Loading...
APPROVED BLD2020-1332+STRUCTURAL PLANS+12.5.2020_1.46.51_PMCODE: INTERNATIONAL BUILDING CODE (IBC) 2015 LOADINGS FLOOR LIVE LOAD ..................................................... 40 PSF DECK LIVE LOAD ..................................................... 60 PSF ROOF SNOW LOAD ..................................................... 25 PSF WIND CRITERIA BUILDING CLASSIFICATION ............................... II ULTIMATE WIND SPEED ...................................... 110 MPH WIND EXPOSURE ........................................... B TOPOGRAPHIC FACTOR, Kzt................. 1.0 SEISMIC CRITERIA SEISMIC RISK CATEGORY .............................. II SPECTRAL RESPONSE COEFFICIENT, Ss .... 1.30 SPECTRAL RESPONSE COEFFICIENT, S1 .... 0.50 SEISMIC SITE CLASS .............................. D SEISMIC DESIGN CATEGORY ............................... D STRUCTURAL DESCRIPTIONS GENERAL CONDITIONS 1. THE CONTRACTOR SHALL EXAMINE THE STRUCTURAL DRAWINGS AND SHALL NOTIFY THE STRUCTURAL ENGINEER IN WRITING OF ANY DISCREPANCIES HE MAY FIND BEFORE PROCEEDING WITH THE WORK. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS AND SITE CONDITIONS BEFORE STARTING WORK. 2. ALL OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE WORKING DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE STRUCTURAL ENGINEER BEFORE PROCEEDING WITH ANY WORK SO INVOLVED. 3. SPECIFIC NOTES AND DETAILS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS. WHERE THE NOTES, DRAWINGS, AND/OR SPECIFICATIONS DIFFER, THE MORE STRINGENT REQUIREMENT SHALL APPLY. 4. IF A SPECIFIC DETAIL IS NOT SHOWN FOR ANY PART OF THE WORK, THE CONSTRUCTION SHALL BE THE SAME AS FOR SIMILAR WORK. 5. WORKING DIMENSIONS SHALL NOT BE SCALED FROM PLANS, SECTIONS, OR DETAILS ON THESE DRAWINGS. 6. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT AND THE STRUCTURAL ENGINEER OF ANY CONDITION THAT, IN HIS OPINION, MIGHT ENDANGER THE STABILITY OF THE STRUCTURE OR CAUSE DISTRESS TO THE STRUCTURE. 7. THE CONTRACTOR SHALL SUPERVISE AND DIRECT HIS WORK AND HE SHALL BE SOLELY RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES. PROVIDE ADEQUATE SHORING AND BRACING OF ALL STRUCTURAL MEMBERS DURING CONSTRUCTION. NOTIFY ENGINEER OF ALL FIELD CHANGES PRIOR TO INSTALLATION. 8. REFER TO THE ARCHITECTURAL DRAWINGS FOR INFORMATION NOT COVERED BY THESE GENERAL NOTES OR THE STRUCTURAL DRAWINGS. 9. ALL CONSTRUCTION SHALL BE DONE WITH MATERIALS, METHODS, AND WORKMANSHIP ACCEPTED AS GOOD PRACTICE BY THE CONSTRUCTION INDUSTRY AND IN CONFORMANCE WITH THE PROVISIONS OF PREVAILING CODE EDITION OF THE "INTERNATIONAL BUILDING CODE" (IBC) AND STANDARDS REFERENCED THEREIN. 10. PIPES, DUCTS, SLEEVES, OPENINGS, POCKETS, CHASES, BLOCK -OUTS, ETC., SHALL NOT BE PLACED IN SLABS, FOUNDATIONS, ETC., NOR SHALL ANY STRUCTURAL MEMBER BE CUT FOR SUCH ITEMS, UNLESS SPECIFICALLY DETAILED ON THESE STRUCTURAL DRAWINGS. 11. ALTERNATE ASSEMBLIES AND MATERIALS WILL BE CONSIDERED FOR REVIEW. ENGINEER MAY REQUEST PAYMENT FOR REVIEW. FOUNDATION 1. STRUCTURAL DESIGN COMPLIES WITH SOILS REPORT PRODUCED BY: N.A. FOOTING BEARING PRESSURE: 1500 PSF (ASSUMED) LATERAL EARTH PRESSURE ON RETAINING WALLS N.A. 2. SUBGRADE PREPARATION, DRAINAGE PROVISIONS, AND OTHER RELEVANT SOIL CONSIDERATIONS ARE TO BE IN ACCORDANCE WITH SAID SOILS REPORT. DIMENSIONAL LUMBER, ANCHOR BOLT AND NAILING SPECIFICATIONS 1. MEET REQUIREMENTS OF PS 20-70 AND NATIONAL GRADING RULES FOR SOFTWOOD DIMENSIONAL LUMBER. BEAR STAMP OF WWPA. 2. MINIMUM DIMENSIONAL LUMBER GRADES TO BE: WALL STUDS, 2X, 3 X........ HF STUD GRADE WALL PLATES, 2X, 3X........ HF STANDARD GRADE U.N.O JOISTS, 2 X 6: ............. HF #2 JOISTS, 2 X 8 AND UP....... DF #2 BEAMS, HEADERS, 6X ........ DF #2 BEAMS, HEADERS, 4X......... DF #2, WWPA GRADING POSTS, 4X, 6X.............. DF #2 U.N.O LUMBER NOT NOTED HERE... DF #2 U.N.O 3. PROVIDE STANDARD CUT WASHERS FOR BOLT HEADS AND NUTS BEARING AGAINST WOOD 4. ALL SILLS OR PLATES RESTING ON CONCRETE OR MASONRY THAT IS IN CONTACT WITH OR RESTING ON FOUNDATIONS SHALL BE PRESSURE -TREATED DOUGLAS FIR/ HEMFIR IN ACCORDANCE TO WITH AWPA U1 (PLANT/SHOP TREATMENT) AND M4 (FIELD TREATMENT) STANDARDS. ALL BEARING WALL PLATES SHALL HAVE 5/8" 0 x10" J-BOLTS PLACED AT MAXIMUM OF 9" FROM THE END OF A PLATE AND SPACED AT INTERVALS SHOWN ON THE SHEARWALL SCHEDULE (MAXIMUM 4'-0" OC SPACING). PROVIDE BP PLATE WASHER AT ALL FOUNDATION SILL PLATE ANCHOR BOLTS. PROVIDE TWO ANCHOR BOLTS MINIMUM PER SECTION OF SILL. FOR NON-SHEARWALL, PLACE ANCHORS AT 48". 