Building PermitType: RESIDENTIAL BLDG Subtype: ALTERATION OR REMODEL I Status: ISSUED
Parcel No: 00532500000300
Subdivision: 005325, 006397
Fire Sprinklers:
Valuation: $300,000.00
Code Edition: 0
Site Address: 851 NORTHSTREAM LN EDMONDS,WA 98026
Lot: 0
Lot Area: Zoning:
Occupancy Type: Construction Type:
No. Stories: 0 # of Dwelling Units: 0
Scope of Work: SCHENCK- INTERIOR REMODEL m incl p sep
Applied: 4/12/2022
Issued: 5/5/2022
Final:
Expiration Date: 4/30/2023
Issued by: NED
I WA State Contractor L & I #: BLUESSC948NA I
CONTACTS
NAME TYPE
NAME
ADDRESS I
PHONE
EMAIL
APPLICANT
NICOLE TAYLOR
2265 NW 56TH ST, SEATTLE WA
(206)335-1211
NICOLE@MAKEDESIGNSTUDIOLLC.CO
98103
M
CONTACT
MAKE DESIGN STUDIO
2265 NW 56TH ST, SEATTLE WA
(206)335-1211
nicole@makedesignstudiollc.com
98103
CONTRACTOR
BLUE SOUND CONSTRUCTION
11312 20TH AVE NE, SEATTLE
(206)854-6042
WA 98125
DARIUS S & COSTAS KIM
851 NORTHSTREAM LN,
OWNER
SCHENCK
I EDMONDS WA 98026
•' •
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
1 -BASE FEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
5/4/22
R20004
PERMITS
APPLIANCE VENTS
001.000.322.10.000.00
$15.00
$15.00
5/4/22
R20004
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
4/26/22
R19766
PER PERMIT
FAN CONNECTED TO SINGLE DUCT
001.000.322.10.000.00
$90.00
$90.00
5/4/22
R20004
GAS PIPING - NEW OR LOCATED
001.000.322.10.000.00
$30.00
$30.00
5/4/22
R20004
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$2,300.00
$2,300.00
5/4/22
R20004
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$1,955.00
$1,955.00
4/26/22
R19766
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
5/4/22
R20004
TOTALS: $4,486.50
$4,486.50
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Thursday, May 05, 2022 9:04:35 AM 1 of 2
'RESIDENTIAL
BLDG Permit
of Edmonds PERMIT NUM
EdmondsCity
98020 1 1 .
. •. •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
\r\n2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.\r\n3- SOUND OR NOISE - Sound/Noise originating from temporary
FOR
construction sites as a result of construction activity are exempt from the noise limits of
ALL BUILDING PERMITS
INFORMATION
ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am
to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the
noise originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.\r\n4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. \r\n5 - PLUMBING - Plumbing contractor license laws are regulated by
Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the
risks and potential monetary liability for work performed by unlicensed plumbing
contractors. For more information contact L&I Department of Licensing at 1-800-647-
0982.
•
MM
• •- •
COMPLETED
ip C • •'- •
SEQID
INSPECTION TYPE
INSPECTOR
DATE
A-1 BUILDING PRECON
B-2 DEMO AMT
VERIFICATION
B-3 GAS PIPING TEST
B-3 MECH ROUGH IN
B-4 DRYWALL FASTENING
B-4 FRAMING
B-4 SHOWER PAN
B-5 INSULATION ENERGY
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
Printed: Thursday, May 05, 2022 9:04:35 AM 2 of 2