Building PermitType: COMMERCIAL BLDG Subtype: COM ALTERATION OR REPAIR I Status: ISSUED
Parcel No: 27032300406400 Site Address: 190 W DAYTON ST EDMONDS,WA 98020
Subdivision: BSP AFN 8908155001 Lot: 0
Fire Sprinklers: Lot Area: Zoning:
Valuation: $30,000.00 Occupancy Type: Construction Type:
Code Edition: 2018 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: HARBOUR SQUARE- REPLACE ELEVATOR PIT
WA State Contractor L & I #: 16DLLL*882JT
Applied: 4/21/2022
Issued:5/27/2022
Final:
Expiration Date: 5/22/2023
Issued by: NED
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
EMMA HUTCHINSON
250 4TH AVE SOUTH, EDMONDS
(425)778-8500
EMMAH@CGENGINEERING.COM
WA 98020
CONTACT
CG ENGINEERING
250 4TH AVE SOUTH, EDMONDS
(425)778-8500
emmah@cgengineering.com
WA 98020
CONTRACTOR
16D LLC
10602 SW 110TH ST PO BOX
(206)218-4890
shelley@16dl1c.com
804, VASHON WA 98070
336 ADMIRAL WAY, EDMONDS
OWNER
PORT OF EDMONDS
WA 98020-7214
•' "m •
Lm
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100. 00
$40.00
$40.00
4/22/22
R19704
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$25.00
5/27/22
R20526
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00
$640.00
$640.00
5/27/22
R20526
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00
$544.00
$544.00
4/22/22
R19704
TOTALS: $1,249.00
$1,249.00
CONDITION TYPE
STATUS
NOTES
Printed: Friday, May 27, 2022 10:50:46 AM 1 of 2
•M MERCIAL BLDG Permit
of Edmonds PERMIT NUM
IF
EdmondsCity
121 5th Ave N, 98020 1 1 1
www.edmondswa.gov•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
\r\n2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.\r\n3- SOUND OR NOISE - Sound/Noise originating from temporary
FOR
construction sites as a result of construction activity are exempt from the noise limits of
ALL BUILDING PERMITS
INFORMATION
ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am
to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the
noise originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.\r\n4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. \r\n5 - PLUMBING - Plumbing contractor license laws are regulated by
Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the
risks and potential monetary liability for work performed by unlicensed plumbing
contractors. For more information contact L&I Department of Licensing at 1-800-647-
0982.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
provide manufactures installation instructions on site for Building Inspector.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
The issuance of this permit in no way constitutes approval from any other agencies
REGULATING AGENCIES
FOR
having regulatory authority over the facility and this construction activity. It is the
INFORMATION
responsibility of the property owner to obtain any and all such required approvals.
REQUIRED SPECIAL
FOR
INSPECTIONS
INFORMATION
COMPLETED RESULT
SEQID
INSPECTION TYPE
INSPECTOR
NOTES
DATE
X-1 FIRE FINAL
A-1 BUILDING PRECON
B-2 FOOTINGS
B-5 BLDG SPECIAL
INSPECTION
B-7 BUILDING OTHER INSP
Printed: Friday, May 27, 2022 10:50:46 AM 2 of 2