BLD2022-0742_Letter_6.7.2022_8.09.04_AM_291610121. FINAL INSPECTION
The Owner and the Contractor will conduct a final inspection of the Work on the date of completion. Any deficiencies
must be corrected within two weeks of the date of completion, or as reasonably practicable.
22. GOVERNING LAW AND VENUE
The performance, interpretation, and enforcement of this Agreement shall be governed in accordance with the laws of
the State of Washington. Any meditation, arbitration, or litigation arising out of or in connection with this Agreement
shall be conducted in King County, Washington.
23. ENTIRE AGREEMENT
This Agreement constitutes the entire agreement between the Parties. CONTRACTOR is not liable for nor bound in any
manner by any statements, representations, warranties, collateral or otherwise, or promises made by any person
representing or proposing to represent CONTRACTOR unless such statements, representations, or promises are set forth
in this Agreement. Any modification of this Agreement must be in writing and signed by the both parties.
CONTRACTOR: Owner/Client:
Authorized Signature Authorized Signature
6W.r PPr�-1 4IC44�A ✓�
Print Name and Title Print Name and Title
q11Z /'? Z-
DATE DATE
22-E095 CONTRACT.DOC PAGE 9 OF 9.
9 of 38
insurance. Workers are fully covered by Workmen's Compensation Insurance
The Proposed Price has been calculated based on the current prices for materials as of the execution of this Agreement. Contractor agrees to use his best
efforts to obtain the lowest possible prices from available material suppliers. If a significant price increase occurs during the period of time between contract
execution and substantial completion of the Project, the contract price shall be adjusted by an amount reasonably necessary to cover any increase. A
significant price increase shall mean any increase in price exceeding Five percent (5%)
Acceptance of Proposal- The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as
specified. Payment will be made as outlined above.
Terms: Net and payable upon receipt of Invoice. 1 %: % per month interest charged on delinquent accounts. Legal costs for collection will be paid by
customer. This quote serves as is by Washington Law.
Signature
Created on 03f31J2212:26:26
14 of 38
35
'es cri ption �— Ext. Price
Cost part Code Detail Ref. Condition Ref. FAIternate R.ef.
36
37
38
6" All metal dampened exhaust stem vents, Flashco Easy Flapper; Installed at existing bath and kitchen fan vent
locations. Positive connection to existing duct work at roof side only.
`7 ... ;
Install Deck Mount JC1426 Cavity Vent at defined locations.
0-17 -.3c,;C
3" Round Stainless Steel Drop Scupper Drains.
Custom Saddle at low slope transitions. Fully Soldered in 24 GA.
GUTTERS (Downspouts are to be reused)
39
6" K-Style Aluminum Gutters; Installed including miters, end caps and Drops at existing downspout locations.
WARRANTY
40_—.
3-D ROOF SYSTEMS LIMITED WORKMANSHIP WARRANTY
41 WA.RMASA
MALARKEY STANDARD SHINGLE AND ACCESSORY WARRANTY
42
POLYGLASS 12 YEAR MATERIAL WARRANTY
OPTIONAL ITEMS - THE FOLLOWING ITEMS ARE NOT INCLUDED IN PROJECT TOTALS
43 08 60 00 01
Replace existing 2'x4' ft Fixed Curb Mount Skylights with new. (Optional)
44 08 60 00 01
Replace existing 2'x2' ft Fixed Curb Mount Skylights with new. (Optional)
45 09 01 50 10
Allowance; for repair and correction of ceiling finishes by others.
Re -roofing of an existing structure may cause disturbance to interior surfaces and fixtures that may result in minor
cosmetic damages including but not limited too; nail pops, cracking of joints in wall boards, minor deflections, etc.
CONTRACTOR will exercise its best efforts in to minimize such occurrences, however; CONTRACTOR shall not be
responsible for disturbance, damage, clean-up or loss to interior property due to normal re -roofing activities required
to complete work as described by the contract documents. Pricing is provided as an allowance and for budgeting
purposes only. Owner may elect to have repairs made by a contractor of their choosing or by Sub -contractors of 3-D
Roof systems. If repairs are to be performed/managed by 3-D, additional costs will be billed per project documents.
(Optional)
$10,802.40
$1.00
$0.00
(Not included - Apply if selected)
$7,459.20
(Not included - Apply if selected)
$2,814.00
(Not included - y if sele ted)
$5,805.90
SubTotal $150,768.11
Tax $0.00
Shipping $0.00
Total $150,768.11 1
All material is guaranteed as specified by the manufacturer. All work to be completed in a workmanlike manner according to standard practices. Any
alteration or deviation from above specifications involving extra costs will be executed only upon owner orders and will become an extra charge over and
above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary
Created on 03j31/22 12:26:26