FIR2022-0051_Supplementals_5.17.2022_12.50.04_PM_2875509. OF tp,b
v OHO
MyBuildingPermit.com
Jurisdiction: Edmonds
Project Name: Dunn / Fairbanks Construction
Application ID: 1144150
Supplemental Name: Critical Area Determination - Fire
A site specific Critical Area Determination, issued by the Planning Division is required for any ground disturbing activities at the time
of application. A determination is valid for 5 years from the date in which the determination was made; after such date the city shall
require a new determination.
Does the property have a current Critical Area Determination on file with the City?
YES
If you answered YES, what is the Critical Area # (CRAXXXX-XXXX)?
If you answered NO, please apply prior to submitting for your permit. You can apply through MBP, Land Use, Critical Areas.
C RA2021-0184