Loading...
REVIEWED BLD2021-1665+Structural_Analysis_or_Calculations+12.8.2021_12.41.25_PM+2560466Project Description This project involves foundation stabilization for an existing single-family residence. After an initial site visit, it was determined that approximately 3-inches of settlement occurred to the single story additon on the western corner of the house. The foundation shall be stabilized with 2-inch diameter pipe piles. Additonally, the garage slab shows signs of deterioration and will be replaced with a structural slab supported by grade beams. Scope of Work We will provide stamped structural calculations and construction drawings suitable for permit and construction. Basis of Design Roof Dead 15 psf Live 25 psf (snow) Floor Dead 15 psf Live 40 psf Deck Dead 10 psf Live 60 psf 2-inch Dia. Pile Capacity 6000 Ibs Description By ERH Date 12 1 2021 Project Summary Checked Date / / ENGINEERING Seale NTS sheet No. 250 4th Ave South project Job No. Suite 200 Brubaker Residence 21363.10 Edmonds, WA 98020 Gravity Design Loads Roof DL Roofing Material 2.5 psf 3/4 Sheathing 2.3 psf Insulation 1.0 psf 5/8 Gypsum 2.8 psf 2x12 @ 24" OC 2.2 psf M/E 1.0 psf Misc 1.5 psf 13.3 psf USE 15.0 psf Floor DL Flooring Material 2.0 psf 3/4 Sheathing 2.3 psf Insulation 1.0 psf 5/8 Gypsum 2.8 psf 2x10 @ 16" OC 2.8 psf M/E 1.0 psf Misc 1.5 psf 13.4 psf USE 15.0 psf DECKS USE 10.0 psf Exterior Walls Siding 2.0 psf 1/2 Sheathing 1.5 psf Insulation 1.0 psf 5/8 Gypsum 2.8 psf 2x6 @ 16" OC 1.7 psf Misc 1.0 psf 10.0 psf USE 10.0 psf Roof ILL (Snow) 25.0 psf Floor ILL 40.0 psf Deck ILL 60.0 psf C Description Gravity Design Loads By ERH Date 11/01/21 Checked Date ENGINEERING Scale Sheet No. 250 4th Ave. South Suite 200 project Brubaker Residence Job No. Edmonds, WA 98020 21363.10 2 GRAVITY KEY PLAN - ROOF 210 (D) + 350 (S) PLF <-- --> 240 (D) + 400 (S) PL 18' I 40' 1 sFr ------- -- 1724 s.f. N O 10' 38' GRAVITY KEY PLAN - 2ND 18' Wd Dk 180 s.f. 438 (D) + 560 (L) + 479 (S) PLF <-- --> 440 (D) + 320.(L) + 400 (S) PLF 22 36' J Fin LFr G 968 s.f. 704 s.f.N co p co 0 2.2K (D) 861< (L) t 20' N R GRAVITY KEY PLAN - FDN �oc r•o F 718 (D) + 560 (L) + 475 (S) PLF <-- --> 983 (D) + 460 (L) + 400 (S) PLF -.2T I S E W 10I PERIMETER TO BE q STABILIZED WITH -MA WA MA IMMIAL's CN . _if MAMMA., FROM ABOVE 3 16' LD AD S LEFT S 10 F — Vvt-S Y vi-A- t_ L. R16 F+T 5',1 E ROOF D IS PSF D P U F, ROOF 1) 19 PS;F (3P')/9 't 2,4D rLF S-25PSr(Z(i')/;? 4. 350 PLF s . 2 5 P r(s 0 n #w �w R LL 2"D FLow U Ia PSF _13')%d. +wD eLr- � IS � p�P_ �h�7 rk-vQdv =.Ia t-' (101/a + gDPtV _� 7 L 'fO PSr 2�00 V Lr- l La Psi~ Ito' = 32D PLF 17k-Ck D y 10 PS{" (7'}'� 35 P1 F 15, F=to , _ P = FSD P F (wry-V-U) L = (00 ('SF 7 }21D, PLF FROM STRUCTURAL SLAB S _ 2 S ` (?'r $ PLF D = 150 PCF (3.5')(6"/12) = 263 PLF L = 40_ PCF (3.5') = 140 PLF 15T FLODV- , ID P L F 1-v VA-L, L i Ap 12� 16 F4i jI :/}../. I'GO c4 1� 1t 1IZ� + ( al� a0O PLC (� / ......... LEFT S 1 V E R16 wT S`I ID E IS -M1-AL D = 683 PLF D 959 PLF 470 C'LF _ . L 460 pLF S 438 PLF S = 4--00'IVLF 1 If-'Sl i I ENGINEERING 250 4th Ave. South Suite 200 Edmonds, WA 98020 425.778.8500 www.cgengineering.com Description N P 11✓E DESl (20 1791 PLF 1990 PLF Project SP,U AYT-R RV--S I2EN(,C- 1604 PLF 2057 PLF 2251 PLF By E--j2'H Date 1 I / 1/2-1 Checked Date Scale N-F,s Sheet No. Job No. 213(D3.tn MW