Loading...
Brubaker Residence Observation Report GG04.20.22C � ENGINEERING civil & structural engineering & planning STRUCTURAL OBSERVATION REPORT Project: Brubaker Residence Purpose: Foundation Assessment Location: 9712 242nd PI SW, Edmonds Date: 04/19/2022 CG Project: 21363.10 Report: 2 Client: Terianne Brubaker General Contractor: N/A Field Rep: Brandon Lang, PE, SE PURPOSE AND SCOPE A field representative of CG Engineering was on site on April 20,2022 to provide a structural observation of the garage and grade beam preparation for the slab placement. We met with the real the owner's contractor representative Jim Cavenaugh. OBSERVATIONS & RECOMMENDATIONS Garage Slab Preparation-- I met with Jim this morning and things are going well. There is one item that needs to be changed on the temporary piles supporting the back garage beam. We will need to keep the shoring posts in while the concrete grade beam and garage slab is placed. Howard's team will be back tomorrow to install the bearing plate on the two shoring piles. Jim will need to provide a bond breaker on the two temporary shoring piles within the grade beam so that they can be removed after the pour. A high strength grout would be used to fill the two holes in the grade beam after the new wood post is installed. The rebar slab reinforcing should be epoxied into the perimeter foundations. Inspection of the epoxy should be observed by a special inspector along with the rebar layout. DISCLAIMER This observation is the professional opinion of CG Engineering PLLC based on the information available during this assessment or evaluation. This report does not warrant or guarantee that all conditions were discovered at the time of the observation. This report was prepared subject to the standard of care applicable to professional services at the time the services were provided. 112022 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ph.425.778.8500 I f.425.778.5536 www.cgengineering.com Brubaker Residence CG Project No.: 21363.10 April 20, 2022 Page 2 of 2 Photo 1— Grade Beam with Temporary Pile Shoring 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ENGINEERING ph.425.778.8500 1 f.425.778.5536 www.cgengineering.com