Loading...
APPROVED-ENG-BLD2021-1711+Transportation_Impact_Form+12.17.2021_3.14.34_PM+2580548APPENDIX A Page 1 of 2 Transportation Impact Analysis Worksheet PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 Name of Proposed Project: Owner/Applicant C�L ., ' Name _I Z 1 5 11,` five Street/Mail' v Address City State Zip Telephone: _ qZ S t ce- Applicant Contact P rson: Nance 7/10 0-40 .fit— Sc, Stree aililag Address faf��4s "Aik 7ro­cp City State Zip Telephone: �/?, S Z_ -� 5 — q 15 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Contact Name Telephone: E-mail: 1. PROJECT DESCRIPTION a. Location -Street address: ?� qvf�,t _Z JI_� JS> NA; �� (Attach a i4einity map and site plan.) b. Specify existing land use: g c. Specify proposed type and size of development: v�, Q of residential units an yr square footage of building) _ l d. Date construction will begin and be completed: G 20 �r e. Define proposed access locations: cn HANDOUT UPDATED 09.02.2021 APPENDIX A Page 2 of 2 f. Define proposed sight distance at site egress locations: 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC 2 24 12n CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 impact fee rate shall be used. Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, vfp, etc. New Use $ X Prior Use 1 $ X New Use Fee: $ - Prior Use Fee: $ $ NEW DEVELOPMENT ITE Land Use Category New Use Per Unit Fee Rate $ �X Units in square feet, # of dwelling, vfb, etc. Fee O CHANG EXISTING SHOPPING CENTER LAND USE - NO CHANGE INDEPENDENT FEE CALCULATION MITIGATION FEE RECOMMENDATION: $ INDEPENDENT FEE CALCULATION: $240.00 (+ consultant fee) $ TOTAL TRANSPORTATION IMPACT FEE $ 0.00 ENGINEERING DIVISION APPROVED AS NOTED City of Edmonds, Engineering Division Date e1 /06/2022 ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. HANDOUT UPDATED 09.02.2021