Loading...
Plumbing PermitType: PLUMBING Subtype: COMMERCIAL PLUMBING I Status: ISSUED Parcel No: 00434212001500 Subdivision: 004342 Fire Sprinklers: Valuation: $0.00 Code Edition: 0 Site Address: 550 MAIN ST EDMONDS,WA 98020-3183 Lot: 0 Lot Area: Zoning: Occupancy Type: Construction Type: No. Stories: 0 # of Dwelling Units: 0 Scope of Work: COPPERPOT BAKERY- PLUMBING Applied: 3/1/2022 Issued:5/11/2022 Final: Expiration Date: 11/7/2022 Issued by: NED WA State Contractor L & I #: STATEMC141C7 - Plumbing License #: STATEMC791NL CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL OR LICENSE # APPLICANT MICHELLE TRUMBLE 8705 S 222ND STREET, KENT WA (206)575-7527 MICHELLE@STATEMECH.NET 98031 CONTACT STATE MECHANICAL 8706 S 222ND ST, KENT WA (206)575-7527 michelle@statemech.net 98031 600 INDUSTRY DR #8, TUKWILA STEVEC@STATEMECH.NET CONTRACTOR STATE MECHANICAL (206)575-7527 WA 98188 STATEMC141C7 SEATTLE-SNOHOMISH MILL 9525 AIRPORT WAY, OWNER COMPANY INC SNOHOMISH WA 98296 •' I we DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 -BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $50.00 5/11/22 R20151 PERMITS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 5/11/22 R20151 PER PERMIT EACH PLUMBING FIXTURE ON ONE 001.000.322.10.000.00 $180.00 $180.00 5/11/22 R20151 TRAP PLUMBING - PLAN REVIEW FEE 001.000.322.10.000.00 $165.00 $165.00 5/11/22 R20151 HOURS WATER HEATER - INCLUDING 001.000.322.10.000.00 $15.00 $15.00 5/11/22 R20151 EXPANSION TANK TOTALS: $450.00 $450.00 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Wednesday, May 11, 2022 3:45:51 PM 1 of 2 PLUMBING Permit City of Edmonds PERMIT NUM www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. \r\n2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable.\r\n3- SOUND OR NOISE - Sound/Noise originating from temporary FOR construction sites as a result of construction activity are exempt from the noise limits of ALL BUILDING PERMITS INFORMATION ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.\r\n4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. \r\n5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647- 0982. FOR In addition to the required pressure relief valve an approved listed expansion tank shall EXPANSION TANK INFORMATION be installed on all hot water tanks per UPC 608. GAS PIPE TEST FOR Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted NFORMATION L INSPECTIONS - Schedule Online at: https://Inspection.MvBuildingPermit.com COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE X-0 PLUMBING FINAL" B-3 PLUMB ROUGH IN B-3 PLUMB GROUND WK B-3 GAS PIPING TEST Printed: Wednesday, May 11, 2022 3:45:51 PM 2 of 2