching ceiling Location of removed wall - wall not attached to any joists - wall runs parallel to joist - top plate running below 1x4 that is used for ceiling finish Floor Joist Floor Joist RECEIVED Sep 30 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT SeDtember 27. 2021 Location of removed wall - wall not attached to any joists - wall runs parallel to joist Notes *Blown -in Insulation (R-49) to be installed in the attic after work above ceiling is complete. 22050 99th Place West Edmonds, WA 98020 Home Owners: Matthew Hart + Bethany Childress 206-979-4315 childresshart@gmail.com