Loading...
Building PermitType: RESIDENTIAL BLDG Subtype: ALTERATION OR REMODEL I Status: ISSUED Parcel No: 00532500000300 Subdivision: 005325, 006397 Fire Sprinklers: Valuation: $300,000.00 Code Edition: 0 Site Address: 851 NORTHSTREAM LN EDMONDS,WA 98026 Lot: 0 Lot Area: Zoning: Occupancy Type: Construction Type: No. Stories: 0 # of Dwelling Units: 0 Scope of Work: SCHENCK- INTERIOR REMODEL m incl p sep Applied: 4/12/2022 Issued: 5/5/2022 Final: Expiration Date: 4/30/2023 Issued by: NED I WA State Contractor L & I #: BLUESSC948NA I CONTACTS NAME TYPE NAME ADDRESS I PHONE EMAIL APPLICANT NICOLE TAYLOR 2265 NW 56TH ST, SEATTLE WA (206)335-1211 NICOLE@MAKEDESIGNSTUDIOLLC.CO 98103 M CONTACT MAKE DESIGN STUDIO 2265 NW 56TH ST, SEATTLE WA (206)335-1211 nicole@makedesignstudiollc.com 98103 CONTRACTOR BLUE SOUND CONSTRUCTION 11312 20TH AVE NE, SEATTLE (206)854-6042 WA 98125 DARIUS S & COSTAS KIM 851 NORTHSTREAM LN, OWNER SCHENCK I EDMONDS WA 98026 •' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 -BASE FEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 5/4/22 R20004 PERMITS APPLIANCE VENTS 001.000.322.10.000.00 $15.00 $15.00 5/4/22 R20004 CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 4/26/22 R19766 PER PERMIT FAN CONNECTED TO SINGLE DUCT 001.000.322.10.000.00 $90.00 $90.00 5/4/22 R20004 GAS PIPING - NEW OR LOCATED 001.000.322.10.000.00 $30.00 $30.00 5/4/22 R20004 PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $2,300.00 $2,300.00 5/4/22 R20004 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $1,955.00 $1,955.00 4/26/22 R19766 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 5/4/22 R20004 TOTALS: $4,486.50 $4,486.50 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Thursday, May 05, 2022 9:04:35 AM 1 of 2 'RESIDENTIAL BLDG Permit of Edmonds PERMIT NUM EdmondsCity 98020 1 1 . . •. • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. \r\n2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable.\r\n3- SOUND OR NOISE - Sound/Noise originating from temporary FOR construction sites as a result of construction activity are exempt from the noise limits of ALL BUILDING PERMITS INFORMATION ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.\r\n4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. \r\n5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647- 0982. • MM • •- • COMPLETED ip C • •'- • SEQID INSPECTION TYPE INSPECTOR DATE A-1 BUILDING PRECON B-2 DEMO AMT VERIFICATION B-3 GAS PIPING TEST B-3 MECH ROUGH IN B-4 DRYWALL FASTENING B-4 FRAMING B-4 SHOWER PAN B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" Printed: Thursday, May 05, 2022 9:04:35 AM 2 of 2