5. BOLTS IN WOOD SHALL NOT BE LESS THAN 7 DIAMETERS FROM THE END AND 4 DIAMETERS FROM THE EDGE OF THE MEMBER. 6. NAILS: COMMON WIRE NAILS. NAILING IN ACCORDANCE WITH IBC TABLE 2304.9.1 7. PRESSURE TREATED WOOD: ALL NAILS INTO PT WOOD SHALL BE HOT DIPPED GALVANIZED PER ASTM A153 OR STAINLESS STEEL. ALL METAL CONNECTORS IN CONTACT WITH PT WOOD SHALL BE HOT DIPPED GALVANIZED AND MEET ASTM A653 CLASS G185 (1.85 OZ OF ZINC PER SQ FT MINIMUM) OR TYPE 304 / 316 STAINLESS STEEL SIMPSON Z-MAX CONNECTORS MEET THIS REQUIREMENT. FASTENERS AND CONNECTORS USED TOGETHER SHALL BE OF THE SAME TYPE (E.G. HOT DIPPED NAILS WITH HOT DIPPED HANGERS) 8. ALL LUMBER WITH A LEAST DIMENSION OF 2" (NOMINAL) SHALL BE STAMPED "SURFACE - DRY" AND SHALL HAVE A MOISTURE CONTENT WHEN SURFACED AND WHEN INSTALLED OF NO MORE THAN 19 PERCENT. LUMBER WITH A LEAST DIMENSION OF 4" (NOMINAL) OR GREATER SHALL BE STAMPED "SURFACE -GREEN" AND AIR-DRIED TO A MOISTURE CONTENT OF NOT MORE THAN 19 PERCENT PRIOR TO ITS USE IN FRAMING THE STRUCTURE. 9. NOTCHING AND BORING OF BEAMS AND JOISTS IS NOT ALLOWED WITHOUT PRIOR APPROVAL OF THE STRUCTURAL ENGINEER OF RECORD. REQUIRED? (Y/N) MATERIAL / ACTIVITY Y N 1704.2.5 Inspection of Fabricators Verify fabrication/quality control procedures Y N 1705.1.1 Special Cases (work unusual in nature, including but not limited to alternative materials and systems, unusual design applications, materials and systems with special manufacturer's requirements) 1705.2 Steel Construction Y N 1. Fabricator and erector documents (Verify reports and certificates as listed in AISC 360, chapter N, paragraph 3.2 for compliance with construction documents) Y N 2. Material verification of structural steel Y N 3. Embedments (Verify diameter, grade, type, length, embedment. See 1705.3 for anchors) Y N 4. Verify member locations, braces, stiffeners, and application of joint details at each connection comply with construction documents 5. Structural steel welding: Y N a. Inspection tasks Prior to Welding (Observe, or perform for each welded joint or member, the QA tasks listed in AISC 360, Table N5.4-1) Y N b. Inspection tasks During Welding (Observe, or perform for each welded joint or member, the QA tasks listed in AISC 360, Table N5.4-1) Y N c. Inspection tasks After Welding (Observe, or perform for each welded joint or member, the QA tasks listed in AISC 360, Table N5.4-3) d. Nondestructive testing (NDT) of welded joints: see Commentary Y N 1) Complete penetration groove welds 5/16" or greater in risk category II I or IV Y N 2) Complete penetration groove welds 5/16" or greater in risk category II Y N 3) Thermally cut surfaces of access holes when material t > 2" Y N 4) Welded joints subject to fatigue when required by AISC 360, Appendix 3, Table A-3.1 Y N 5) Fabricator's NDT reports when fabricator performs NDT 6. Structural steel bolting: Y N a. Inspection tasks Prior to Bolting (Observe, or perform tasks for each bolted connection, in accordance with QA tasks listed in AISC 360, Table N5.6-1) Y N b.lnspection tasks During Bolting (Observe the QA tasks listed in AISC 360, Table N5.6-2) 1) Pre -tensioned and slip -critical joints Y N a) Turn -of -nut with matching markings Y N b) Direct tension indicator Y N c) Twist -off type tension control bolt Y N d) Turn -of -nut without matching markings Y N e) Calibrated wrench 2) Snug -tight joints Y N c. Inspection tasks After Bolting (Perform tasks for each bolted connection in accordance with QA tasks listed in AISC 360, Table N5.6-3) Y N 7. Inspection of steel elements of composite construction prior to concrete placement in accordance with QA tasks listed in AISC 360, Table N6.1 1705.2.2 Steel Construction Other Than Structural Steel 1. Material verification of cold -formed steel deck: Y N a. Identification markings Y N b. Manufacturer's certified test reports 2. Connection of cold -formed steel deck to supporting structure: Y N a. Welding Y N b. Other fasteners (in accordance with AISC 360,Section N6) Y N 1) Verify fasteners are in conformance with approved submittal Y N 2) Verify fastener installation is in conformance with approved submittal