Building PermitType: COMMERCIAL BLDG Subtype: ACCESSORY STRUCTURE COM I Status: ISSUED
Parcel No: 00434212001500
Subdivision: 004342
Fire Sprinklers: No
Valuation: $19,401.12
Code Edition: 2018
Site Address: 550 MAIN ST EDMONDS,WA 98020-3183
Lot: 0
Lot Area: 19,791
Occupancy Type: U
No. Stories: 1
Zoning: BD1
Construction Type: VB
# of Dwelling Units: 0
Scope of Work: MAIN ST COMMONS- AMPHITHEATER PAVILION no M OR P
WA State Contractor L & I #: WILCOC*194Q0
Applied: 2/25/2022
Issued:5/10/2022
Final:
Expiration Date: 5/5/2023
Issued by: NED
CONTACTS
NAME TYPE
NAME
A
PHONE
EMAIL
APPLICANT
ANDREW MILLER
119 S MAIN STREET 200,
(206)900-0331
MILLER@ARCARCHITECTS.COM
SEATTLE WA 98104
CONTACT
ARC ARCHITECTS
119 S MAIN STREET 200,
(206)900-0331
miller@arcarchitects.com
SEATTLE WA 98104
234 5TH AVE S, EDMONDS WA
MMCISAAC@WILCOXCONSTRUCTION.
CONTRACTOR
WILCOX CONSTRUCTION
(425)774-4185
98020-
COM
MICHAEL MCMURRAY
9525 AIRPORT WAY,
OWNER
SEATTLE-SNOHOMISH
MILL
SNOHOMISH WA 98296
CO
-A
FEE INFORMATION
DESCRIPTION
ACCOUNT AMOU
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
3/4/22
R18443
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$25.00
5/10/22
R20122
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$220.00
$220.00
5/10/22
R20122
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00
$134.38
$134.38
5/10/22
R20122
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00
$776.56
$776.56
3/4/22
R18443
TOTALS: $1,195.94
$1,195.94
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Tuesday, May 10, 2022 11:22:52 AM 1 of 2
•M MERCIAL BLDG Permit
PERMIT NUM
of Edmonds
IF
EdmondsCity
121 5th Ave N, 98020BLD2022-02�954
www.edmondswa.gov•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
\r\n2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.\r\n3- SOUND OR NOISE - Sound/Noise originating from temporary
FOR
construction sites as a result of construction activity are exempt from the noise limits of
ALL BUILDING PERMITS
INFORMATION
ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am
to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the
noise originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.\r\n4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. \r\n5 - PLUMBING - Plumbing contractor license laws are regulated by
Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the
risks and potential monetary liability for work performed by unlicensed plumbing
contractors. For more information contact L&I Department of Licensing at 1-800-647-
0982.
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
FOR
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
INFORMATION
REQUIREMENTS.
Request final Fire Department Inspection 425-775-7720.
Any covering over 4 feet will require fire sprinklers, dry pendents are recommended, any
alteration of the sprinkler system will involve a separate permit.
FOR
FIRE FINAL INSPECTION
INFORMATION
Final approval subject to an on site inspection
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
provide manufactures installation instructions on site for Building Inspector.
Special inspections have been called for on this project and are noted on the approved
SPECIAL INSPECTION BUILDING
FOR
construction plans. It is the owner and or contractors responsibility to ensure that reports
DIVISION
INFORMATION
are provided to the City on a weekly basis.
INSPECTIONS-.
•nline
at: https://Inspection.MyBuildingPermit.co
COMPLETED RESULT
SEQID
INSPECTION TYPE
INSPECTOR
NOTES
DATE
X-1 FIRE FINAL
A-1 TESC AND MOBILIZE
E-3 STRM CONVEYANCE
E-3 STRM TIGHTLINE
X-2 ENGINEERING FINAL
Printed: Tuesday, May 10, 2022 11:22:52 AM 2 of 2