Loading...
Building PermitType: SOLAR Subtype: SOLAR RESIDENTIAL I Status: ISSUED Parcel No: 00434203500102 Site Address: 1002 WALNUT ST EDMONDS,WA 98020-3336 Subdivision: KELLOGG SUPPLEMENTAL PLAT OF EDMONDS, 004342 Lot: 0 Fire Sprinklers: Lot Area: Zoning: Valuation: $0.00 Occupancy Type: Construction Type: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: MILLER- ROOFTOP SOLAR WA State Contractor L & I #: Applied: 4/22/2022 Issued:4/22/2022 Final: Expiration Date: 10/19/2022 Issued by: NED CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT CHRISTIEN MILLER 1002 WALNUT STREET, (206)782-5869 CHRISTIENMILLER@GMAIL.COM EDMONDS WA 98020 CONTACT CHRISTIEN MILLER 1002 WALNUT STREET, (206)782-5869 christienmiller@gmail.com EDMONDS WA 98020 CONTRACTOR OWNER 1002 WALNUT ST, EDMONDS OWNER CHRISTIEN MILLER WA 98020 INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 4/22/22 R19713 PER PERMIT RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 4/22/22 R19713 SOLAR - SUB RES BLDG PERMIT FEE 001.000.322.10.000.00 $60.00 $60.00 4/22/22 R19713 SOLAR - SUB RES FIRE INSP FEE 001.000.342.40.000.00 $60.00 $60.00 4/22/22 R19713 TOTALS: $166.50 $166.50 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Friday, April 22, 2022 2:36:49 PM 1 of 2 SOLARPermit of Edmonds PERMIT NUM EdmondsCity 980i 1 1 1 www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. \r\n2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable.\r\n3- SOUND OR NOISE - Sound/Noise originating from temporary FOR construction sites as a result of construction activity are exempt from the noise limits of ALL BUILDING PERMITS INFORMATION ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.\r\n4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. \r\n5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647- 0982. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION Installation, use and maintenance of equipment and components shall be per EQUIPMENT USAGE FOR manufacturer's specifications, installation instructions, and applicable state codes. INFORMATION Provide manufacture's installation instructions on site for Building Inspector. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. INSPECTIONS-. •nline at: https://Inspection.MvBuildingPermit.co COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE X-1 FIRE FINAL X-3 BUILDING FINAL" Printed: Friday, April 22, 2022 2:36:49 PM 2 of 2