and manufacturer's recommendations 3. Reinforcing steel Y N a. Verification of weldability of steel other than ASTM A706 Y N b. Reinforcing steel resisting flexural and axial forces in intermediate and special moment frames, boundary elements of special concrete structural walls and shear reinforcement Y N c. Shear reinforcement Y N d. Other reinforcing steel 4. Cold -formed steel trusses spanning 60 feet or greater Y N a. Verify temporary and permanent restraint/bracing are installed in accordance with the approved truss submittal package 1705.3 Concrete Construction Y N 1. Inspection of reinforcing steel installation (see 1705.2.2 for welding) Y N 2. Inspection of prestressing steel installation Y N 3. Inspection of anchors cast in concrete where allowable loads have been increased per section OY N 1908.5 or where strength design is used 4. Inspection of anchors and reinforcing steel post -installed in hardened concrete: Per research reports including verification of anchor type, anchor dimensions, hole dimensions, hole cleaning procedures, anchor spacing, edge distances, concrete minimum thickness, anchor embedment and tightening torque Y N 5. Verify use of approved design mix Y N 6. Fresh concrete sampling, perform slump and air content tests and determine temperature of concrete Y N 7. Inspection of concrete and shotcrete placement for proper application techniques Y N 8. Inspection for maintenance of specified curing temperature and techniques 9. Inspection of prestressed concrete: Y N a. Application of prestressing force Y N b. Grouting of bonded prestressing tendons in the seismic -force -resisting system 10. Erection of precast concrete members Y N a. Inspect in accordance with construction documents Y N b. Perform inspections of welding and bolting in accordance with Section 1705.2 Y N 11. Verification of in -situ concrete strength, prior to stressing of tendons in post tensioned concrete and prior to removal of shores and forms from beams and structural slabs Y N 12. Inspection of formwork for shape, lines, location and dimensions Y N 13. Concrete strength testing and verification of compliance with construction documents Notes: 1. The inspection and testing agent(s) shall be engaged by the Owner or the Owner's Agent, and not by the Contractor or Subcontractor whose work is to be inspected or tested. Any conflict of interest must be disclosed to the Building Official prior to commencing work. The qualifications of the Special Inspector(s) and/or testing agencies may be subject to the approval of the Building Official and/or the Design Professional. 2. The list of Special Inspectors may be submitted as a separate document, if noted so above. 3. Special Insepctions as required by Section 1704.2.5 are not required where the fabricator is approved in accordance with IBC Section 1704.2.5.2 4. Observe on a random basis, operations need not be delayed pending these inspections. Perform these tasks for each welded joint, bolted connection, or steel element. 5. NDT of welds completed in an approved fabricator's shop may be performed by that fabricator when approved by the AHJ. Refer to AISC 360, N7. CONCRETE AND REINFORCING 1. CONCRETE SHALL CONFORM TO THE INDICATED REFERENCE CODES AND STANDARDS EXCEPT AS MODIFIED BELOW: ACI-301 - "STANDARD SPECIFICATIONS FOR STRUCTURAL CONCRETE" ACI-318 - "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE" ACI-305R - "HOT WEATHER CONCRETING" ACI-306R - "COLD WEATHER CONCRETING" ACI-304 - "GUIDE FOR MEASURING, MIXING, TRANSPORTING AND PLACING CONCRETE" 2. CONCRETE MIX SPECIFICATIONS LOCATION COMP. SRENGTH W/C RATIO AIR CONTENT REMARK FOOTING 2500 PSI (MIN. OF 5.5 SACKS OF CEMENT PER CUBIC YARD OF CONCRETE) SLAB ON GRADE 2500 PSI (MIN. OF 5.5 SACKS OF CEMENT PER CUBIC YARD OF CONCRETE) FOUNDATION WALL 2500 PSI (MIN. OF 5.5 SACKS OF CEMENT PER CUBIC YARD OF CONCRETE) TOPPING N.A. a. TOTAL AIR CONTENT IS SPECIFIED IN THE TABLE ABOVE. AIR CONTENT TOLERANCE SHALL BE ± 1 % AND SHALL BE MEASURED AT THE POINT OF PLACEMENT. (AFTER PUMPING IF APPLICABLE). ALL CONCRETE EXPOSED TO THE WEATHER SHALL HAVE AN APPROVED ADMIXTURE TO ENTRAIN AIR - 5% TOTAL AIR REQUIRED. CONCRETE THAT CAN BE SUBJECTED TO FREEZING AND THAWING DURING CONSTRUCTION SHALL BE AIR ENTRAINED. 