ENG2022-0175 ROW PERMITOF WAY EUC PERMIT
PERMIT NUMBER
City of Edmonds
EdmondsRIGHT
•:• • 1 1
www.cityofedmonds.gov• •
Description: ZIPLY - TRANSFER WIRES TO NEW POLE & REMOVE OLD POLE
ISSUED: 05/16/2022
Address: 302 6TH AVE S EDMONDS WA 98020-3405
EXPIRES: 11/16/2022
rmit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00434212201900
i
NAME TYPE NAME ADDRESS PHONE
APPLICANT VICTORIA COMER 708 FIRST STREET STE N-100, SNOHOMISH WA 98290 (183)051-3661
CONTACT ZIPLY FIBER 708 FIRST STREET STE N-100, SNOHOMISH WA 98290 (183)051-3661
CONTRACTOR ZIPLY FIBER 1800 41ST ST, EVERETT WA 98201 (425)949-0230
OWNER CHRIS H PICKERING 2611 NE 113TH ST 300, SEATTLE WA 98125
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT
$40.00 $40.00
RIGHT OF WAY STANDARD - EUC PERMIT FEE
$330.00 $330.00
1111
•
REQUIREMENT TYPE
NOTES
TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments
or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of
granting this permit.
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW
05/16/2022
RELEASED BY
DATE
Printed: Monday, May 16, 2022 12:11:17 PM 1 of 2
-KRWOF WAY EUC PERMIT
City of Edmonds
•:• •ENG2022-01751
. -. ov/425.771.0220
CONDITIONS
CONDITION TYPE
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
POTHOLING
VERIFY CLEAR BORE CROSSINGS.
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND AND NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE DATE
RESULT
COMPLETE
A-1 JOB START
X-2 ENGINEERING FINAL**
Printed: Monday, May 16, 2022 12:11:17 PM 2 of 2
RECEIVED
yI
of yEDA�O�O�
RIGHT OF WAY CONSTRUCTION APR 22 2022
- PERMIT APPLICATION
CITY OF EDMONDS
Complete and submit this Application in accordance with the Submittal DEVELOPMENT
SERVICES DEPARTMENT
l'vc. Ise0 Requirements outlined in Right -of -Way permit Handout E63.
If any field is not applicable to your project, write "N/A" instead of leaving blank.
All fields required. Incomplete Applications will be denied.
SECTION A
General Info
Project Name 5513301
Site Address or if no site address use Property Address at NW corner of project area: 302 6TH AVE S EDMONDS,WA
Associated Permits: BLD PLN ENG
Owner and Entity Holding Franchise (if applicable)
Name of Company Ziply Fiber Northwest, LLC Franchise Ordinance No: WN U-17
PointofContact Mike Hakahan
Title Engineer
Address1800 41 st St., Ste. N 100
city Everett
State WA
zip 98203
Phone 425-949-0230
Email mike.hakahan@ziply.com
AuthorizedContractor and Agent •below)
Name of Company Ziply Fiber Northwest, LLC
Primary Name RICH EVANS
Agent Name Mike Hakahan
Title Engineer
Title Engineer
Mobile 425-261-6282
Addressl800 41st St. Ste. N100
Email rich.evans@ziply.com
city Everett
I State WA
zip 98203
Secondary Name
Phone 425-949-0230
Title
Email mike.hakahan@ziply.eom
Mobile
City of Edmonds Business License No: 313-013-420
Email
State License No: ZIPLY*800L5
I, Contractor verifies it is currently bonded
Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
N,� Utility Franchise Work associated with development (check one of the above boxes as well)
❑ Traffic Control Only (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
❑ Utility Franchise Work (no associated development)
Project Description
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
Telecommunications and broadband provider Ziply Fiber to:Existing pole will be removed after the
TRANSFER OF ATTACHMENTS.PLACEMENT W ALLEY ARM, TRANSFFR 3 RSW,B, THEN REMOVAL OF OLD POLE.
SEE WORK PRINT FOR MORE DATAILED EXPLANATION.
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
JxJ
LF
SF
Alley 72 hours +
LF
JxJ
F
SF
Parking 72 hours +
LF
JxJ
LF
SF
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
1. The work in the right of way is on or for the following type of facilities:
* telecommunications ❑ cable ❑ power ❑ gas
❑ water ❑ sewer ❑ storm
1.
CompletedDetails of Work to be
Does the utility owner have existin overhead infrastructure in the area of work?
X
•
2.
Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)?
x
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
X
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility system?
X
5.
Does the work involve proposed additions to an aboveground utility system? If es:
X
Are the additions for the purpose of serving new commercial development?
Are the additions for the purpose of serving a single-family residential subdivision?
Details of • to be Completed
®i
6. Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
X
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
X
How many are existing? 11 How many are to be added? 11
6b.
Does your project involve poles? If yes:
X
How many poles are existing in the project area?
1
What is the height of the existing poles?
N/A
How many poles are to be removed?
