Loading...
Permit_2022-0663CITY OF EDMONDS Building Permit My6uildingPermitxom Permit Information Permit Number RI ngngq-nFF� Issued Date 5/20/2022 Expiration Date 11/16/2022 Job Address 21313 82ND PL W Fee Paid $146.50 EDMONDS, 98026 Order Confirmation 1146777 Floor Related Permit# Suite Application ID 1141028 Contact Information Contact Name Asim Polovina Contractor Asko Construction LLC Phone Number (425)218-6332 Property Owner Peter W Shepperd LNI License# ASKOCCL82ODK Address 21313 82ND PL W EDMONDS, WA Phone# (425)218-6332 City Bus. License # ASKOCCL82ODK Property Owner Phone Tenant Name Job Description A (Single Family Residential) (Re -Roof Replacement - Roofing Only) Residence project involving ( The height of the building is not increasing.) Conditions - Post Permit on site. Do not cover until inspected. Do not start any work until the preconstruction meeting is completed. Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent, including an appropriately licensed contractor. I have furnished true and correct information. I will comply with all provisions of law and ordinances governing this type of construction work, whether specific herein or not. By submitting this application I give the jurisdiction permission to enter the property to perform inspections. I understand that failure to comply with the above may result in revocation of the permit. Applicant: Asim Polovina Page 1 of 2 t °F EDAf 0 1893 CITY OF EDMONDS Building Permit My6uildingPermitxom Permit Information Permit Number RI n9n99_nFF� Issued Date 5/20/2022 Expiration Date 11 /16/2022 Job Address 21313 82ND PL W Fee Paid $146.50 EDMONDS, 98026 Order Confirmation 1146777 Floor Related Permit# Suite Application ID 1141028 Inspections Inspection IVR Inspector Date Inspection IVR Inspector Date Tear Off or Sheathing Building Final Inspection Scheduling The issuance of this permit in no way constitutes approval from any other agencies having regulatory authority over the facility and this construction activity. It is the responsibility of the property owner to obtain any and all such required approvals. Page 2 of 2