Building Permit 2021Type: MISCELLANEOUS Subtype: PARKING LOT I Status: ISSUED
Parcel No: 00434212000900
Subdivision: 004342
Fire Sprinklers:
Valuation: $0.00
Code Edition: 0
Site Address: 526 MAIN ST EDMONDS,WA 98020-3148
Lot: 0
Lot Area: Zoning:
Occupancy Type: Construction Type:
No. Stories: 0 # of Dwelling Units: 0
Scope of Work: FIRE AND THE FEAST- PARKING LOT STRIPING
Applied: 4/28/2022
Issued:5/13/2022
Final:
Expiration Date: 11/9/2022
Issued by: NED
I WA State Contractor L & I #: CUSTOW*178RR I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
SHUBERT HO
526 MAIN, EDMONDS WA
(206)588-5148
SHUBERT@FEEDMEHRG.COM
98020
CONTACT
SHUBERT HO
526 MAIN, EDMONDS WA
(206)588-5148
shubert@feedmehrg.com
98020
CONTRACTOR
CUSTOM WOODWORK
1312 3RD ST, KIRKLAND WA
(425)828-2579
98033
18411 AURORA AVE N,
OWNER
ELSIA LLC
SHORELINE WA 98133
•' "OLE
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
5/2/22
R19869
PER PERMIT
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$110.00
$110.00
5/13/22
R20233
PARKING LOT - SUB BLDG PERMIT
001.000.322.10.000.00
$50.00
$50.00
5/2/22
R19869
FEE
PARKING LOT - SUB ENG
001.000.341.82.000.00
$25.00
$25.00
5/2/22
R19869
INSPECTION FEE
PARKING LOT - SUB ENG PLAN
001.000.341.82.000.00
$25.00
$25.00
5/2/22
R19869
REVIEW FEE
PARKING LOT - SUB FIRE
001.000.345.83.100.00
$50.00
$50.00
5/2/22
R19869
INSPECTION FEE
PARKING LOT - SUB FIRE PLAN
001.000.342.40.000.00
$50.00
$50.00
5/2/22
R19869
REVIEW FEE
TOTALS: $350.00
$350.00
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Friday, May 13, 2022 7:58:45 PM 1 of 2
-MISCELLANEOUS
•_ rmit
City of Edmonds PERMIT NUM
www.edmondswa.gov•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
\r\n2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.\r\n3- SOUND OR NOISE - Sound/Noise originating from temporary
FOR
construction sites as a result of construction activity are exempt from the noise limits of
ALL BUILDING PERMITS
INFORMATION
ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am
to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the
noise originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.\r\n4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. \r\n5 - PLUMBING - Plumbing contractor license laws are regulated by
Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the
risks and potential monetary liability for work performed by unlicensed plumbing
contractors. For more information contact L&I Department of Licensing at 1-800-647-
0982.
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
ESC REQUIREMENTS
FOR
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
INFORMATION
REQUIREMENTS.
INSPECTIONS
FOR
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INFORMATION
www.mybuildingpermit.com
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
INSPECTIONS - -. •https://Inspection.MyBuildingPermit.com
COMPLETED RESULT
SEQID INSPECTION TYPE INSPECTOR
NOTES
DATE
X-3 BUILDING FINAL"
X-2 ENGINEERING FINAL
Printed: Friday, May 13, 2022 7:58:45 PM 2 of 2