Loading...
Building PermitFAMILY HOME Permit City of Edmonds PERMIT NUM EdmondsADULT 98020 1 1 1 www.edmondswa.gov Type: ADULT FAMILY Subtype: AFH ADDITION -REMODEL Status: ISSUED HOME Site Address: 6907 MEADOWDALE BEACH RD EDMONDS,WA Parcel No: 00751500000400 Applied: 3/29/2022 98026-5233 Subdivision: 007515, 005131 Lot: 0 Issued: 5/13/2022 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $46,436.25 Occupancy Type: Construction Type: Expiration Date: 5/8/2023 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: GIRMAY- AFH GARAGE CONVERSION M INC, P SEP. WA State Contractor L & I #: CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT MOGES GIRMAY 6907 MEADOWDALE BEACH RD, (206)214-5211 MOGESGIRMAY@GMAIL.COM EDMONDS WA 98026 6907 MEADOWDALE BEACH RD, CONTACT MOGES GIRMAY (206)214-5211 mogesgirmay@gmail.com EDMONDS WA 98026 CONTRACTOR OWNER MOGES T SR & BIRRU SA 17110 67TH AVE W, EDMONDS OWNER (206)214-5211 GIRMAY WA 98026 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 - BASE FEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 5/13/22 R20215 PERMITS AIR CONITIONING SYSTEM OR HEAT 001.000.322.10.000.00 $50.00 $50.00 5/13/22 R20215 PUMP - 1.75 BTU OR LESS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 3/29/22 R19090 PER PERMIT PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $720.00 $720.00 5/13/22 R20215 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 1 $612.00 $612.00 1 3/29/22 R19090 RESIDENTIAL STATE SURCHARGE 001.000.237.150 1 $6.50 $6.50 5/13/22 R20215 TOTALS: $1,478.50 $1,478.50 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Friday, May 13, 2022 12:21:12 PM 1 of 3 -ADULT FAMILY HOME • _ rmit PERMIT NUM City of Edmonds www.edmondswa.gov 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. \r\n2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable.\r\n3- SOUND OR NOISE - Sound/Noise originating from temporary FOR construction sites as a result of construction activity are exempt from the noise limits of ALL BUILDING PERMITS INFORMATION ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.\r\n4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. \r\n5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647- 0982. CARBON MONOXIDE ALARMS SHALL BE INSTALLED OUTSIDE OF EACH SEPARATE SLEEPING AREA IN THE IMMEDIATE VICINITY OF THE BEDROOMS AND ON EACH LEVEL IN FOR CARBON MONOXIDE SYSTEMS NEW CONSTRUCTION AND IN EXISTING DWELLINGS WHEN ALTERATIONS, REPAIRS OR INFORMATION ADDITIONS REQUIRING A PERMIT OCCUR, OR WHEN ONE OR MORE SLEEPING ROOMS ARE ADDED OR CREATED. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ELECTRICAL PERMIT O Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. ORMATION FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS INFORMATION REQUIREMENTS. FIRE FINAL INSPECTION FOR Request final Fire Department Inspection 425-775-7720. NFORMATION Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Final approval on a project or final occupancy approval must be granted by the Building OCCUPANCY FOR Official prior to use or occupancy of the building or structure. Check the job card for all INFORMATION required City inspections including final project approval and final occupancy inspections. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. 61111 COMPLETED SEQID INSPECTION TYPE INSPECTOR RESULT NOTES DATE X-1 FIRE FINAL Printed: Friday, May 13, 2022 12:21:12 PM 2 of 3 rmit City •Edmonds- 111k• _ 98020 1 1 � 1 www.edmondswa.gov B-2 SLAB INSULATION B-3 EXT WALL SHEATHING B-3 EXTERIOR INSULATION B-3 MECH ROUGH IN B-3 UNDERFLR FRAMING B-4 DRYWALL FASTENING B-4 FRAMING B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" B-6 AFH COMPLIANCE Printed: Friday, May 13, 2022 12:21:12 PM 3 of 3