Loading...
Building Permit 2020DEMO Permit PERMIT NUM City of Edmonds IL www.edmondswa.gov Type: DEMO Owner/ Business: RNK EASTSIDE LLC Status: ISSUED Subtype: RES PRIMARY STRUCTURE DEMO Parcel No: 00463301000302 Site Address: 23830 EDMONDS WAY EDMONDS,WA 98026-9028 Applied: 1/23/2020 Subdivision: 004633, SP 635 (11-78) Lot: 0 Issued: 2/11/2020 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 8/9/2020 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: EDMONDS CROSSING- DEMO SFR pscaa#20200131 WA State Contractor L & I #: LZGCOCL873PP City of Edmonds Business License #: 602454996-001-0001 CONTACTS TO NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT HAYNES LUND 585 101ST AVE SE, BELLEVUE (425)643-3921 HWLARCH@COMCAST.NET WA 98004 CONTRACTOR LZG CONSTRUCTION LLC 2402 S 312TH ST, FEDERAL WAY (253)740-3303 LSGCONSTRUCTION@GMAIL.COM WA 98003 4580 KLAHANIE DR SE UNIT 177, OWNER RINK EASTSIDE LLC ISSAQUAH WA 98029 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 1/23/20 R2070 PER PERMIT DEMO - SUB RES BLDG PERMIT FEE 001.000.322.10.000.00 $100.00 $100.00 1/23/20 R2070 DEMO - SUB RES BLDG PLAN 001.000.345.83.000.00 $50.00 $50.00 1/23/20 R2070 REVIEW FEE DEMO - SUB RES ENG INSP FEE 001.000.341.82.000.00 $100.00 $100.00 1/23/20 R2070 DEMO - SUB RES ENG REVIEW FEE 001.000.341.82.000.00 $50.00 $50.00 1/23/20 R2070 TOTALS: $340.00 $340.00 CONDITION TYPE STATUS NOTES 48 HRS NOTICE-ENGR FINAL FOR 48 Hours notice is required when requesting your FINAL engineering inspection. NFORMATION Printed: Tuesday, February 11, 2020 10:06:45 AM 1 of 2 DEMO PerCity mit PERMITNUM • • • Ave N, Edmonds WA 98020 BLD2020-0105 www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision.\r \r\r\r\r\r 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such FOR requests shall be established by Council and shall be paid upon submittal and are ALL BUILDING PERMITS INFORMATION nonrefundable.\r\r\r\r\r\r 3 - SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120\r\r\r\r\r\r 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. Pre -inspection required. Street to be cleaned of debris. Side sewer must be capped at DEMOLITION REQUIREMENTS FOR property line. Water Service must be disconnected from Water Meter and or hose bib INFORMATION with AVB installed. Dump at approved dump site only. UNDERGROUND UTILITY FOR Call for locates of underground utilities prior to any excavation. LOCATES INFORMATION INSPECTIONSML COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE DEMO SWR CAP DEMO TESC DEMO WTR AVB DEMO WTR DISCON X-3 BUILDING FINAL" X-2 ENGINEERING FINAL Printed: Tuesday, February 11, 2020 10:06:45 AM 2 of 2