Loading...
ATT00001Washington State Department of Labor & Industries Your jobsite for permit number 3755637E was inspected 5/12/2022 by Ron Dormaier. The results of inspection are listed below: Inspections: Inspection Date Inspection Result Inspection Comment 5/12/2022 HVAC,Thermostat Approved Complete 5/12/2022 Miscellaneous,Other Approved Complete ee's Adequate 5/12/2022 VAC,AC/Heat Pump,Outdoor Unit Approved Complete C condenser, disconnect, OCPD & service outlet verified The following corrections were written on this inspection today. The following corrections were marked completed on this inspection today. You can view all inspection information on this permit online at Labor and Industries, electronic permit and inspection system. Additional fees may be assessed and will not appear until they are processed by our support team. If you do not have any correction(s), no further action is needed at this time. You may have one or more correction items needing attention: The results of your inspection request are attached. Your installation did not meet minimum safe -wiring standards required by Washington state law. [National Electrical Code, RCW 19.28, and/or WAC 296- 46B] Please note that per RCW 19.28.101(3); all corrections must be made within 15 days of the date issued. For correction items notated "Reinspect on Final"; you must complete the corrections within 15 days of the date issued and request a progress inspection or final inspection within 45 days of the date of this letter.