1
Are additional poles to be laced?
x
How many? 11 1 What is the height of the additionalpoles? N/A
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
X
How many? 11 1 What is the height of the poles after? N/A
Describe the modification rebuild: ATTACHMENTS TRANFERED ,PLACE 10' ALLEY ARM,TRANSFER 3 BSW'
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE: JOHN LARSEN
.TE: 4-21-22
APPLICANT PRINTED NAME: JOHN LARSEN/ZIPLY FIBER
APPLICANT TITLE: PERMIT COORDINATOR
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
40-M I 02
ice,
�1 A-11187
A-1 1439
,0 100/10-2
p
40-74
cc
Ziply
123
3ISVNIV2Ja aNV_102li
3�81SNOd 3RJ SI 210J
ALDER Sl* l
SHEET
CONSTRUCTION NOTES
PLACING
-TRANSFER ATTACHMENTS
-PLACE 10' ALLEY ARM
-TRANSFER 3 13SWwS
-REMOVE OLD POLE
303 ilaiumb3H llwa3d
spuOwp310 AID
FU65
-joefoid pad} mad ay} 6ulanp sin000
ao pasneo sl }eqI spiepueIs Alp aad
!eM-;0-jgI5U Aj10 ul Sjuauaanoadual
96eluoa; ao saljlllln o} abewep
Ile eoeldaa/aledaa lleys;ueollddV
OISMAA
VOO/aANM0
OF
7-ZOZ/E 1/9I
431G, ..,
NOISIAIG ONI?EIDNION3
1N3W12JVd30 SEOI ��
1N3WdOIDA3a
SGNOW43 710 Ail
CHRIS PICKERING
?n6-459-1227
naniao)a
I CERTIFY THAT THE WORK I COMPLETD ON THIS WORK
ORDER AND AS -BUILT IS IN COMPLIANCE WITH ZIPLY
QUALITY STANDARDS AS IDENTIFIED ON THE IPQIP
CHECKLIST.
(SIGNATURE AND DATE)
TOTAL ALLOTTED HOURS
CONTACT SUPERVISOR IF ADDITIONAL
HOURS ARE REQUIRED TO COMPLETE PROJECT
CAP. X-TIME MAINT
CREW 0 0 0
SPLICING 0 0 0
W.O. DRIVER CONSTRUCTION START
❑ ETHERNET
® CIAC IN SERVICE DATE
❑ DAMAGE
❑ OTHER
CONSTRUCTION
I@ FLAGGING ❑ BRUSHING ❑ CONTRACTOR
PERMITS
MUNICIPALITY:EDMONDS
❑ BLANKET
❑ TCP/TRAFFIC
® DETAILED (NOT BLANKET)
❑ NO PERMIT REQUIRED
JOINT POLE
JFN/NJUNS#100081845
❑ NO JPN REQUIRED
POLE JPN JPN
OWNER TO FROM
® ❑ ❑ POWER
❑ ❑ ❑ CATV
❑ ® ❑ ZIPLY
ACCOUNT CODES
❑ 2411.001 POLES ❑ 2422.201 UG FIBER
❑ 2421.101 OH COPPER ❑ 2441.001 CONDUIT
❑ 2421.201 OH FIBER ® 34XX.XXX REMOVAL
❑ 2422.101 UG COPPER 0 64XX.XXX MAINT.
POINT OF CONTACT
SCHEDULING:
PHONE:
ENGINEER:
PHONE:
FACILITIES:
PHONE:
FIELDED BY:
JOHN WOOD
425-261-1412
RICH EVANS
425-261-6282
JEANETTE CHISHOLM
425-263-4011
OSP CONSTRUCTION
zipIy fiber
HLLK CUST RELO JPN 81845
302 6TH AV S
PROJECT 1 C.O. AREA: 967
NUMBER: 5513301 EXCH. CODE: 51419
DRAWN DATE: ENGR: RICH EVANS NTY: SNOHOMISH
4/19/2022 PHONE: 425-261-6282 FILE:
SCALE: 1:100 TAX DISTRICT: 3748F DWG 1 OF 1
TWNSHP: T27N RNG: R3E SEC: S24
51419-5513301
302 6TH AV S
EDMONDS, WA
SHOULDER CLOSURE
TORI F 0
SIGN
SPACING - - X
RURAL HIGHWAYS
60/65 MPH
800't
RURAL ROADS
45 55 MPH
500' t
URBAN ARTERIALS
35 40 MPH
350' t
RESIDENTIAL &
BUSINES DIST.
25/30 MPH
200" t
URBAN STREETS
25 MPH OR LESS
100"f
TART F I
MIMNIMUM TAPER LENGTH (L) IN FEET
LANE
WIDTH
(feet)
25 30
Posted Speed
35 40 45
(mph)
50 55
60 65 70
10
105
150
205
270
450
500
550
-
I -
I -
11
11511651
225
295
495
550
605
660
-
I -
12
125
180
245
320
540
600
1 660
720
-
CHANNELIZING DEVICE SPACING (FT)
MPH
TAPER
TANGENT
50 70
40
80
35/45
30
60
25/30
20
40
ENGINEERING DIVISION
....,7TED
Osv
15/113/2
ROAD
4-
WORK
AHEAD
SHOULDER
4-
CLOSED
AHEAD
IF CLOSING
SIDEWALKS. DIRECT
PEDESTRIANS TO
NEAREST
DESIGNATED
CROSSWALKS.
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE
NOTE:
1.FLASHING BEACON SHALL BE
INSTALLED AT EACH SIGN FOR
NIGHT-TIME USE.
2. DISTANCES MAY VARY AS APPROVED
BY THE ENGINEER.
3.FLAGGERS REQUIRED TO CONTROL
TRAFFIC WHENEVER THE CONTRACTOR
MUST INTERRUPT TRAFFIC FLOW
TO ACCESS THE WORK SITE WITH
MATERIALS OR EQUIPMENT.
LEGEND:
CONE OR CHANNELIZING DEVICE
(SEE STD 702)
RECEIVED
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
APR 22 2022
per city standards that is caused or
occurs during the permitted project.
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
IN
0
TRAMC CONTROL- PLAN
2 L_ANE 2 WAY RD: SHOULDER CLOSED
D
ROAD
WORK
AHEAD
J
3
A
y
4/19/2022
date
ZIPL_Y WO
5513301
ZIPLY PROJECT 302 6TH"S EDMONDS, WA