Loading...
APPROVED FIR FIR2021-0119+Fire_Sprinkler_Plan+10.25.2021_12.21.08_PM+2481102_N MAIN FLOOR FIRE SPRINKLER PLAN SCALE: 1/8" = 1'-0" UPPER FLOOR FIRE SPRINKLER PLAN SCALE: 1/8" = P-0" 1.Approved set of plans must be on site at the time of inspection. Failure to provide the approved set may result in a re -inspection fee. System drain(s) required at riser and must drain to the exterior. If riser is above lowest grade, 2nd drain required and signage at riser indicating location. Systems require signage IAW NFPA 13D. 2.Coverage required to the following areas: Clothes closets, linen closets and pantries exceeding 24 square feet in area, with the smallest dimension greater the 3' and having wall and ceiling surfaces of gypsum board. Bathrooms more than 55 square feet in area. When fuel fired equipment is present on covered decks or porches, or if living space above, at least one quick -response intermediate temperature sprinkler shall be installed above the equipment or area under living space. All fuel fired appliances, except attics if above all living areas. 3.Residential 13R add: Vertical back flow preventer must be tested annually. Strongly recommend system be monitored by fire alarm 120 VAC 6" BELL WIRED BY OTHERS I 11/V X 150'-0 UNDERGROUND DONE BY OTHERS 2 1" WATER METER (-4.0 PSI) 1"X 10'-0 UNDERGROUND DONE BYOTHERS� _EXISTING CITY MAIN_ _ _ _ _ , _ _ _ _ _ _ _ _ _ EXISTING CITY MAIN_ DALEY ST DALEY ST SITE PLAN SCALE:NTS Bucket test heads Approved DFM chr'�s gust South County Fire Date: 11 /03/2021 10 CLOSET UNDER 24 SQ.FT, NO AS. O BATHROOM UNDER 55 SQ.FT NO AS. Hydraulic Information OCCUPANCY CLASSIFICATION RESIDENTIAL DENSITY (GPM/FT2) 0.05 FOR 256.00FTz (ACTUAL 303.52FT2) TOTAL HEADS FLOWING 2 4.9 K-FACTOR TOTAL WATER REQUIRED 126.10 TOTAL PRESSURE REQUIRED 48.045 BASE OF RISER (GPM) 26.10 BASE OF RISER (PSI) 40.214 SAFETY MARGIN (PSI) +45.698 (48.7%) SECTION VIEW PLAN 11-03-2021 PLAN REVIEW Approved with condition: 1. System drain must drain to exterior. DFM Burt FIR2021-0119 VICINITY MAP tnVlrOnmental services Caspers St Caspers S1 d v' GlttnerLn Edmonds Food Bank Little Free Library v'sjaD1 $diN LP rae a Holy Rosary School0 • e I a a ti� ` Holy Rosary Church Q } K S nse eae J a Glen St Daley St, \ •323 Edmonds, WA 98020 Brackett's L/ending North Daley s Dakry St \ Sprague Sl Sprague St Ro ss of'Edmonds� ®United States Postal Service a'anSr B ,� N/y� Ed'/lory A UTeslas Drones T Ddughnuts� Chanterelle Be,lS1Free A ®elivery jS !! Ed / mo ds Ferry Terminal Dn 1 sOt Order Frances Anderson Cel 'um Q The MARKET © Q rn Edmonds Library - 8 eatery, afishmonger Sno-Isle Libraries m Salish Sea Brewing ©Co W Dayton St Dayton St 8 Restaurant