Loading...
Plumbing PermitType: PLUMBING Subtype: RESIDENTIAL PLUMBING I Status: ISSUED Parcel No: 00418000002200 Subdivision: 004180 Fire Sprinklers: Valuation: $0.00 Code Edition: 0 Site Address: 19115 DELLWOOD DR EDMONDS,WA 98026-6041 Lot: 0 Lot Area: Zoning: Occupancy Type: Construction Type: No. Stories: 0 # of Dwelling Units: 0 Scope of Work: PLUMBING -ASSOCIATED TO REMODEL BLD2022-0524 WA State Contractor L & I #: - Plumbing License #: Applied: 4/26/2022 Issued:5/12/2022 Final: Expiration Date: 5/12/2023 Issued by: BAC CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL OR LICENSE # APPLICANT RYAN BUMA 19115 DELLWOOD DR, (425)829-5524 RYAN.BUMA@GMAIL.COM EDMONDS WA 98026 CONTACT BUMA VENTURES 19115 DELLWOOD DR, (425)829-5524 ryan.buma@gmail.com EDMONDS WA 98026 CONTRACTOR OWNER 19115 DELLWOOD DR, OWNER BUMA EDMONDS WA 98026 11L FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 - BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $50.00 5/11/22 R20150 PERMITS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 5/11/22 R20150 PER PERMIT EACH PLUMBING FIXTURE ON ONE 001.000.322.10.000.00 $30.00 $30.00 5/11/22 R20150 TRAP TOTALS: $120.00 $120.00 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Thursday, May 12, 2022 10:26:07 AM 1 of 2 Adak PLUMBING Permit - City of • • • Pr 980,20 1 1 MMLwww.edmondswa.gov • • ML FL 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. \r\n2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable.\r\n3- SOUND OR NOISE - Sound/Noise originating from temporary FOR construction sites as a result of construction activity are exempt from the noise limits of ALL BUILDING PERMITS INFORMATION ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.\r\n4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. \r\n5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647- 0982. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION provide manufactures installation instructions on site for Building Inspector. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. • -. • a• •- • i • •'- • COMPLETED RESULT SEQID INSPECTION TYPE I INSPECTOR DATE X-0 PLUMBING FINAL** B-3 PLUMB ROUGH IN B-3 PLUMB GROUND WK Printed: Thursday, May 12, 2022 10:26:07 AM 2 of 2