3. PROVIDE GRADE 60 KSI (A615) FOR CONCRETE STEEL REINFORCING EXTENT REQUIRED? (Y/N) MATERIAL / ACTIVITY EXTENT Periodic 1705.4 Masonry Construction (A) Level A, B and C Quality Assurance: Y N 1. Verify compliance with approved submittals Periodic (B) Level B Quality Assurance: Y N 1. Verification of f'm and f'AAC prior to construction Periodic (C) Level C Quality Assurance: Y N 1. Verification of f'm and f'AAC prior to construction and for every 5,000 SF during construction Periodic Y N 2. Verification of proportions of materials in premixed or preblended mortar, prestressing grout, and Continuous grout other than self -consolidating grout, as delivered to the project site Each submittal Y N 3. Verify placement of masonry units Periodic (D) Levels B and C Quality Assurance: Periodic Y N 1. Verification of Slump Flow and Visual Stability Index (VSI) of self -consolidating grout as delivered Continuous Continuous to the project Periodic Y N 2. Verify compliance with approved submittals Periodic Y N 3. Verify proportions of site -mixed mortar, grout and prestressing grout for bonded tendons Periodic Y N 4. Verify grade, type, and size of reinforcement and anchor bolts, and prestressing tendons and Periodic Observe or Perform as noted (4) anchorages Y N 5. Verify construction of mortar joints Periodic Observe (4) Y N 6. Verify placement of reinforcement, connectors, and prestressing tendons and anchorages Level B - Periodic Level C - Continuous Observe or Perform as noted (4) Y N 7. Verify grout space prior to grouting Level B - Periodic Level C - Continuous Y N 8. Verify placement of grout and prestressing grout for bonded tendons Continuous Periodic Y N 9. Verify size and location of structural masonry elements Periodic Periodic Y N 10. Verify type, size, and location of anchors, including details of anchorage of masonry to structural Level B - Periodic Periodic members, frames, or other construction. Level C - Continuous Periodic Y N 11. Verify welding of reinforcement (see 1705.2.2) Continuous Each submittal (5) Y N 12. Verify preparation, construction, and protestion of masonry during cold weather (temperature Periodic below 40oF) or hot weather (temperature above 90oF) Observe or Perform as noted (4) Y N 13. Verify application and measurement of prestressing force Continuous Y N 14. Verify placement of AAC masonry units and construction of thin -bed mortar joints (first 5000 SF of Continuous Observe (4) AAC masonry) Y N 15. Verify placement of AAC masonry units and construction of thin -bed mortar joints (after the first Level B - Periodic Periodic 5000 SF of AAC masonry) Level C - Continuous Periodic Y N 16. Verify properties of thin -bed mortar for AAC masonry (first 5000 SF of AAC masonry) Continuous Periodic Y N 17. Verify properties of thin -bed mortar forAAC masonry (after the first 5000 SF of AAC masonry) Level B - Periodic Continuous Level C - Continuous Continuous Y N 18. Prepare grout and mortar specimens Level B - Periodic Periodic Level C - Continuous Perform (4) Y N 19. Observe preparation of prisms Level B - Periodic Level C - Continuous Observe or Perform as noted (4) 1705.5 Wood Construction Y N 1. Inspection of the fabrication process of wood structural elements and assemblies in accordance Periodic with Section 1704.2.5 Y N 2. For high -load diaphragms, verify grade and thickness of structural panel sheathing agree with Periodic approved building plans Periodic Y N 3. For high -load diaphragms, verify nominal size of framing members at adjoining panel edges, nail Periodic Each submittal or staple diameter and length, number of fastener lines, and that spacing between fasteners in each line and at edge margins agree with approved building plans Periodic Y N 4. Metal -plate -connected wood trusses spanning 60 feet or greater: verify temporary and permanent Periodic restraint/bracing are installed in accordance with the approved truss submittal package Periodic Periodic 1705.6 Soils 1. Verify materials below shallow foundations are adequate to achieve the design bearing capacity. Y N 2. Verify excavations are extended to proper depth and have reached proper material. Periodic Periodic Y N 3. Perform classification and testing of controlled fill materials. Periodic Continuous Y N 4. Verify use of proper materials, densities, and lift thicknesses during placement and compaction of Periodic Y N controlled fill Continuous Continuous 5. Prior to placement of controlled fill, observe subgrade and verify that site has been prepared Periodic Y N properly Periodic Periodic 1705.7 Driven Deep Foundations Y N 1. Verify element materials, sizes and lengths comply with requirements Continuous Y N 2. Determine capacities of test elements and conduct additional load tests, as required Continuous Y N 3. Observe driving operations and maintain complete and accurate records for each element Continuous Periodic. Y N 4. Verify placement locations and plumbness, confirm type and size of hammer, record number of Continuous Periodic blows per foot of penetration, determine required penetrations to achieve design capacity, record tip Continuous and butt elevations and document any damage to foundation element Y N 5. For steel elements, perform additional inspections per Section 1705.2 See Section 1705.2 Periodic or as required by the research report issued by an Y N 6. For concrete elements and concrete -filled elements, perform additional inspections per Section See Section 1705.3 approved source 1705.3 Y N 7. For specialty elements, perform additional inspections as determined by the registered design In accordance with construction documents professional in responsible charge Periodic Y N 8. Perform additional inspections and tests in accordance with the construction documents In accordance with construction documents Continuous 1705.8 Cast -in -Place Deep Foundations Continuous Y N 1.Observe drilling operations and maintain complete and accurate records for each element Continuous Periodic Y N 2. Verify placement locations and plumbness, confirm element diameters, bell diameters (if Continuous applicable), lengths, embedment into bedrock (if applicable) and adequate end -bearing strata Continuous capacity. Record concrete or grout volumes Continuous Y N 3. For concrete elements, perform additional inspections in accordance with Section 1705.3 See Section 1705.3 Y N 4. Perform additional inspections and tests in accordance with the construction documents In accordance with construction documents In accordance with construction documents In accordance with Section 1705.2 1705.9 Helical Pile Foundations Periodic Y N 1. Verify installation equipment, pile dimensions, tip elevations, final depth, final installation torque Continuous and other data as required. Periodic Y N 2. Perform additional inspections and tests in accordance with the construction documents In accordance with construction documents Periodic 1705.10.1 Structural Wood Special Inspections For Wind Resistance Y N 1. Inspection of field gluing operations of elements of the main windforce-resisting system Continuous Y N 2. Inspection of nailing, bolting, anchoring and other fastening of components within the main Periodic windforce-resisting system 1705.10.2 Cold -formed Steel Special Inspections For Wind Resistance Y N 1.Inspection during welding operations of elements of the main windforce-resisting system Periodic Y N 2.Inspections for screw attachment, bolting, anchoring and other fastening of components within the Periodic main windforce-resisting system 1705.10.3 Wind -resisting Components Y N 1. Roof cladding Periodic Y N 2. Wall cladding Periodic Y N 1705.11.1 Structural Steel Special Inspections for Seismic Resistance In accordance with AISC 341 Inspection of structural steel in accordance with AISC 341 1705.11.2 Structural Wood Special Inspections for Seismic Resistance Y N 1. Inspection of field gluing operations of elements of the seismic -force resisting system Continuous Y N 2. Inspection of nailing, bolting, anchoring and other fastening of components within the seismic- Periodic force -resisting system 1705.11.3 Cold -formed Steel Light -Frame Construction Special Inspections for Seismic Resistance Y N 1. Inspection during welding operations of elements of the seismic -force -resisting system Periodic Y N 2. Inspections for screw attachment, bolting, anchoring and other fastening of components within the Periodic seismic -force -resisting system STRUCTURAL AND MISCELLANEOUS STEEL STEEL MEMBERS, HARDWARE, FASTENERS SHALL BE HOT DIPPED GALVANIZED OR EPDXY PAINTED PER ARCHITECT REQUIREMENTS. ALL CUT, REPAIRED AND EXPOSED SURFACE SHALL BE PAINTED WITH (2) COAT OF 95% ZINC RICH PAINT PER ASTM A780. COLOR TO MATCH EXISTING. STEEL SHALL CONFORM TO THE FOLLOWING STANDARDS: TUBE COLUMNS: ASTM A500, GRADE B (Fy = 46 KSI) WIDE FLANGE COLUMNS / BEAN/ASTM 572 GR50 STEEL PIPE: SCHEDULE 40, CONFORMING TO ASTM A53, TYPE E OR S, GRADE B (Fy = 35 KSI.) ALL OTHER STEEL: ASTM A36 (Fy = 36 KSI) OR ASTM A992 BOLTS: ASTM A307 (WOOD/STEEL CONN) BOLTS: ASTM A325/A490 WITH LOCK WASHERS (STEEL/STEEL AND STEEL/CONC CONN) ANCHOR BOLTS: ASTM A307 (WOOD FRAMING) ANCHOR BOLTS: ASTM A325 (STEEL FRAMING) ALL SLIP CRITICAL CONNECTIONS SHALL BE ASTM A325 BOLTS AND SHALL BE ENGINEER -APPROVED, SELF -LOAD INDICATING TYPES, AND SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. STRUCTURAL STEEL WELDING CONFORM TO THE AWS CODES D1.1 AND D1.3, AND USE ONLY CERTIFIED WELDERS. WELDS NOT SPECIFIED ARE TO BE 1/4" CONTINUOUS FILLET MINIMUM. INCREASE WELD SIZE TO AWS MINIMUM SIZES, BASED ON PLATE THICKNESS. USE DRY E70 ELECTRODES. ALL WELDING SHALL CONFORM TO THE AWS CODES, AND SHALL BE BY CERTIFIED WELDERS. WELDS NOT SPECIFIED SHALL BE 1/4" CONTINUOUS FILLET MINIMUM. USE DRY E70 ELECTRODES. DRAWING LIST info@b2engineers.com 425-318-7047 (0) 425-318-0031 (C) CRY OF EDMONDS BUILDING DIVISION APPROVED PLAN Pam' OF WASy7 S Q- �,fj TPG 43789 O�cl� CTURA L ENGNG� sSIONAL PAUL &TRICIA HOFER REMODEL 8938179TH PL SW, EDMONDS, WA 98026 DRAWING INFO ISSUE DATE 11-19-20 ISSUED FOR PERMIT PROJECT NO.20157 ENGINEER BB REVISION SCHEDULE NO. I DATE DESCRIPTION RECEIVED Dec 14 2020 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT SHEET NUMBER S-0 S-1 SHEET NAME GENERAL NOTES AND SPECIFICATIONS FRAMING PLANS ISSUE DATE 11-19-20 11-19-20 BLD2020-1332 GENERAL NOTES S-2 FRAMING DETAILS 11-19-20 Grand total: 3 AND SPECIFICATIONS S-0 Copyright b2 Structural Engineers 2008 n BASEMENT ' 1 /4" = 1'-0" MAIN FLOOR 1 /41'= 1'-0" IMPORTANT NOTES ON FIELD VERIFICATIONS AND TEMPORARY SHORING: 1. CONTRACTOR SHALL REVIEW STRUCTURAL DRAWINGS AND FIELD VERIFY ALL RELATED EXISTING FRAMING & DIMENSIONS PRIOR TO ANY FIELD WORK. NOTIFY THE ENGINEER/OWNER ANY DISCREPANCIES FOUND IN THE FIELD. STRUCTURAL DRAWINGS MAY NOT CORRECTLY REFLECT ALL EXISTING FRAMING DUE TO LIMITED ACCESS TO THE SITE AND EXISTING DRAWINGS. 2. CONTRACTOR SHALL FIELD VERIFY AND NOTIFY THE ENGINEER/OWNER OF EXISTING MECHANICAL DUCTS, PLUMBING PIPES, ELECTRICAL WIRES THAT MAY INTERFERE WITH STRUCTURAL WORKS FOR COST CONSIDERATIONS PRIOR TO ANY FIELD WORK. 3. CONTRACTOR IS SOLELY RESPONSIBLE IN PROVIDING PROPER TEMPORARY SHORING PRIOR TO REMOVING ANY STRUCTURAL ELEMENTS. PLEASE CALL ENGINEER FOR QUESTIONS IMPORTANT NOTES ON FOUNDATION AND FRAMING: 1. ALL FOOTINGS SHALL BEAR ON SUITABLE SOIL SUCH AS MIN. OF MEDIUM DENSE NATIVE SOIL OR COMPACTED STRUCTURAL FILL (NO SOFT OR ORGANIC MATERIALS). GEOTECHNICAL ENGINEER MAY BE REQUIRED TO ASSESS EXISTING SOIL CONDITIONS. 2. FOR FRAMING LUMBER TYPES AND GRADES, AND CONCRETE MIX REQUIREMENTS PLEASE SEE S-0 3. FOR PLYWOOD/OSB SHEARWALL SCHEDULE, PLEASE SEE S-2 4. N/A 5. PROVIDE (2) 2X6 OR (3) 2X4 STUD POSTS AT EACH END OF BEAMS, UNLESS NOTED OTHERWISE ON PLAN 6. SLAB ON GRADE SHALL BE MIN. 4" THICK WITH #3 AT 18" EACH WAY (AT MID -DEPTH) ON 6" COMPACTED CRUSHED ROCK. PROVIDE 1" SAWCUT JOINT AT 15 FT MAX. SPACING (EACH WAY) 7. FLOOR SHEATHING SHALL BE 3/4" PLYWOOD OR OSB WITH 10d AT 6" NAILING AT EDGES AND AT 12" AT FIELD 8. ROOF SHEATHING SHALL BE 1/2" PLYWOOD OR OSB WITH 8d AT 6" NAILING AT EDGES AND AT 8" AT FIELD IMPORTANT NOTES ON TRUSS AND FLOOR FRAMING DESIGN/SHOP DRAWINGS: 1. TRUSS FRAMING LAYOUT SHOWN IS GENERAL CONCEPT ONLY. CONTRACTOR/ TRUSS SUPPLIER MUST SUBMIT TRUSS SHOP DRAWINGS INCLUDING TRUSS TEMPORARY/ PERMANENT BRACING PLANS FOR ENGINEER'S REVIEW 2. TRUSS FRAMING PROFILE/ LAYOUT SHOULD CONFORM TO BOTH STRUCTURAL AND ARCHITECTURAL DRAWINGS. ANY DEVIATIONS SHALL BE APPROVED BY ENGINEER/ ARCHITECT PRIOR TO TRUSS DESIGN WORK. 3. TRUSS DEFLECTION CRITERIAS: FLOOR/DECK TOTAL LOAD = L/480 ROOF TOTAL LOAD = L/240 FLOOR/DECK LIVE LOAD = L/600 ROOF SNOW LOAD = L/300 ** MAXIMUM TOTAL LOAD DEFLECTION SHOULD NOT EXCEED 1.0" IN ALL CASES 4. FLOOR/ROOF FRAMING LAYOUT AND CONNECTORS (SUCH AS LUMBER PACKAGE BY SUPPLIERS) MUST BE SUBMITTED FOR ENGINEER'S REVIEW PRIOR TO CONSTRUCTION info@b2engineers.com 425-318-7047 (0) 425-318-0031 (C) CITY OF EDMONDS BUILDING DIVISION APPROVED PLAN �\ 8_q Q.� WASy7 s'A �F Q- �ip TQG 43789 CTVRA L ENGNG� NA FRAMING FRAMING SYMBOLS: A SIMPSON WSW STRONG WALL (24" WIDE) p CONTINOUS POST � PLYWOOD SHEARWALL OOP6 BELOW THIS FLOOR PAU L & TRI C IA �p POST STARTS AT HOFER REMODEL A SHEARWALL HOLDOWN THIS FLOOR LEGEND AND NOTES 1 /4" = 1'-0" II II II II II II II II II I IPROVIDE 4X8 HEADER FOR II I II NEW OPENING BELOW H1- I 13). SEE 3 OF S-2 FOR I IHEADER FRAMING DETAIL 11 11 11 k 11 1 11 II II I I II II I II II II I I II II I II II II I I II II I II II II I I II II I II II II I I II II 1 II II II I I II II I II II II I I II II I II II II II II II II II I 1 ------- ------ //- II II II II II � -%-- II II � � I I II II p NEW 5.5X12 GLB EXISTING POST 24F-V4 DF/DF (131-1) - TO REMAIN I I II II I I II II I II 1 II II II II II II II II II II I _____�TT �� ____ 11 II II III II II II II II I II II EXISTING ROOF FRAMING TO REMAIN 11 11 I I 11 11 1 11 11 11 I I 11 11 1 11 11 11 I I 11 11 1 11 11 11 I I 11 11 1 11 1 PSLOHEADER BELOW 11 I 11 11 1 11 I (H1-1)11 11 I I 11 11 1 11 11 11 I I 11 11 1 11 1xiI II II II II II II II ICI EXISTING RIDGE BEAM TO REMAIN I I � � I I 8938179TH PL SW, EDMONDS, WA 98026 DRAWING INFO ISSUE DATE 11-19-20 ISSUED FOR PERMIT PROJECT NO.20157 ENGINEER BB REVISION SCHEDULE NO. I DATE I DESCRIPTION RECEIVED Dec 14 2020 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BLD2020-1332 FRAMING PLANS ROOF PLAN 1 /4" = 1'-0" S-1 Copyright b2 Structural Engineers 2008 EXISTING RIDGE BEAM TO REMAIN R EXISTING ROOF X EXISTING ROOF FRAMING TO REMAIN OVERFRAME � I EXISTING POST TO REMAIN F CUT EXISTING ROOF OVERFRAME AS REQUIRED TO FIT NEW BEAM PROVIDE L50 ANGLE (BOTH ENDS OF NEW BEAM) I Detail 1 1 /2" = 1'-0" j m h PROVIDE DOUBLE BLOCKING UNDER NEW POST NEW BEAM PER PLAN NEW STUD POSTS PER PLAN NAILED TOGETHER W/ 10d AT 6" (BOTH SIDES) NEW STUD POST 3-2X4 NAILED TOGETHER W/ 10d AT 12" (BOTH PROVIDE L30 ANGLE SIDES) (BOTH SIDES, TOP AND BOTTOM OF NEW POST) EXISTING SLAB ON GRADE PER PLAN -CONTRACTOR TO FIELD CONTRACTOR TO FIELD -VERIFY EXISTING FOOTING VERIFY EXISTING FOOTINGI- III III III III III 111 III III III III III III III III III -I PROVIDE AC POST CAP (BOTH SIDES) PROVIDE DOUBLE BLOCKING UNDER NEW POST EXISTING ROOF FRAMING TO REMAIN NEW HEADER 4x8. FOR HEADER FRAMING DETAIL SEE 3/ S-2 1 11 1 z 1 1 0- 1 1 ry w I z — PROVIDE L50 ANGLE FOR JOIST TO RIM CONNECTION EXISTING DECK I I (SEE PLAN FOR LOCATIONS) FRAMING TO REMAIN X H L EXISTING FLOOR FRAMING TO REMAIN EXISTING WALL TO REMAIN Detail 2 3/4" = 1'-0" DBL STUD o�i ni TRIMMER SEE HEADE SCHEDULE (2) 2x6 SILL x4 TO MATCH REA OF TUDS ABOVE J JD OMER AND 2 KING STUD NAILED THER OR POST PER PLAN 1 OPENING HEADER 1 6 FT MAX. 4X8 DF #2 U D/PLAT E ECTION, PROVIDE TOENAIL OR I END NAIL -1 CUT EXISTING ROOF OVERFRAME AS REQUIRED TO FIT NEW BEAM m CUT EXISTING TOP PLATES IF REQUIRED TO FIT NEW HEADER; PROVIDE CS16X24 STRAP (BOTH TYPE PLYWOOD OR OSB SHEATHING (NOTE 7) PANEL EDGE NAILING (NOTE 4) PANEL EDGE STUDS AND BLKG ANCHOR BOLTS AT SILL PLATE (NOTE 8) TOP/SILL PLATE TO BLOCKING/ BOTTOM PLATE TO RIM (NOTE 9) BLOCKING/ RIM (NOTE 4) CAPACITY (LRFD) (SEISMIC/WIND) SW6 15/32" PLY/OSB ONE SIDE 10d COM AT 6" 2x 5/8" AT 36" O.C.-2x SIMPSON LTP4 AT 24" O.C. 16d COM AT 6" O.C.-NARROW 496 PLF/ 696 PLF SW4 15/32" PLY/OSB ONE SIDE 10d COM AT 4" 2x (SEE NOTE 5) 5/8" AT 24" O.C.-2x SIMPSON LTP4 AT 16" O.C. 16d COM AT 4" O.C.-NARROW 736 PLF/ 1032 PLF SW3 15/32" PLY/OSB ONE SIDE 10d COM AT 3" 3x 5/8" AT 18" O.C.-2x SIMPSON LTP4 AT 12" O.C. 16d COM AT 3" O.C.-WIDE 960 PLF/ 1344 PLF SW2 15/32" PLY/OSB ONE SIDE 10d COM AT 2" 3x 5/8" AT 12" O.C.-2x SIMPSON LTP4 AT 8" O.C. 16d COM AT 2" O.C.-WIDE 1232 PLF/ 1724 PLF SW44 15/32" PLY/OSB TWO SIDES 10d COM AT 4" 2x 5/8" AT 18" O.C.-3x SIMPSON LTP4 AT 16" O.C. B.S. 2 16d COM AT 4" O.C.-WIDE 1472 PLF/ 2064 PLF SW33 15/32" PLY/OSB TWO SIDES 10d COM AT 3" 3x 5/8" AT 16" O.C.-3x SIMPSON LTP4 AT 12" O.C. B.S. (2) 16d COM AT 3" O.C.-WIDE 1920 PLF/ 2688 PLF SW22 15/32" PLY/OSB TWO SIDES 10d COM AT — 3x 5/8"AT 12" O.C.-3x SIMPSON LTP4 AT 8" O.C. B.S. (2) 16d COM AT 2" O.C.