Loading...
APPROVED ENG PLN RESUB 1-Site PlanIf addition is constructed over sewer line, contractor/owner shall ° verify/install a cleanout within 2' of the structure. Verify cleanout accessibility with building LO LO inspector. +I N N Zone RM-3 (RS-6 Corner Flag setbacks) Setbacks: Required Actual Front 20 22 East 5 6 West 5 7.6 15 42 Rear 25 No Height Change Pursuant to ECDC 16.30.030, footnote 2;-R` -6 setbacks may be used for single-family homes on lots of 10,000 square feet or less. APPROVED BY PLANNING 9© Nov 08 2021 W - \* 41 pP! __ _ _ _ _ _ -1 ST C�V .......... hTl.6 MIL I I �C7PAGE] I < ' I 5� I 201 st STREET SW SITE PLAN SCALE: I"- 20' OWNER/S: SAND YAECOB E GENET CAE ADDRESS: 7615 201ST STREET SW EDMIONDS , WA 98026 - 6837 PARCEL ID: 00407 700100601 ZONING: PS - 8 IMPERVIOUS SURFACE CALCULATIONS: EXISTING HOUSE w/ ROOF OUTLINE= ±2066 SF. EXISTING DECK = 161 SF EXISTING STORAGE = 80 SF. EXISTING DRIVEWAY= 7 69 SF. J NEW ALTERED STRUCTURE = 5 7 0 SF R - NEW BATHROOM ADDITION w/ ROOF= 132 SF TOTAL IMPERVIOUS SURFACE= ±3868 SF LOT COVERAGE: tn LOT AREA= ±9148 SF N EXISTING HOUSE= ± 1582 SF. STORAGE = 80 SF +, EXISTING STRUCTURE ALTERATION = ±57 0 SF. NEW BATHROOM ADDITION= 100 SF TOTAL EXISTING + NEW ALTERATION= ±2332 SF 2332/9148= 25% MAX. =45% Nothing in the permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, structure or site condition which is outside the scope of the permit application, regardless of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. BEST ♦ • e=M\ET PPACTICES ON EPOSICN AND SEDIN4ENT OONTPCL Sk4LL- - • ED • •CCU- ED -SOIL -• • TO BE OON:9NED TONECCESAPY. PAINY SEASON•• EP Crl-•OEM APEAS WTH • MLTHK. PLASTIC♦ • •-ED ♦-♦GS ON ♦ • CPID PLACE .♦ BALES Pcssia-E WATER DISCkAPGE. - -PPEVENT DIPT FROM BEING CAPPED AWAY ON VE14CLE TIPES. AND •- IED VMTP PETAINII\G♦1\6 ft-EPE APPLICABLE. OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. ALL DISTURBED SOILS SHALL BE COMPOST AMENDED PER CITY OF EDMONDS STANDARD DETAIL SD-642 OR APPROVED EQUAL. OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. ENGINEERING DIVISION APPROVED AS NOTED 11 /17/2021 RESUB Nov 04 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT