Building PermitType: RESIDENTIAL BLDG Subtype: DECK I Status: ISSUED
Parcel No: 00741700000300 Site Address: 17003 72ND PL W EDMONDS,WA 98026-5108
Subdivision: EDMONDS VIEW DIV 1, 005131, 007417 Lot: 0
Fire Sprinklers: Lot Area: Zoning: RS-12
Valuation: $70,000.00 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: HARBO-PARKING DECK STRUCTURAL REPAIRS
WA State Contractor L & I #: IVANSRC911QR
Applied: 4/7/2022
Issued:5/12/2022
Final:
Expiration Date: 11/14/2022
Issued by: BAC
CONTACTS
m
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
LUIS SIALER
16008 MOTOR PL, LYNNWOOD
(425)877-7377
SIALERDESIGN@GMAIL.COM
WA 98082
CONTACT
SIALER DESIGN LLC
16008 MOTOR PL, LYNNWOOD
(425)877-7377
sialerdesign@gmail.com
WA 98082
IVAN'S REMODELING
16605 NE 30TH ST, BELLEVUE
CONTRACTOR
(206)856-1272
COMPANY
WA 98008
17003 72ND PL W, EDMONDS
OWNER
RANDY HARBO
WA 98026
DESCRIPTION
7PER
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
4/8/22
R19310
PERMIT
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$220.00
$220.00
5/6/22
R20025
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$890.00
$890.00
5/6/22
R20025
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$756.50
$756.50
4/8/22
R19310
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
5/6/22
R20025
TOTALS: $1,913.00
$1,913.00
CONDITION TYPE
STATUS
NOTES
Printed: Thursday, May 12, 2022 3:02:48 PM 1 of 3
'RESIDENTIAL
BLDG Permit
of Edmonds PERMIT NUM
EdmondsCity
98020 1 1 •
. •. •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
\r\n2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.\r\n3- SOUND OR NOISE - Sound/Noise originating from temporary
FOR
construction sites as a result of construction activity are exempt from the noise limits of
ALL BUILDING PERMITS
INFORMATION
ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am
to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the
noise originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.\r\n4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. \r\n5 - PLUMBING - Plumbing contractor license laws are regulated by
Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the
risks and potential monetary liability for work performed by unlicensed plumbing
contractors. For more information contact L&I Department of Licensing at 1-800-647-
0982.
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
ELECTRICAL PERMIT
O
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
ORMATION
ESC REQUIREMENTS
FOR
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
INFORMATION
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
INSPECTIONS
FOR
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INFORMATION
www.mybuildingpermit.com
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
The issuance of this permit in no way constitutes approval from any other agencies
REGULATING AGENCIES
FOR
having regulatory authority over the facility and this construction activity. It is the
INFORMATION
responsibility of the property owner to obtain any and all such required approvals.
FOR
All utilities shall be located prior to any excavation. New locates shall be called for if at
UTILITY LOCATES
INFORMATION
time of excavation, original locates are no longer identifiable.
Iffil
COMPLETED
SEQID INSPECTION TYPE INSPECTOR RESULT NOTES
DATE
X-3 BUILDING FINAL"
Printed: Thursday, May 12, 2022 3:02:48 PM 2 of 3
Printed: Thursday, May 12, 2022 3:02:48 PM 3 of 3