-WIDE 2464 PLF/ 3448 PLF SHEARWALL SCHEDULE NOTES: 1. ALL PANEL EDGES TO OCCUR OVER STUDS, PLATES, RIMS OR HORIZONTAL BLOCKING AT WALLS 2. NAIL SHEATHING TO INTERMEDIATE SUPPORTS/ FIELD NAILING 10d AT 12" O.C. 3. ALL NAILS INTO 3x MEMBERS SHALL BE STAGGERED. (2)2x STUDS MAY BE USED IN LIEU OF 3x STUDS AT PANEL JOINTS. NAIL STUDS TOGETHER W/2 ROWS 16d COMMON AT 6" O.C. AT SINGLE SIDE SHEATHING AND NAIL WITH 2 ROWS OF 16d COMMON AT 3" O.C. AT DOUBLE SHEATHED WALLS. 4. COM DENOTES COMMON NAILS. MIN. NAIL PENETRATION INTO PLATE, RIM OR BLOCKING SHALL BE 1 5/8". STAGGER BOTTOM PLATE NAILING 5. FOR SHEARWALL SW4, ALL FRAMING MEMBERS RECEIVING EDGE NAILINGS FROM ABUTTING PANELS SHALL BE 3X OR (2) 2X NAILED TOGETHER WITH 16d AT 6" 6. WHERE SHEATHING IS APPLIED TO BOTH SIDES OF WALL, OFFSET PANEL EDGES TO FALL ON DIFFERENT STUDS. 7. PROVIDE SHEAR WALL SHEATHING AND NAILING FOR ENTIRE LENGTH OF WALLS NOTED ON PLAN. PROVIDE HOLDOWNS PER PLAN AT EACH END OF WALL, LINO. PROVIDE (2) 2X STUDS AT ENDS OF ALL SHEARWALL. FACE NAIL MULTIPLE STUDS WITH 16d AT 12" PROVIDE PANEL EDGE NAILING IN EACH HOLDOWN STUD AT END OF WALL. 8. ALL FOUNDATION SILL PLATES SHALL BE PT MEMBERS AND THE ANCHOR BOLTS SHALL HAVE MIN. OF 7" EMBEDMENT WITH 1/4" x 3" x 3" PLATE WASHER OR SIMPSON'S BP/ BPS PLATE. END OF WALL ANCHOR BOLTS SHALL BE LOCATED MAX 12" AND MIN 5" FROM END OF THE PLATE. 9. WHERE NOTED IN DETAILS, USE SIMPSON A35 IN LIEU OF LTP4 PLATES SPACE AT 2/3 OF LTP4 SPACING. SIMPSON HOLDOWN SIMPSON ANCHOR BOLTS* SIMPSON EPDXY ALL THREAD ANCHORS* HDU2 SSTB16 (5/8"ANCHOR WITH 12 5/8" MIN. EMBED.) 5/8" (12" EMBED WITH SET-XP) HDU4 SB 5/8X 24 (5/8"ANCHOR WITH 18" MIN. EMBED.) 5/8" (14" EMBED WITH SET-XP) HDU5 SB 5/8X 24 (5/8"ANCHOR WITH 18" MIN. EMBED.) 5/8" (16" EMBED WITH SET-XP) HDU8 SB 7/8X 24 (7/8"ANCHOR WITH 18" MIN. EMBED.) HDU11 SB 1X 30 (1"ANCHOR WITH 24" MIN. EMBED.) � ALL ANCHORS SHALL BE 2.5" MIN. HDU14 SB 1X 30 (1" ANCHOR WITH 24" MIN. EMBED.) FROM EDGE OF CONCRETE WALL SHEARWALL SCHEDULE 3/4" = 1'-0" 5 S-2 16d NAILING PER SCHEDULE PANEL EDGE NAILING 10d 2x BOTTOM PLATE SIMPSON STRAP ------------ PER PLAN (MIN. OF 48" LONG) SIMPSON LTP4 OR A35 CLIP FLOOR JOIST PANEL EDGE RIM OR BLOCKING NAILING TO UPPER TOP PLATE WALL TOP PLATE REFERENCE X PER PLAN AND SCHEDULE HOLDOWN PER PLAN (FOR SIMPSON HDU, SEE ANCHOR EMBED. DEPTH SCHEDULE) PANEL EDGE NAILING 10d ANCHOR BOLT PER SCHEDULE i FOUNDATION / ; PLATE WASHER (NOTE 8) P.T. SILL PLATE 2x OR 3x PER SCHEDULE a 7" EMBED MIN. ____-����F_— SIDES, BOTH ENDS) 7_____\1�h_\\ ILI� III �I II I I III I I I I I I I I I I — II � — — II NEW HEADER PROVIDE H2.5 TIE — PROVIDE L30 PER PLAN FOR EACH RAFTER ANGLE (T & B) PROVIDE L30 ANGLE (BOTH ENDS OF HEADER) NOTE: AT STUD/PLATE CONNECTION, PROVIDE (4) 8d TOENAIL 3'-0"+/- 14'-0" 3'-0" Ll PROVIDE 1/2 2 TRIMMER AND 1 KING STUD POSTS PLY/OSB NAILED WALL SHEATHING W/ 8d TOGETHER W/ 8d AT 6" (BOTH SIDES) AT 6" AT EDGES AND 8d AT 12" FIELD NAILING J L TENSION TIE PER PLAN HOLDOWN PER PLAN W/ 5/8" ALL SIMPSONTHREAD WITH EPDXYi PROVIDE 1/2"X6" TITEN HD SCREWS WITH SIMPSON BP WASHER AT 30" PROVIDE CS16 STRAP ABOVE THE OPENING PER DETAIL 4/S-1 �u 7u EXISTING CONCRETE FOUNDATION WALL TO REMAIN CONTRACTOR TO FIELD VERIFY EXISTING HEADER (4X10 HEADER MIN.) , TENSION TIE PER PLAN -2 J EXISTING ROOF FRAMING TO REMAIN PROVIDE H2.5 TIE FOR EACH RAFTER CUT EXISTING TOP PLATES IF REQUIRED TO FIT NEW HEADER; PROVIDE CS16X24 STRAP (BOTH SIDES, BOTH ENDS) PROVIDE L30 ANGLE (BOTH NEW HEADER ENDS OF HEADER) PER PLAN LY FE EXISTING DECK FRAMING TO REMAIN PROVIDE 1/2" PLY/OSB WALL SHEATHING W/ 8 AT 6" AT EDGES AND 8( AT 12" FIELD NAILING z N II - II N II u 2V PROVIDE A35 CLIP (T & B) AT 16" USE SHORT SCREWS IF REQUIRED EXISTING FLOOR FRAMING TO REMAIN HOLDOWN PER PLAN W/ 5/8" ALL THREAD WITH SIMPSON SET-3G EPDXY (14" MIN EMBEDMENT) PROVIDE 1/2"X6" TITEN HD SCREWS & SIMPSON BP WASHER AT 30" EXISTING FOUNDATION WALL TO REMAIN info@b2engineers.com 425-318-7047 (0) 425-318-0031 (C) CRY OF EDMONDS BUILDING DIVISION APPROVED PLAN �\ Bq� P� OF WASiy� S Q- �.fj TQG 43789 �<C� !( 7 o�� CT�RA L ENG�G� SSIONAL E PAUL &TRICIA HOFER REMODEL 8938179TH PL SW, EDMONDS, WA 98026 DRAWING INFO ISSUE DATE 11-19-20 ISSUED FOR PERMIT PROJECT NO.20157 ENGINEER BB REVISION SCHEDULE NO. DATE I DESCRIPTION RECEIVED Dec 14 2020 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BLD2020-1332 I FRAMING DETAILS nTYP. WALL OPENING FRAMING 3/4" = 1'-0" Detail 4 1 /2" = 1'-0" n Detail 5 3/4" = 1'-0" S-2 Copyright b2 Structural Engineers 2008