Loading...
Building Permit 2021Type: MISCELLANEOUS Subtype: PARKING LOT I Status: ISSUED Parcel No: 00434212000900 Subdivision: 004342 Fire Sprinklers: Valuation: $0.00 Code Edition: 0 Site Address: 526 MAIN ST EDMONDS,WA 98020-3148 Lot: 0 Lot Area: Zoning: Occupancy Type: Construction Type: No. Stories: 0 # of Dwelling Units: 0 Scope of Work: FIRE AND THE FEAST- PARKING LOT STRIPING Applied: 4/28/2022 Issued:5/13/2022 Final: Expiration Date: 11/9/2022 Issued by: NED I WA State Contractor L & I #: CUSTOW*178RR I CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT SHUBERT HO 526 MAIN, EDMONDS WA (206)588-5148 SHUBERT@FEEDMEHRG.COM 98020 CONTACT SHUBERT HO 526 MAIN, EDMONDS WA (206)588-5148 shubert@feedmehrg.com 98020 CONTRACTOR CUSTOM WOODWORK 1312 3RD ST, KIRKLAND WA (425)828-2579 98033 18411 AURORA AVE N, OWNER ELSIA LLC SHORELINE WA 98133 •' "OLE DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 5/2/22 R19869 PER PERMIT ENGINEERING INSPECTION FEE 001.000.341.82.000.00 $110.00 $110.00 5/13/22 R20233 PARKING LOT - SUB BLDG PERMIT 001.000.322.10.000.00 $50.00 $50.00 5/2/22 R19869 FEE PARKING LOT - SUB ENG 001.000.341.82.000.00 $25.00 $25.00 5/2/22 R19869 INSPECTION FEE PARKING LOT - SUB ENG PLAN 001.000.341.82.000.00 $25.00 $25.00 5/2/22 R19869 REVIEW FEE PARKING LOT - SUB FIRE 001.000.345.83.100.00 $50.00 $50.00 5/2/22 R19869 INSPECTION FEE PARKING LOT - SUB FIRE PLAN 001.000.342.40.000.00 $50.00 $50.00 5/2/22 R19869 REVIEW FEE TOTALS: $350.00 $350.00 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Friday, May 13, 2022 7:58:45 PM 1 of 2 -MISCELLANEOUS •_ rmit City of Edmonds PERMIT NUM www.edmondswa.gov• 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. \r\n2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable.\r\n3- SOUND OR NOISE - Sound/Noise originating from temporary FOR construction sites as a result of construction activity are exempt from the noise limits of ALL BUILDING PERMITS INFORMATION ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.\r\n4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. \r\n5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647- 0982. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ESC REQUIREMENTS FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD INFORMATION REQUIREMENTS. INSPECTIONS FOR SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INFORMATION www.mybuildingpermit.com Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. INSPECTIONS - -. •https://Inspection.MyBuildingPermit.com COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE X-3 BUILDING FINAL" X-2 ENGINEERING FINAL Printed: Friday, May 13, 2022 7:58:45 PM 2 of 2