Singleton SFR - DFR 5-28-21�rT imOA= GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION May 27, 2021 Mr. Keith Singleton (E-Mail) 508 2nd Avenue N. Edmonds, WA 98020 RE: CONSTRUCTION TESTING AND INSPECTION Singleton SIR 508 2' Avenue N. Edmonds, Washington Dear Mr. Singleton, KA No. 096-21213 Permit No. BLD2021-0279 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully NC. f Project M�VagOlAbManakr Pacific ost Division CWM/lkj C.C. CITY OF EDMONDS 4303 198t' Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09621213 DFR Page 1 of 1 Krazan 8tAssociates,lnc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection Field Report NO.: 096212135242021JLG DATE: 5/24/2021 Set Count: CONTRACTOR: PROJECT #: 09621213 PERMIT #: BLD2021-0279 PROJECT: Singleton SFR INSPECTOR: Jerry L. Gelder LOCATION: 508 211 Ave W Edmonds JURISDICTION: City of Edmonds KA P.M.: WEATHER: Overcast TEMP: 55° F Arrived onsite per contractors request to observe the installation of structural framing for remodel. Observed contractor had installed and nailed the framing per plans and specs except as noted below. Once the items are fixed contractor will contact Krazan to for re inspection. 1) 2) 31 3" SDS screws required at 36" o.c. through the steel beam into the blocking. ABU Post Base & 5/8" X 4" Strong Bolt 2 for new post at existing chimney concrete. Sheathing for diaphragm installed and nailed. ' Ta"! Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Knman & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. The test results apply only to the specific locations, and items inspected or tested. Page 1 of 1 �I�cazaj 8�Associates,Inc. Geotechrical Engineering . Environmental Engineering Construction Testing and Inspection Field Report NO.: 096212135262021JLG DATE: 5/26/2021 Set Count: CONTRACTOR: PROJECT #: 09621213 PERMIT #: PROJECT: Singleton SFR INSPECTOR: Jerry L. Gelder LOCATION: 508 2°d Ave N Edmonds JURISDICTION: City of Edmonds KA P.M.: WEATHER: Overcast TEMP: 55' F Arrived onsite per contractors request to perform re inspection of framing. Observed contractor had completed all the items from Report#09621213DFR5242021JLG per plans and specs. Observed contractor had installed insulation into the floor prior to installing and nailing the diaphragm. This Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and IGaran & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. The test results apply only to the specific locations, and items inspected or tested.