Dayton St 104 s > Blueprint Mar ? " Maple St ©Best (Western Plus Edmonds Harbor Inn Alder St RISER DETAIL NODE TAG 24 PROJECT INFORMATION SCOPE OF WORK: INSTALLATION OF NEW FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH 2O16 NFPA 13D I CITY OF EDMONDS START POINT OF WORK: AT PLUMBERS OUTLET LEFT AT THE RISER LOCATION OCCUPANCY HAZARD CRITERIA OF: RESIDENTIAL WATER SUPPLY DATA: 100 PSI STATIC, 20 PSI RESIDUAL, 500 GPM SOURCE OF WATER SUPPLY DATA: EDMONDS UTILITIES LOCATION OF RISER: AS INDICATED ON DRAWINGS MATERIALS: UL LISTED I FM APPROVED PIPE: SPEARS CPVC FITTINGS: SPEARS CPVC SPRINKLER HEADS: VARIES - SEE PIPING PLANS CONTROL VALVE: AMES 2000E DCVA SUPERVISION: NONE ALARM: 6" ELECTRIC BELL WATERFLOW SWITCH: SYSTEM SENSOR FLOW SWTICH 1. ALL MATERIAL USED ON THIS PROJECT SHALL BE UL LISTED AND/OR FM APPROVED. ALL MATERIAL SHALL BE INSTALLED IN ACCORDANCE WITH NFPA, STATE, LOCAL CODES & MANUFACTURERS SPECIFICATIONS. FOR A DESCRIPTION OF ALL MATERIALS USED ON THIS PROJECT, SEE THE PRODUCT DESCRIPTIVE DATA SUBMITTED SEPARATELY. 2. ALL PORTIONS OF THE SPRINKLER SYSTEM SHALL BE ABLE TO DRAIN IN ACCORDANCE WITH NFPA. 3. ALL HANGER ASSEMBLIES SHALL BE INSTALLED IN ACCORDANCE WITH NFPA & MANUFACTURES SPECIFICATIONS. ALL HANGER ASSEMBLIES SHALL BE SPACED IN ACCORDANCE WITH NFPA, STATE AND LOCAL CODES. 4. ALL ELECTRICAL WIRING & CONNECTIONS SHALL BE PERFORMED BY OTHERS IN IT'S ENTIRETY. 5. ALL PAINTING OF SPRINKLER SYSTEM PIPING & COMPONENTS SHALL BE BY OTHERS IN IT'S ENTIRETY. 6. ALL SPRINKLER PIPE SIZES SHALL BE DERIVED FROM HYDRAULIC CALCULATIONS. HYDRAULIC CALCULATIONS SHALL BE PERFORMED IN ACCORDANCE WITH NFPA AND AS MODIFIED BY STATE & LOCAL CODES. FOR SPECIFIC DESIGN CRITERIA, SEE NOTES UNDER DESIGN CRITERIA. 7. THE OWNER IS RESPONSIBLE FOR ALL APPROPRIATE MAINTENANCE OF SPRINKLER SYSTEM PIPING AND COMPONENTS. NFPA, AS WELL AS STATE & LOCAL CODES. 8. THE OWNER IS RESPONSIBLE FOR THE FREEZE PROTECTION OF ALL SPRINKLER SYSTEM PIPING AND COMPONENTS THAT ARE NOT DESIGNED FOR FREEZING CONDITIONS. 9. THE OWNER IS RESPONSIBLE FOR ALL MONITORING OF THE SPRINKLER SYSTEM IN ACCORDANCE WITH STAT & LOCAL CODES. 10. UPON COMPLETION OF THIS PROJECT, ALL PIPING AND COMPONENTS SHALL BE HYDROSTATICALLY TESTED TO 200 PSI FOR 2 HOURS, IN ACCORDANCE WITH NFPA. WSFP SHALL PER -TEST THE SYSTEM PRIOR TO AHJ INSPECTION. 11. UPON COMPLETION OF THIS PROJECT A HYDRAULIC PLACARD SHALL BE POSTED ON THE SYSTEM RISER. 12. UPON COMPLETION OF THIS PROJECT ALL CONTROL VALVES SHALL BE LEFT IN THE OPEN POSITION. 13. UPON COMPLETION OF THIS PROJECT A STOCK OF SPARE SPRINLKERS SHALL BE PROVIDED PER NFPA. 14. ALL SPRINKLER PIPING AND FITTINGS SHALL BE CPVC PIPING AND FITTINGS UNLESS OTHERWISE NOTED. ALL PIPING AND FITTING SHALL BE INSTALLED IN ACCORDANCE WITH NFPA & MANUFACTURES SPECIFICATIONS. 