Loading...
Building PermitType: RESIDENTIAL BLDG Subtype: NEW SINGLE FAMILY I Status: ISSUED Parcel No: 00513100002501 Subdivision: 005131, 005133 Fire Sprinklers: Yes Valuation: $574,092.34 Code Edition: 2018 Site Address: 15722 72ND AVE W EDMONDS,WA 98026 Lot: 0 Lot Area: Occupancy Type: R-3 No. Stories: 2 Zoning: Construction Type: VB # of Dwelling Units: 1 Scope of Work: ESLHA - KECK - NEW SFR. PLUMBING AND MECHANICAL INCLUDED WA State Contractor L & I #: EHCONC*1370Q Applied: 7/15/2021 Issued:5/20/2022 Final: Expiration Date: 5/20/2024 Issued by: BAC CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT KYLE ZERBEY 6522 9TH AVE NW, SEATTLE WA (206)930-5147 KYLE@STUDIOZERBEY.COM 98117 CONTACT STUDIO ZERBEY 6522 9TH AVE NW, SEATTLE WA (206)930-5147 kyle@studiozerbey.com ARCHITECTURE 98117 CONTRACTOR E & H CONSTRUCTION 5021 216TH PLACE SE, BOTHELL (425)486-4049 ehconstruction@aol.com WA 98021 OWNER KEVIN KECK 583 BATTERY ST 508N, SEATTLE (775)772-2630 WA 98121 •' • DESCRIPTION 71BASEcFEE ACCOUNT AMOUNT PAID PAID DATE RECEIPT # FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 5/20/22R20364 IT 1 - BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $50.00 5/20/22 R20364 PERMITS 2019 TRANSPORTATION IMPACT 112.502.345.86.000.00 $6,249.14 $6,249.14 5/20/22 R20364 FEE AIR CONITIONING SYSTEM OR HEAT 001.000.322.10.000.00 $50.00 $50.00 5/20/22 R20364 PUMP - 1.75 BTU OR LESS AIR HANDLERS - 10,000 CFM OR 001.000.322.10.000.00 $30.00 $30.00 5/20/22 R20364 LESS APPLIANCE VENTS 001.000.322.10.000.00 $30.00 $30.00 5/20/22 R20364 BACKFLOW - 2 INCH 001.000.322.10.000.00 $35.00 $35.00 5/20/22 R20364 BACKFLOW - OVER 2 INCH 001.000.322.10.000.00 $45.00 $45.00 5/20/22 R20364 BOILER OR COMPRESSOR - 50HP OR 001.000.322.10.000.00 $50.00 $50.00 5/20/22 R20364 LESS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 7/16/21 R13512 PER PERMIT EACH PLUMBING FIXTURE ON ONE 001.000.322.10.000.00 $330.00 $330.00 5/20/22 R20364 TRAP ENGINEERING INSPECTION FEE 001.000.341.82.000.00 $1,100.00 $1,100.00 5/20/22 R20364 ESLHA ADMINISTRATIVE 001.000.322.10.000.00 $2,385.00 $2,385.00 7/27/21 R13645 PROCESSING FEE Printed: Friday, May 20, 2022 3:09:59 PM 1 of 6 -RESIDENTIAL BLDG PermitCity - • • • • 121 98020 1 1 • www.edmondswa.gov DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # ESLHA CONSULTANT 001.000.322.10.000.00 $500.00 $500.00 7/16/21 R13512 COMPLETENESS REVIEW FEE ESLHA CONSULTANT REVIEW 1 001.000.62.524.20.41.00 $2,500.00 $2,500.00 7/27/21 R13645 ESLHA CONSULTANT REVIEW 2 001.000.62.524.20.41.00 $1,500.00 $1,500.00 9/24/21 R14972 FAN CONNECTED TO SINGLE DUCT 001.000.322.10.000.00 $105.00 $105.00 5/20/22 R20364 FURNACE OR FIREPLACE 001.000.322.10.000.00 $30.00 $30.00 5/20/22 R20364 HYDRONIC HEATING SYSTEM 001.000.322.10.000.00 $150.00 $150.00 5/20/22 R20364 PARK IMPACT - ADMIN FEE RES 001.000.322.10.000.00 $50.00 $50.00 5/20/22 R20364 PARK IMPACT FEE - SINGLE FAMILY 332.100.345.85.000.00 $2,734.05 $2,734.05 5/20/22 R20364 PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $3,620.00 $3,620.00 5/20/22 R20364 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $3,293.75 $3,293.75 7/27/21 R13645 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 5/20/22 R20364 STORMWATER ENGINEER REVIEW 001.000.341.82.000.00 $65.00 $65.00 5/20/22 R20364 FEE STORMWATER ENGINEER REVIEW 001.000.341.82.000.00 $130.00 $130.00 5/20/22 R20364 FEE STORMWATER GENERAL FACILITY 422.000.379.00.000.00 $1,934.38 $1,934.38 5/20/22 R20364 CHARGE SFR OVER 5000 TRANSPORTATION IMPACT ADMIN 001.000.341.82.000.00 $50.00 $50.00 5/20/22 R20364 FEE - SFR WATER HEATER - INCLUDING 001.000.322.10.000.00 $15.00 $15.00 5/20/22 R20364 EXPANSION TANK TOTALS: $27,127.82 $27,127.82 CONDITIONS CONDITION TYPE STATUS NOTES 48 HRS NOTICE-ENGR FINAL FOR 48 Working hours notice is required when requesting your FINAL engineering inspection. NFORMATION FOR ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. NFORMATION Printed: Friday, May 20, 2022 3:09:59 PM 2 of 6 'RESIDENTIAL BLDG Permit of Edmonds PERMIT NUM EdmondsCity 98020 1 1 • . •. • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. CARBON MONOXIDE SYSTEMS FOR CARBON MONOXIDE SYSTEMS NFORMATION It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION ESC REQUIREMENTS FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD INFORMATION REQUIREMENTS. As required by Ord 3632 the geotechnical engineer of record shall monitor this site during construction for compliance with the recommendations in the geotechnical report including site excavation, shoring, soil support for foundation, including piles, soil bearing capacity, sub drainage installation, soil compactions, and other geotechnical aspects of the construction. Specific recommendations contained in the approved geotechnical report must be implemented by the owner. The geotechnical engineer shall make written dated reports on the progress of the construction and submit the report to the City on a weekly basis until all site grading, drainage, foundation and associated ground work is complete. Omissions or deviations from the approved geotechnical report and or approved plans or specs shall be highlighted and immediately submitted in a separate letter to the City for review. The City shall be advised in writing of work stoppages of FOR more than one week. In addition to the geotechnical monitoring special inspections ESLHA REPORTS INFORMATION based on the provisions of IBC Section 1704 are required when specified. Other special inspections may also be required by the geotechnical engineer, architect, or structural engineer of record. At the completion of final site grading and all permitted structures a final geo technical report prepared by the geotechnical engineer shall be submitted to the City. This report shall contain a statement that, based upon his/her professional opinion, site observations, and testing during the monitoring of the construction, the completed development substantially complies with the recommendations in the geotechnical report and with all geotechnical related requirements. Any deviations or omissions in the report, plans, or specifications that occurred during construction shall be addressed separately. Occupancy, final approval, or release of the bond for the project shall not be granted until the report has been reviewed and accepted by the Building Official. Printed: Friday, May 20, 2022 3:09:59 PM 3 of 6 'RESIDENTIAL BLDG Permit PERMIT NUM of Edmonds EdmondsCity 98020 1 1 • www.edmondswa.gov FIRE FINAL INSPECTION FOR Request final Fire Department Inspection 425-775-7720. NFORMATION Approval of this foundation design is conditional subject to inspection of existing site soil FOR conditions. Retaining walls must be designed and constructed to resist the lateral FOUNDATION BEARING INFORMATION pressure of the retained material. Provisions must be made for the control and drainage of surface water around buildings. GAS PIPE TEST FOR Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted NFORMATION Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. HOSE BIBBS FOR Hose Bibbs are required to have a permanently affixed anti -siphon device installed. NFORMATION INSP PRIOR TO BACKFILL FOR Call for all required inspections. All work shall be inspected prior to backfill. NFORMATION LOT LINES STAKED FOR Lot line stakes must be in place at the time of foundation setback inspection. NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION provide manufactures installation instructions on site for Building Inspector. Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish the datum point and the point of average grade. Call for inspections to verify. These MAXIMUM HEIGHT FOR items must be consistent with the approved plan. If the proposed height of a building is INFORMATION within 12 inches of the maximum height permitted for the zone an elevation survey is required. Final approval on a project or final occupancy approval must be granted by the Building OCCUPANCY FOR Official prior to use or occupancy of the building or structure. Check the job card for all INFORMATION required City inspections including final project approval and final occupancy inspections. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly visible from the street POST ADDRESS FOR or road fronting the property. Address numbers shall be Arabic numerals or alphabet INFORMATION letters Numbers shall be legible from the public way, at least 4 inches high with a half inch min stroke width on a contrasting background. FOR Electronic civil asbuilt shall be submitted to the City prior to final project acceptance. PROJECT CIVIL ASBUILT INFORMATION Asbuilt shall be submitted to Engineeringpermits@edmondswa.gov. FOR Pursuant to UPC 608 a pressure regulator valve (PRV) shall be installed near the water PRV REQUIRED INFORMATION shutoff. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. REQUIRED SPECIAL FOR INSPECTIONS INFORMATION FOR Heat pumps, AC units and similar equipment greater than 36 inches in height are not SIDE YARD EQUIPMENT INFORMATION allowed within required building setbacks. Printed: Friday, May 20, 2022 3:09:59 PM 4 of 6 'RESIDENTIAL BLDG Permit PERMIT NUM City of Edmonds 121 . •:� i 1 1 • . •. • Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND OR NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Special inspections have been called for on this project and are noted on the approved SPECIAL INSPECTION BUILDING FOR construction plans. It is the owner and or contractors responsibility to ensure that reports DIVISION INFORMATION are provided to the City on a weekly basis. FOR SPECIAL INSPECTION REPORTS Submit all special inspection reports to the City Building Official on a weekly basis. NFORMATION FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. City approved plastic piping may be used in water service piping provided that where FOR metal water service piping is used for electrical grounding purposes, replacement piping WATER SERVICE PIPING INFORMATION shall be of like materials (UPC 604.8) a state electrical permit and inspection is required if electrical grounding is altered or removed. FOR Pursuant to UPC 605.2 a water service shutoff shall be installed on the water line as it WATER SERVICE SHUTOFF INFORMATION enters the building. Installer shall provide the manufacturer installation, operating instructions, and a whole FOR WHOLE HOUSE FAN house ventilation system operation description. A label shall be affixed to the whole INFORMATION house timer control that reads "Whole house ventilation, see operating instructions". COMPLETED SEQID INSPECTION TYPE INSPECTOR R DATE A-1 BUILDING PRECON B-1 SETBACKS B-2 FND DAMPPROOFING B-2 FOOTINGS B-2 FOUNDATION WALL B-2 RETAINING WALL B-2 SLAB INSULATION B-3 EXT WALL SHEATHING B-3 EXTERIOR INSULATION B-3 GAS PIPING TEST B-3 MECH ROUGH IN B-3 PLUMB ROUGH IN B-3 ROOF SHEATHING B-3 UNDERFLR FRAMING B-3 WATER SERVICE LINE B-4 DRYWALL FASTENING B-4 FRAMING B-4 HEIGHT VERIFICATION B-4 INTERIOR SHEAR Printed: Friday, May 20, 2022 3:09:59 PM 5 of 6 RESIDENTIAL BLDG PermitCity • • • • - 98020 1 1 • www.edmondswa.gov B-4 SHOWER PAN B-5 BLDG SPECIAL INSPECTION B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" B-3 HYD PRESSSURE TEST B-5 CROSS CONNECTION A-1 PLANNING PRECON A-1 TESC AND MOBILIZE E-3 STRM CONVEYANCE E-3 STRM TIGHTLINE E-4 STRM STUB CONNECT E-4 WATER SERVICE LINE E-5 DRIVEWAY SLOPE E-7 DRY UTILITY LOCATION E-7 RESTOR LIMITS E-9 COMPOST AMEND E-9 FIRE AND AID SIGN E-9 PROJECT ASBUILTS X-2 ENGINEERING FINAL E-3 STRM FOOTING DRAIN A-1 ENGINEERING PRECON Printed: Friday, May 20, 2022 3:09:59 PM 6 of 6