15. ALL UNDERGROUND PIPING SMALL BE INSTALLED, TESTED AND FLUSHED BY OTHERS. 16. CENTRAL STATION MONITORING OF THE WATER FLOW INDICATORS, TAMPER SWITCHES & SUPERVISORY SWITCHES (IF REQUIRED) SHALL BE PROVIDED BY OTHERS (FIRE ALARM CONTRACTOR). CPVC GUIDELINES WSFP SHALL PROVIDE AN INSTALLATION THAT IS IN 100% COMPLIANCE WITH THESE GUIDELINES, BUT CANNOT BE RESPONSIBLE FOR THE WILLFUL OR NEGLIGENT ACTIONS OF OTHER PARTIES THAT DO NOT FOLLOW THE BELOW GUIDELINES. 1. DO NOT STACK, SUPPORT, HANG EQUIPMENT, OR HANG FLEXIBLE WIREICABLE ESPECIALLY COMMUNICATIONS CABLE, OR OTHER MATERIAL ON THE FIRE SPRINKLER SYSTEM. 2. DO NOT EXPOSE CPVC PRODUCTS TO INCOMPATIBLE SUBSTANCES, SUCH AS CUTTING OILS, NON -WATER -BASED PAINTS, PACKING OILS, TRADITIONAL PIPE THREAD PASTE AND DOPE, FUNGICIDES, TERMITICIDES, INSECTICIDES, DETERGENTS, BULKING CAULKING, ADHESIVE TAPE, SOLDER FLUX, FLEXIBLE WIREICABLE (WITH SPECIAL CONSIDERATION FOR COMMUNICATIONS CABLING), AND NON APPROVED SPRAY FOAM INSULATION MATERIALS. 3. NO NOT EXPOSE CPVC PRODUCTS TO EDIBLE OILS, SOLVENTS, OR GLYCOL -BASED ANTI-FREESE FLUIDS. 4. DO NOT EXPOSE CPVC PRODUCTS TO OPEN FLAME, SOLDER, AND SOLDERING FLUX. 5. DO NOT DROP, DISTORT, OR IMPACT CPVC PRODUCTS OR ALLOW OBJECTS TO BE DROPPED ON THEM. 6. DO NOT HANDLE CPVC PRODUCTS WITH GLOVES CONTAMINATED WITH OILS (HYDROCARBONS) OR OTHER INCOMPATIBLE MATERIALS. 7. DO NOT INJECT SYSTEM WITH MICROBIOLOGICALLY CONTROLLED CORROSION ("M.I.C:') INHIBITORS UNLESS THEY ARE LISTED IN COMBINATION WITH THIS SYSTEM. NFPA 13D 2016 ED - TABLE 7.5.6.3 MINIMUM DISTANCES FOR ORDINARY AND INTERMEDIATE TEMPERATURE RESIDENTIAL SPRINKLERS FROM EDGE FROM EDGE OF SOURCE TO ORDINARY OF SOURCE TO INTERMEDIATE TEMPERATURE SPRINKLER TEMPERATURE SPRINKLER HEAT SOURCE IN MM IN MM SIDE OF OPEN OR RECESSED FIREPLACE 36 900 12 300 FRONT OF RECESSED FIREPLACE 60 1500 36 900 COAL OR WOOD BURNING STOVE': 42 1050 12 300 KITCHEN RANGE 18 450 9 229 WALL OVEN 18 450 9 229 HOT AIR FLUES 18 450 9 229 UNINSULATED HEAT DUCT 18 450 9 229 UNINSULATED HOT WATER PIPES 12 300 6 150 SIDE OF CEILING OR WALL MOUNTED HOT AIR 24 600 12 300 DIFFUSERS FRONT OF WALL MOUNTED HOT AIR DIFFUSERS 6 150 18 450 HOT WATER HEATER OR FURNACE 6 150 3 76 LIGHT FIXTURE 0 W-250 W 6 152 3 76 250 W - 499 W 12 300 6 150 INSTALLATION DATA: RFC 49 (RA0616) MAXIMUM MAXIMUM MINIMUM REQUIRED THREAD SPRINKLER DISTANCE TO DISTANCE TO SPRINKLER DISCHARGE SIZE K-FACTOR SPACING WALL WALL FLOW PRESSURE INCH (MM) FT() FT (M) FT() GPM (LPM) PSI (BAR) 111 4.9 12 X 12 (3.6X3.6) 6(1.83) 8(2.43) 13 (49) 7.0 (0.48) 112" 4.9 14 X 14 (4.3X4.3) 7(2.13) 8(2.43) 13 (49) 7.0 (0.48) 112" 4.9 16 X 16 (4.9X4.9) 8(2.43) 8(2.43) 13 (49) 7.0 (0.48) 112" 4.9 18 X 18 (5.5X5.5) 9(2.74) 8(2.43) 17 (64.3) 12.0 (0.83) 112" 4.9 20 X 20 (6.OX6.0) 10 (3.05) 8(2.43) 20 (75.7) 16.7 (1.14) HANGER DETAIL SIDE MOUNT CPVC PIPE STRAP PIPE STRAP xtzxtw• i / ®/ / #511 WITH TEST & DRAIN SPRINKLER DETAIL � MAIN DRAIN RELIABLE MODEL RFC49 1 2-1116" 19 1"AMES 2000B DCVA (52 MM) MINIMUM 1%" X 150'-0 UNDERGROUND NODE TAG I SUPPLY (DONE BY OTHERS) 3 CONDITION: Must drain to the exterior. OFFSET C.P.V.C. HANGER SPACING RESTRAINER MAXIMUM HANGER SPACING FOR CPVC PIPE PIPE #5114 COMPOSR WOOD JOIST PIPE SIZE END HEAD DROP TEE OTHER 3/1 0'-6" TI 5'-6" 1" 0'-9" 2'-6" 6'-0" 11/a" 1'4" 3'-0" 6'-6" 11/2" 1'4" T-6" 7'-0" 2" V-0" 3'-6" 8'-0" TENTING DETAIL R-11 BATTING R-11 BATTING RAFTER SHEETROCK SPRINKLER PIPE SHEETROCK SPRINKLER PIPE R-11 BATTING RAFTER O SHEETROCK SPRINKLER PIPE NON -INSULATED PIPING (SHOWN FOR CLARITY ONLY) NO PLASTIC SHEETING (VISQUEEN) 106 Western States Fire Protection Co. �wtecti� .G'u�ee axd �� a subsitliary of AP/ Group, /AG 14690 NE 95TH ST UNIT 101 REDMOND, WA98052 TEL. 425.881.0100 WWW.WSFP.COM OWNERSHIP OF DOCUMENTS ALL DRAWINGS, SPECIFICATIONS, AND OTHER WORK PRODl1CTOFTHE ENGINEER FORTHIS PROJECTARE INSTRUMENTS OF SERVICE FOR THIS PROJECTONLYAND SHALL REMAIN THE PROPERTYOF THE ENGINEER WHETHER THE PROJECT IS COMPLETED OR NOT. REUSE OF ANY OF THE INSTRUMENTS OF SERVICE OF THE ENGINEER, BYTHE OWNER OR EXTENSIONS OFTHE PROJECT WITHOUT WRITTEN PERMISSION OFTHE ENGINEER SHALL BE ATTHE OWNER'S RISKAND THE OWNER AGREESTO DEFEND, INDEMNIFY, AND HOLD HARMLESS THE ENGINEER FROM ALL CLAIMS, DAMAGES, AND EXPENSES INCLUDING ATTORNEYS' FEES ARISING OUT OF UNAUTHORIZED REUSE OFTHE ENGINEER'S INSTRUMENTS OF SERVICE BYTHE OWNER OR BY OTHERS ACTNGTHROUGH THE OWNER 110ment.mmonnommemmen 00=31 I alga In 1 �ZOZ/sZ/06 a M 1 H z K `' lL � I 1 z � a. I LU F Z OU I Q d J 0 1 0 Z U 1 I Z V 2 F 1 I O O IL 0 M I- a 1 I Z H O w IX 1 M I= Q -I Lu LL 1 I V V w>u) 1 1 Q LL W = J E LL 1 13FI- 1 0 _U Qo �-- 1 V d Z ;Z U) 1 I W 0 C, w W 1 5= rn h C �ww U. <10-3:3 iA 60000MMOMMOOMMMennod REVISIONS NO. DATE DESCRIPTION Al ZL Al 0 Lu w w N m m in o Q Q Q Z J Lu J Lu J Lu 0: Ir X CL LL LL LL E b b o In In o E N t 2 t CL 1c ,e _,4> (A. J d d Ci V N in 0 LL- w w w CL H H v v I in o_ o_ `o Op, m 11i rn v rn v J L LLN Y N T C (ry6 N It u V ((, 0 U In LL LL z co LO 0 E a in NORTH 21 0 4 8 SCALE 1/8" = T-0" leelee Z a Wo a. W 00 W 00 le N J N J � Z W J o O ce, Ili cn /'1 111 327 LL RECEIVED Oct 26 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT DRAWN BY GDG WSFP PROJECT NUMBER KH1383 PRINT DATE 10-25-21 I W W